Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20217E7111999-09-30030 September 1999 Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps 1999-09-09
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARDD-90-05, Advises That Time Provided for Commission to Review Director'S Decision DD-90-05 Expired.Commission Declined Review & Decision Became Final Agency Action on 901001. W/Certificate of Svc.Served on 9010121990-10-11011 October 1990 Advises That Time Provided for Commission to Review Director'S Decision DD-90-05 Expired.Commission Declined Review & Decision Became Final Agency Action on 901001. W/Certificate of Svc.Served on 901012 DD-90-04, Informs That Time Provied by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-90-04 Expired.Commission Declined Review & Decision Became Final Action on 900803.W/Certificate of Svc.Served on 9008141990-08-14014 August 1990 Informs That Time Provied by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-90-04 Expired.Commission Declined Review & Decision Became Final Action on 900803.W/Certificate of Svc.Served on 900814 ML20056B1841990-08-0202 August 1990 Advises That Aslab Cannot Accept P Pierce-Bjorklund 900730 Submission,Seeking to Appeal 900709 Director'S Decision DD-90-4.W/Certificate of Svc.Served on 900803 ML20055C7291990-05-31031 May 1990 Forwards Response to Questions Raised in 900226 & 0325 Ltrs Re Plant First 10-yr Interval Inservice Insp Program Plan ML20248J3651989-10-13013 October 1989 Comely Ltrs to I Smith, & Chilk, .* Advises That Listed Documents Reviewed by Seabrook ASLB & Will Be Placed in Pdr.Served on 891013 ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247J0561989-09-13013 September 1989 Responds to Suggestion Re Establishment of Natl Control Ctr to Monitor Cooling Water Temp of Nuclear Reactors. Establishing Natl Control Ctr to Monitor Reactor Coolant Temps of All Reactors Would Not Provide Added Safety Margin ML20246Q0711989-09-0101 September 1989 Ack Receipt of Re Plant Augumented Insp Team Rept on Natural Circulation Test at Facility.Augmented Insp Team Rept Will Not Be Changed & Further Interview W/Recipient Not Planned ML20246A8591989-08-17017 August 1989 Final Response to FOIA Request.Partially Withheld App a Document Re Confirmatory Action Ltr 89-11 Encl & Available in PDR (Ref FOIA Exemption 5) ML20245G4311989-08-11011 August 1989 Final Response to FOIA Request for Documents.Forwards App a Documents Also Available in PDR ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245K1331989-06-29029 June 1989 Partial Response to FOIA Request.App H Records Encl & Available in Pdr.App K Records Provided to Requestor & Not Available in Pdr.Apps I,J & K Records Withheld (Ref FOIA Exemption 7) ML20245B3881989-06-15015 June 1989 Responds to Re Flow & Pressure Drop Calculations for RWCU & Feedwater & Condensate Sample Panels.Util Actions Do Not Have Adverse Impact on Nuclear Reactor Safety to Extent That Protection of Safety of Environ Affected ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20244C3221989-06-0707 June 1989 Responds to Re Conversion of Plant & Production of Pollution Free Power.Doe Should Be Contacted for Info Re Research Programs Associated W/Alternative Energy Sources ML20245B4051989-04-14014 April 1989 Responds to 881004 & 890119,23 & 0310 Ltrs Re Status of Investigation of Concerns About Corrosion Inhibitors & Design of Sampling Sys.Low Velocity of Liquid in Hotwell Sampling Considered Satisfactory ML20247B1771989-03-27027 March 1989 Final Response to FOIA Request for Records.Releasable Portions of App B Documents Encl.App a Records Available in Pdr.App B Records Partially & Completely Withheld (Ref FOIA Exemptions 6 & 7) ML20246N1521989-02-22022 February 1989 Responds to Re Amended Indemnity Agreement W/ Utils to Permit Storage of Spent Nuclear Fuel.Fr Notice Encl ML20206D9201988-11-0909 November 1988 