Responds to FOIA Request for Nine Categories of Records Re Damages Occurring to Nuclear Power Plants Following Earthquakes & 860131 Earthquake Near Perry Site.Forwards Apps a & B Documents.App B Documents Also Available in PDR
ML20195C718
Person / Time
Site: Perry, Seabrook, 05000000, Fort Saint Vrain, Vallecitos, 05000167
Issue date: 03/21/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Hiatt S
OHIO CITIZENS FOR RESPONSIBLE ENERGY
Shared Package
ML20195C722 List:
References
FOIA-86-91 NUDOCS 8605300469
Download: ML20195C718 (9)


Text

- _ ~ ,_ , . - - - --

z ,

8 g UNITED STATES -

8 o NUCLEAR REGULATORY COMMISSION

E WASHINGTON, D. C. 205S5 l

s...../ .

AIAR 21 1986 ,

Ms. Susan L. Hiatt ,

OCRE Representative IN RESPONSE REFER l 8275 Munson Road TO F01A-86-91 Mentor, OH 44060

Dear Ms. Hiatt:

~.

This is in response to your letter dated February 12, 1986, in which you 1 requested, pursuant to the Freedom of Information Act (F0IA), copies of l nine categories of records relating to damages occurring to nuclear power plants following an earthquake exceeding the operating basis earthquake and the January 31, 1986, earthquake occurring near the Perry site.

The records identified on enclosed Appendix A are enclosed. The staff did not correlate these records with the subject categories since several categories may be appropriate. You will be billed separately by our Division of Accounting and Finance in the amount of $47.05 for the enclosed 941 pages.

1 The records identified on enclosed Appendix B have previously been made available for inspection and copying at the NRC's Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555.

em During a recent telephone conversation with Nina Toms, you narrowed the scope of your request to exclude the draft inspection report. A copy of the final inspection report is listed at item 66 of Appendix A and is enclosed.

Sincerely,

~ ~

M Donnie H. Grimsley, Director Division of Rules and Records Office of Administration

Enclosures:

As stated 8605300469 860321 PDR FOIA HIATT86-91 PDR

f; ~ ..: = -.- u. -. 2 ....w. .. -- .::. :u.r.;.u:m .= ::= .n _ n - ,

Appendix A F0IA 86-91

1. No date Data Package Cover Sheet Instruction No. SVI-D51-T0279 (1 page)

Attachment 1, Triaxial Time-History Accelerograph Channel Calibration Prerequisite Sign-Off Sheet (1 page)

Attachment 2, Triaxial Time-History Accelerograph Channel Calibration (13 pages) ..

Attachment 3, System Restoration Checklist (3 pages)

~

Attachment 4, Reference Drawing (1 page)

Attachment 5 (1 page)

Attachment 6 (1 page)

Attachment 7 (1 page)

2. No date Data Package Cover Sheet Instruction No. SVI-D51-T0295 (1 page)

Attachment 1, Triaxial Seismic Switch Channel Calibration for D51-N150 Prerequisite Sign-Off Sheet (1 page)

Attachment 2, Triaxial Seismic Switch Channel Calibration for D51-N150 Data Sheet (5 pages)

Attachment 3, System Restoration Checklist (2 pages)

Attachment 4, Centering of Mass for Sensors; Starter Switchboard Parts Layout; Loop Diagram; Sensor Pot and Time Delay Pot Diagram (4 pages)

3. No date Data Package Cover Sheet Instruction No. SVI-D51-T5370 (1 page)

Attachment 1, Triaxial Time-History Accelerographs Seismic Trigger Channel Calibration for D51-N100 Prerequisite Sign-off Sheet (1 page)

Attachment 2, Triaxial Time-History Accelerographs Seismic Trigger Channel Calibration for 051-N100 Data Sheet (9 pages)' - -

Attachment 3, System Restoration Checklist (2 pages)

Attachment 4, Centering of Mass for Sensors; Starter Switchboard Parts Layout; Loop Diagram; Sensor Pot and Time Delay Pot. Diagram (4 pages) '

4. No date Data Package Cover Sheet Instrection No. SVI-051-T0302 (1 page)

Surveillance Instruction (2 pages)

Seismic Instruments Channel Check (9 pages)

Attachment 1, Sign-Off Verification Sheet (4 pages) J Attachment 2, System Restoration Checklist -(1 page)

I i 1 - o

c- m.~ ~ <

e ' ~ -' ' ~ *

~ m:aGa.u ::y. _. .