Responds to Re NRC 880331 Response to Questions Raised Concerning Conditions at Plants & Recipient Proposal to Station Senior Operator in Control Room at All Nuclear Plants to Oversee Plant Operations ML20195G5361988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App a Documents.App a Documents Also Available in PDR ML20195G2121988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App D Document & Releasable Portions of Documents E/1 Through E/3. App D & Releasable Portions of Documents E/4 Through E/6 Available in Pdr.Portions Withheld (Ref FOIA Exemption 5) ML20206D8871988-11-0808 November 1988 Responds to 881015 Postcard Recommending Keeping Seabrook & Pilgrim Facilities Closed & Question Re Nuclear Waste Disposal.Two Levels of Waste for Commercial Nuclear Power Plants Considered ML20205L9451988-10-28028 October 1988 Forwards Rept, Seabrook Yrs, Per 881019 Telcon Request ML20205F6921988-10-27027 October 1988 Advises That NRC Brief Responding to New England Coalition on Nuclear Pollution Appeal of Board 880808 Memorandum & Order Must Be Filed No Later than 881107.ASLAB Deferring Determination Re Hearing Oral Argument.Served on 881027 DD-88-15, Advises That Time for Commission to Review of Director'S Decision DD-88-15 Expired.Commission Declined Review & Decision Became Final Agency Action on 881011.Served on 8810181988-10-17017 October 1988 Advises That Time for Commission to Review of Director'S Decision DD-88-15 Expired.Commission Declined Review & Decision Became Final Agency Action on 881011.Served on 881018 ML20205S3841988-10-13013 October 1988 Partial Response to FOIA Request for Documents.App D,E & F Records Encl & Available in Pdr.App F Records Partially Withheld (Ref FOIA Exemption 6) ML20155E5691988-10-0404 October 1988 Responds to to President Reagan Re Substandard Piping Fixtures,Unqualified Inspector Concern & Thoroughness of Licensee Insp to Determine Counterfeit Bolts.Nrc Issued NRC Bulletin 88-005 Concerning Problem ML20205A5301988-09-20020 September 1988 Final Response to FOIA Request.App a Documents Encl & Available in PDR IA-88-443, Final Response to FOIA Request.App a Documents Encl & Available in PDR1988-09-20020 September 1988 Final Response to FOIA Request.App a Documents Encl & Available in PDR ML20153D1421988-08-24024 August 1988 Advises of NRC Official Hours for Persons Wishing to Serve Pleadings,Papers or Documents on NRC Attys in Hearing Div of Ofc of General Counsel ML20154D3891988-08-22022 August 1988 Partial Response to FOIA Request for Documents.Forwards App T Documents.Apps & T Documents Available in PDR ML20245D6581988-08-0404 August 1988 Discusses to Congressman Hastert Re Concern That Maint & Operations Employees of Listed Nuclear Power Plants in Vicinity of Seneca,Il Working Excessive Hrs ML20206E0051988-07-27027 July 1988 Responds to Enclosing Prior Correspondence W/Nrc Re Conditions at Ref Plants & 10CFR50.54(x) & (Y).Issues Raised Will Be Given Wide Dissemination in Fr & Careful Consideration by NRC ML20151G5891988-07-21021 July 1988 Advises That Time for Commission to Review Director'S Decision 88-10 Expired.Commission Declined Review.Decision Became Final Agency Action on 880718 ML20151N8821988-07-0808 July 1988 Final Response to FOIA Request for Documents.Forwards App I Documents.Apps H & I Documents Available in PDR ML20207D1121988-07-0505 July 1988 Partial Response to FOIA Request for Documents.Forwards App M Documents.App L Documents Maintained in Pdr.Apps N & O Documents Partially & Totally Withheld,Respectively (Ref FOIA Exemption 5) ML20151C9331988-06-30030 June 1988 Partial Response to FOIA Request.Forwards App G Documents. App F & G Documents Available in PDR ML20150C7241988-06-22022 June 1988 Forwards Director'S Decision 88-10 Denying Petition for Immediate Action to Relieve Undue Risk Posed by Inadequate Seismic Design of Facility Filed on 880122,per 10CFR2.206. Notice Filed W/Ofc of Fr for Publication ML20195F8041988-06-15015 June 1988 First Partial Response to FOIA Request for Documents. Forwards Apps B & C Documents.Documents Available in Pdr.App a Documents Also Available in Pdr.Apps D Through G Documents Withheld (Ref FOIA Exemption 5).Releasable Portion Encl ML20155K0211988-06-13013 June 1988 Partial Response to FOIA Request for Documents.Forwards App D Documents.App C Documents Available in Pdr.App E Documents Completely Withheld (Ref FOIA Exemption 5) ML20155E5981988-06-0707 June 1988 Forwards 880517 Memo from J Gutierrez to W Kane Re Allegations of Wrongdoing,Per 880601 Request ML20197F5561988-06-0606 June 1988 Ack Receipt of 880408 Reply to Response from Util Re Recipients 870922 Petition Seeking Correction of Util Emergency Preparedness Info Handbook of Oct 1986.FEMA Will Respond to Remaining Concerns Specified in Reply ML20155E5851988-06-0303 June 1988 Responds to to DOJ & 880601 Telcon Re Concerns Related to Conduct of Insps by Unqualified Authorized Nuclear Inspector & to Deliberate Attempt by ANI Insurance Co to Conceal Discovery.Addl Followup Activities Planned ML20154F6901988-05-12012 May 1988 Provides Followup to Expressing Concern Over Potential Difficulty of Plant Personnel Hearing Public Address Sys Announcements.Investigation of 871002-03 Fire Did Not Reveal Any Further Difficulty in Hearing Subj Sys ML20153D0621988-04-28028 April 1988 Responds to Appeal Re Denial of FOIA Request for Document. Encl Aslp 880323 Memorandum & Order Agrees to Withhold Identity of Individuals & Organizations Needed to Implement Plan.Document Withheld ML20151M6061988-04-19019 April 1988 Responds to FOIA Request for Info Re Scores of Reactor Operators & Senior Reactor Operators.Forwards Requalification Exam Summary Source Sheets Listed in Encl App W/Personal Privacy Info Deleted ML20151Y4681988-04-15015 April 1988 Partial Response to FOIA Request for Documents Re Event Involving Problems W/Msiv.App a & B Documents Available in Pdr.App B Documents Also Encl ML20151C6641988-04-0404 April 1988 Partial Response to FOIA Request for Documents Re Info Assessment Team Notification & Alleged Valve Tampering. App a Documents Available in Pdr.Forwards App B Documents. App B Documents Also Available in PDR ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup 1990-08-02
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210K6331999-08-0404 August 1999 Submits Response to Requests for Addl Info to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, for Perry Nuclear Plant,Unit 1 ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues ML20210J8421999-08-0303 August 1999 Forwards Order,Conforming Amend & SER in Response to Application Transmitted by Util Under Cover Ltr , & Suppl by Ltrs & 0407 Requesting Approval of Transfer of License NPF-86 ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210K4911999-07-28028 July 1999 Responds to to Chairman Jackson Requesting Info on Concerns Raised by Constitutent a Menninger,Re Seabrook Nuclear Power Station Y2K Readiness ML20210G8411999-07-28028 July 1999 Informs That Based on Determination That Rev 14 Changes to Various Portions of Perry Nuclear Power Plant Emergency Plan Does Not Decrease Effectiveness of Licensee Emergency Plan & Meets Standard of 10CFR50.47(b),no NRC Approval Required IR 05000443/19990041999-07-26026 July 1999 Forwards Insp Rept 50-443/99-04 on 990510-0620.No Violations Noted.Emergency Preparedness Program Reviewed & Found to Be Acceptable ML20210E0661999-07-22022 July 1999 Forwards Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted.Overall Conduct of Activities at Perry Facility, Conservative & Professional with Continuing Focus on Safety ML20209G4711999-07-14014 July 1999 Informs That Unredacted Version of Supplemental Commercial & Financial Data for Baycorp Holdings,Ltd,Submitted in 990407 Application & Affidavit,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20209E5951999-07-0909 July 1999 Ltr Contract:Task Order 46, Perry Engineering & Technical Support (E&Ts) Insp, Under Contract NRC-03-98-021 ML20209D5931999-07-0101 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Investigation Rept 3-98-005 Issued on 990510.Corrective Actions Will Be Examined During Future Inspections IR 05000070/19993011999-07-0101 July 1999 Forwards Insp Repts 50-070/99-301,50-073/99-201 & 50-183/99-201 on 990607-10.No Safety Concern or Noncompliance to NRC Requirements Was Identified ML20196J7011999-06-30030 June 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20196H9641999-06-29029 June 1999 Confirms 990615 Telcon Request with J Lieberman for Addl Time to Respond to Enforcement Action 99-012.FirstEnergy Has 60 Days to Respond to EA ML20209A6701999-06-25025 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990528.As Part of Organization,Div of Licensing Project Mgt Was Created.Organization Chart Encl ML20196G8421999-06-21021 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing Re 990315 Application Filed by Nepco IR 05000443/19990021999-06-21021 June 1999 Forwards Insp Rept 50-443/99-02 on 990321-0509.Violation Re Failure to Ensure That Critical Relay Calibr Characteristics Were Met Prior to Installation Was Identified ML20196J4451999-06-18018 June 1999 Ack Receipt of ,Following Up on .In Ltr of April 5,EJ Markey Highlighted Issue of EDG Reliability in Light of Recent Discovery of Defective AR Relays at Seabrook NPP in New Hampshire ML20212J2651999-06-17017 June 1999 Informs That Unredacted Version of Updated Financial Data for Baycorp Holdings,Ltd Will Be Withheld from Public Disclosure & Marked as Confidential Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20212H6661999-06-15015 June 1999 Forwards RAI Re 990315 Application Request for Approval of Proposed Indirect Transfer of Seabrook Station,Unit 1 License & Proposed Indirect Transfer of Millstone,Unit 3 License to Extent Held by Nepco 1999-09-09
[Table view] |
Text
- _ ~ ,_ , . - - - --
z ,
8 g UNITED STATES -
8 o NUCLEAR REGULATORY COMMISSION
- E WASHINGTON, D. C. 205S5 l
s...../ .
AIAR 21 1986 ,
Ms. Susan L. Hiatt ,
OCRE Representative IN RESPONSE REFER l 8275 Munson Road TO F01A-86-91 Mentor, OH 44060
Dear Ms. Hiatt:
~.
This is in response to your letter dated February 12, 1986, in which you 1 requested, pursuant to the Freedom of Information Act (F0IA), copies of l nine categories of records relating to damages occurring to nuclear power plants following an earthquake exceeding the operating basis earthquake and the January 31, 1986, earthquake occurring near the Perry site.
The records identified on enclosed Appendix A are enclosed. The staff did not correlate these records with the subject categories since several categories may be appropriate. You will be billed separately by our Division of Accounting and Finance in the amount of $47.05 for the enclosed 941 pages.
1 The records identified on enclosed Appendix B have previously been made available for inspection and copying at the NRC's Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555.
em During a recent telephone conversation with Nina Toms, you narrowed the scope of your request to exclude the draft inspection report. A copy of the final inspection report is listed at item 66 of Appendix A and is enclosed.
Sincerely,
~ ~
M Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
Enclosures:
As stated 8605300469 860321 PDR FOIA HIATT86-91 PDR
f; ~ ..: = -.- u. -. 2 ....w. .. -- .::. :u.r.;.u:m .= ::= .n _ n - ,
Appendix A F0IA 86-91
- 1. No date Data Package Cover Sheet Instruction No. SVI-D51-T0279 (1 page)
Attachment 1, Triaxial Time-History Accelerograph Channel Calibration Prerequisite Sign-Off Sheet (1 page)
Attachment 2, Triaxial Time-History Accelerograph Channel Calibration (13 pages) ..