}

J

5. No date Data Package Cover Sheet Instruction No. SVI-D51-T0289-A (1 page)

Attachment 1, Triaxial Peak Accelerograph Channel Calibration for 051-R120 (Reactor Recirculation '

j Pump) Prerequisite, Sign-Off Sheet (-1 page)- l Attachment 2, Triaxial Peak Accelerograph Channel Calibration for D51-R120 (Reactor Recirculation Pump) Data Sheet (11 pages)

Attachment 3 System Restoration Checklist (1 page)

6. No date Data Package Cover Sheet Instruction No. SVI-D51-T0289-A ~

(1 page) '

Surveillance Instruction (2 pages) '

Triaxial Peck Accelerograph Channel Calibration for D51-R120 (Reactor Recirculation Pump) (27 pages)

Attachment 1, Trhxial Peak Accelerograph Channel Calibration for b 1-R120 (Reactor Recirculation Pump) Prerequisite Sign-Off sheet (1 page)

Attachment 2, Triaxial Peak Accelerograph Channel Calibration for D51-R120 (Reactor Recirculation Pump) Data Sheet (11 pages)

Attachment 3, System Restoration Checklist (1 page)

7. No date Data Package Cover Sheet Instruction No. SVI-D51-T0289-B (1 page)

Attachment 1, Triaxial Peak Accelerograph Channel Calibration for D51-R130 (HPCS Piping in Reactor Building) Prerequisite Sign-Off Sheet (1 page)

Attachment 2, Triaxial Peak Accelerograph Channel 7

Calibration for D51-R130 (HPCS Piping in Reactor Building) Data Sheet (10 pages)

Attachment 3, System Restoration Checklist (1 page)

8. No date Data Package Cover Sheet Instruction No. SVI-D51-T0289-C (1 page)

Attachment 1, Triaxial Peak Accelerograph Channel' Calibration for D51Sheet Prerequisite Sign-Off 'R140(1(HPCS page Pump) Base Mat)

Attachment 2, Triaxial Peak Accelerograph Channel Calibration for D51-R140 (HPCS Pump Base Mat)

! Data Sheet (10 pages)

Attachment 3, System R,estoration Checklist (1 page)

9. No date Data Package Cover Sheet Instruction No. SVI-D51-T0289-C (1page)

Attachment 1, Triaxial Peak Accelerograph Channel Calibration for D51-R140 (HPCS Pump Base Mat)

Prerequisite Sign-Off Sheet (1 page)

Attachment 2, Triaxial Peak Accelerograph Channel Calibration for D51-R140 (HPCS Pump Base Mat)

Data Sheet (10 pages)

Attachment 3 System Restoration Checklist (1 page) 2

y =::., a . - .. . ;:. - ~.:: :.: 2 ": = ' L..,'

a:w @ ^ " " *' '

i

10. No date Data Package Cover Sheet Instruction No. SVI-D51-T0304-A (1page)

Attachment 1, Triaxial Response Spectrum Recorder Channel Calibration for D51-R160 (Reactor Building Fcundation) Prcrcquisite Sign-Off Sheet (I page)

Attachment 2, Triaxial Response Spectrum Recorder Channel Calibration for D51-R160 (Reactor Building Foundation) Data Sheets (26 pages)

Attachment 3. System Restoration Checklist (1 page)

Attachment 4, Triaxial Response Spectrum Recorder .

Channel Calibration for D51-R160 (Reactor Building Foundation) Calculation Data Sheet (69 pages) .

11. No date Data Package Cover Sheet Instruction No. SVI-D51-T0304-B (1 page)

Attacht.ent 1 Triaxial Response Spectrum Recorder Channel Calibration for 051-R170 (Reactor Recirculation Piping Sup Sign-Off Sheet (1 page) port) Prerequisite Attachment 2, Triaxial Response Spectrum Recorder Channel Calibration for 051-R170 (Reactor Building Foundation) Data Sheets (16 pages)

Attachment 3, System Restoration Checklist (1 page)

Attachnent 4, Triaxial Response Spectrum Recorder Channel Calibration for 051-R170 (Reactor Recirculation Piping Support) Calculation Data Sheet (19 pages)

>' 12. No date Data Package Cover Sheet Instructio'n No. SVI-051-T0304-B (1 page)

Attachment 1, Triaxial Response Spectrum Recorder Channel Calibration for 051-R170 (Reactor Recirculation Piping Support) Prerequisite Sign-Off Sheet (1 page)

Attachmer.t 2, Triaxial Response Spectrum Recorder Channel Calibration,for 051-R170 (Reactor Building Foundation) Data Sheets (16 pages) - -

Attachment 3, System Restoration C'hecklist (1 page)

Attachment 4, Triaxial Response Spectrum Recorder Channel Calibration for D51-R170 (Reactor Recirculation Piping Support) Calculation Data Sheet (19 pages)

13. No date Data Package Cover Sheet Instruction No. SVI-D51-T0304-C (1 page)

Attachment 1, Triaxial Response Spectrum Recorder Channe1' Calibration for D51-R180 (HPCS Pum Mat) Prerequisite Sign-Off Sheet (1 page) p Base Attachment 2, Triaxial Response Spectrum Recorder Channel Calibration for 051-180 (HPCS Pump Base Mat) Data Sheets (16 pages)

Attachment 3 System Restoration Checklist (1 page) 3

-+ ; ;= .(=

Attachment 4, Triaxial Response Spectrum Recorder Channel Calibration for D51-R180 (HPCS Pump Base Mat) Calculation Data Sheet (19 pages)

14. No date Data Package Cover Sheet Instruction'No. SVI-D51-T0'304-D (1 page) ,

Attachment 1, Triaxial Response Spectrum Recorder {

Channel Calibration for D51-R190 (RCIC Pum Mat) Prerequisite Sign-Off Sheet (1 page) p Base l Attachment 2, Triaxial Response Spectrum Recorder . l Channel Calibration for D51-R190 (RCIC Pump Base Mat) Data Sheets (16 pages) .

Attachment 3, System Restoration Checklist (1 page)

Attachment 4, Triaxial Response Spectrum Recorder Channel Calibration for 051-R190 (RCIC Pump Base Mat) Calculation Data Sheet (19 pages)

15. No date Summary and Conclusions
16. No date Draft letter Stefano to Butler SUBJ: Sunnary Report of the Earthquake Meeting at the Perry Plant Site on February 11, 1986 (2 pages)

Enclosure 1 (1 page)

17. No date Draft set of questions and answers (9 pages)
18. No date Licensee handout to employees (2 pages)

~

4 19. No date C43-R0938 (2 pages)

20. No date Aftershocks and map (2 pages)
21. No date Notes (1 page)
22. No date The Cleveland Electric Illuminating Company, Perry Nuclear Power Plant 0perations Manual, Temporary Instructions, Revision 0 (12 pages) - -
23. No date The Cleveland Electric Illuminating Company, Perry Nuclear Power Plant Operations Manual, Temporary Instructions, Revision 1 (12 pages)
24. No date The Cleveland Electric Illuminating Company, Perry Nuclear Power Plant Operations Manual, Temporary

, Instructions, Revision 2 (13 pages)

25. 08/27/85 The Cleveland Electric Illuminating Company Perry Nuclear Power Plant Operations Manual (7 pages)
26. 12/17/85 SVI-G43-T1305-A (5 pages) i 27. 01/31/86 CAL Keppler to Cleveland Electric Illuminating (2 pages) l 4

i

,,t

.e

28. 01/31/86 , Letter to Palladino' from Seiberling (2 pages)
29. 01/31/86 Preliminary Notification (PN) (2 pages)
30. 01/31/86 Nuclear Network Operating Plant Experience (1 page)
31. 01/31/86 PAP-0201 (2 pages) . .
32. 02/01/86 PAP-0101 (1 page) '

l l

33. 02/02/86 Memo Lyster to Managers (2 pages) l
34. 02/02/86 Memo Anderson to All Instrument and Controls Section Personnel (2 pases)
35. 02/02/86 PAP-0201 (1 page)
36. 02/03/86 Memo to Managers from M. 1.yster Re: Work Control (2 pages)
37. 02/03/86 Memo to W. Kanda from Mike White Re: Annunciators on Seismic Panel ODSIR215 (I page)
38. 02/03/86 Initialed Review of Daily Instructions (Handwritten) from Robert Statman (1 page)
39. 02/03/86 Preliminary Notification PNO-III-86-09A Re: Earthquake (2 pages)
40. 02/03/86 Sheet 2, 3, 4, 5, and 6 of 19 Re: Technical Specification Requirement (5 pages) i . .
41. 02/03/86 Note to Robert Bernero from Gus Lainas Re: Con Telephone Call - Earthquake at Perry (2 pages)gressional
42. 02/04/86 Initialed Review of. Daily Instructions (2 pages)
43. 02/04/86 ' Letter to Commission'from Donald Schlemmer Re: Petition Pursuant to 10 CFR 2.206 Perry 1 and 2 (11 pages)
44. 02/04/86 $.etter to Murray Edelman fra James Keppler Re:

Maintenance on Equipment (2 pages)

45. 02/04/86 Memo to John Eppick from D. Dietrich Re: Review of Work

, Requests for Potential Earthquake Effects w/ enclosures Various Drawings (5 pages)

46. 02/14/86 EE0 Correspondence Control Sheet to Chairman Palladino from Edward Markey Re: Earthquake on Perry Nuclear l Plant w/ enclosure letter 'dtd. 2/5/86 to Palladino from l Markey(2pages) l

f

(

C

47. 02/05/86 Telephone and Conference Memo between G. Anderson and Jack Grobe Re: Testing of Rasemount T insmitters (1 page)
48. 02/05/86 Correspondence Control Ticket from EDO to.J. Keppler w/ enclosure ltr. dtd. 2/4/86 to Palladino from John Seiberling (2 pages)
49. 02/05/86 Letter to Murray Edelman from Charles Norelius Re:

Cleveland Electric Illuminating Company's Staff Meeting (1 page) -

50. 02/06/86 Response to Congressional Questions Related to the 1 Earthquake in the Vicinity of the Perry Plant (9 pages) l
51. 02/06/86 Preliminary Notification PNO-III-86-09B Re: Earthquake '

(1 page)

52. 02/06/86 Memo to Robert Bernero from Carl Paperiello Re: Transfer of Lead Responsibility for Resolution of the Earthquake /

Seismic Event at the Perry Nuclear Power Plant (1 page)

53. 02/11/86 The Cleveland Electric Illuminating Company Seismic Event Evaluation Technical Presentation Agenda February 11, 1986 (45 pages)
54. 02/12/86 Memo to Commission from Victor Stello Re: Daily Staff Notes, February 11, 1986 (2 pages)
55. 02/12/86 Letter to James Keppler from Murray Edelman Re:

Confirmatory Action Letters (5 pages)

56. 02/12/86 Letter to Harold Denton from Murray Edelman Re: Perry Nuclear Power Plant (2 pays) l 57. 02/19/86 Letter to James Keppler from A. Kaplan Pe: Perry Nuclear i

Power Plant w/ enclosures Cleveland Electric Illuminatin Company's Response to Petition and Response on WRA's ' g ~

Petition (57 pages) i l 58. 02/19/86 Memo to Robert Bernero from John Stefano Pe: Action Plan for Esaluating Perry Earthquake w/ enclosures Review Team and Affidwit (65 pages)

59. 02/19/86 Memo to B. Liaw from Phyllis Sobel Re: January 31, 1986 Earthquake Near Perry Nuclear Power Plant (2 pages)
60. 02/24/86 Handwritten Note to Dick from Jack Re: Seismic Instrument Calibration Data Sheets (1 page)
61. 02/25/86 Memo to Walter Butler from John Stefano Re: Summary i

' Report of the Earthquake Meeting at the Perry Plant Site on 2/11/86 w/ enclosure Cleveland Electric Illuminating Company Seismic Event Evaluation Technical Presentation Agenda (61 pages)

T~

62. 02/25/86 Memo to Robert Bosnak from T. Chang Re: Report of Quick Response Trip to Observe Effects of the Northern Ohio Earthquake on the Perry Nuclear Power Plant w/ enclosure Various Charts (26 pages)
63. 02/25/86 Spectral Analysis of Perry Nuclear Power Piant Velocity-Time Histories Resulting from Ohio Earthquake by Joseph Weaver (14 pages) 64 02/26/86 Letter to Robert Hermann from James Johnson Re:

Contributions to the Revised Perry SER due to the -

1/31/86 Earthquake w/6nclosure Contribution to the Revised Perry SER (11 pages)

65. 02/28/86 Note to Tom Rehm from John Stefano Re: Perry Earthquake w/ enclosure Update of Perry Earthquake Information (3 pages)
66. 03/17/86 Memo to The Cleveland Electric Illuminating Company, Attn: Mr. Murray R. Edelman from James G. Keppler attaching the January 31, 1986, inspection report of the Perry Nuclear Power Plant (98 pages)

~

%m

  • i l

. 'F01A'56-91 APPENDIX B In PDR

1. 02/03/86 Motion to Reopen the Record and so Submit a New Contention -

File Location No. PDR ADOCK 05000440G 860203 8602100442 '

(7 pages)

2. 02/03/86 Petition for Action Under 10 CFR 2.206 - File Location No.

PDR ADOCK 05000440G 860203 8602100049 (4 pages)

3. 02/06/86 Letter re: Petition Pursuant to 10 CFR 2.206 ' Perry 1 and Perry 2 File Location No. PDR ADOCK 05000440G 860204 8602060154 (12 pages)
4. 02/05/86 Letter to Harold Denton from Murray Edelman re: Seismic Event Evaluation - File Location No. PDR ADOCK 8602100334 860205 05000440 (3 pages)
5. 02/06/86 Board Notification 86 Memo re: NRC Staff Preliminary Investigation of an Earthquake Which Occurred in the Vicinity of the Perry Nuclear Power Plant Site - File Location No. PDR AD0CK 05000440s 860206 8602070148 (4 pages)
6. 02/12/86 Seismic Event Evaluation Report - File Package No. 8602130193 (259 paaes)
7. 02/12/86 Accession No. 8602200104 (860212) ACRS Subcommittee Meeting Transcript (500 pages)

' ~

8. 02/13/86 Accession No. 8602240309 (860213)'ACRS Full Committee MeetingTranscript(400pages) l