Attachment 3, System Restoration Checklist (3 pages)
~
Attachment 4, Reference Drawing (1 page)
Attachment 5 (1 page)
Attachment 6 (1 page)
Attachment 7 (1 page)
- 2. No date Data Package Cover Sheet Instruction No. SVI-D51-T0295 (1 page)
Attachment 1, Triaxial Seismic Switch Channel Calibration for D51-N150 Prerequisite Sign-Off Sheet (1 page)
Attachment 2, Triaxial Seismic Switch Channel Calibration for D51-N150 Data Sheet (5 pages)
Attachment 3, System Restoration Checklist (2 pages)
Attachment 4, Centering of Mass for Sensors; Starter Switchboard Parts Layout; Loop Diagram; Sensor Pot and Time Delay Pot Diagram (4 pages)
- 3. No date Data Package Cover Sheet Instruction No. SVI-D51-T5370 (1 page)
Attachment 1, Triaxial Time-History Accelerographs Seismic Trigger Channel Calibration for D51-N100 Prerequisite Sign-off Sheet (1 page)
Attachment 2, Triaxial Time-History Accelerographs Seismic Trigger Channel Calibration for 051-N100 Data Sheet (9 pages)' - -
Attachment 3, System Restoration Checklist (2 pages)
Attachment 4, Centering of Mass for Sensors; Starter Switchboard Parts Layout; Loop Diagram; Sensor Pot and Time Delay Pot. Diagram (4 pages) '
- 4. No date Data Package Cover Sheet Instrection No. SVI-051-T0302 (1 page)
Surveillance Instruction (2 pages)
Seismic Instruments Channel Check (9 pages)
Attachment 1, Sign-Off Verification Sheet (4 pages) J Attachment 2, System Restoration Checklist -(1 page)
I i 1 - o
- c- m.~ ~ <
e ' ~ -' ' ~ *
~ m:aGa.u ::y. _. .
}
J
- 5. No date Data Package Cover Sheet Instruction No. SVI-D51-T0289-A (1 page)
Attachment 1, Triaxial Peak Accelerograph Channel Calibration for 051-R120 (Reactor Recirculation '
j Pump) Prerequisite, Sign-Off Sheet (-1 page)- l Attachment 2, Triaxial Peak Accelerograph Channel Calibration for D51-R120 (Reactor Recirculation Pump) Data Sheet (11 pages)
Attachment 3 System Restoration Checklist (1 page)
- 6. No date Data Package Cover Sheet Instruction No. SVI-D51-T0289-A ~
(1 page) '
Surveillance Instruction (2 pages) '
Triaxial Peck Accelerograph Channel Calibration for D51-R120 (Reactor Recirculation Pump) (27 pages)
Attachment 1, Trhxial Peak Accelerograph Channel Calibration for b 1-R120 (Reactor Recirculation Pump) Prerequisite Sign-Off sheet (1 page)
Attachment 2, Triaxial Peak Accelerograph Channel Calibration for D51-R120 (Reactor Recirculation Pump) Data Sheet (11 pages)
Attachment 3, System Restoration Checklist (1 page)
- 7. No date Data Package Cover Sheet Instruction No. SVI-D51-T0289-B (1 page)
Attachment 1, Triaxial Peak Accelerograph Channel Calibration for D51-R130 (HPCS Piping in Reactor Building) Prerequisite Sign-Off Sheet (1 page)
Attachment 2, Triaxial Peak Accelerograph Channel 7
Calibration for D51-R130 (HPCS Piping in Reactor Building) Data Sheet (10 pages)
Attachment 3, System Restoration Checklist (1 page)
- 8. No date Data Package Cover Sheet Instruction No. SVI-D51-T0289-C (1 page)
Attachment 1, Triaxial Peak Accelerograph Channel' Calibration for D51Sheet Prerequisite Sign-Off 'R140(1(HPCS page Pump) Base Mat)
Attachment 2, Triaxial Peak Accelerograph Channel Calibration for D51-R140 (HPCS Pump Base Mat)
! Data Sheet (10 pages)
Attachment 3, System R,estoration Checklist (1 page)
- 9. No date Data Package Cover Sheet Instruction No. SVI-D51-T0289-C (1page)
Attachment 1, Triaxial Peak Accelerograph Channel Calibration for D51-R140 (HPCS Pump Base Mat)
Prerequisite Sign-Off Sheet (1 page)
Attachment 2, Triaxial Peak Accelerograph Channel Calibration for D51-R140 (HPCS Pump Base Mat)
Data Sheet (10 pages)
Attachment 3 System Restoration Checklist (1 page) 2
y =::., a . - .. . ;:. - ~.:: :.: 2 ": = ' L..,'
a:w @ ^ " " *' '
i
- 10. No date Data Package Cover Sheet Instruction No. SVI-D51-T0304-A (1page)
Attachment 1, Triaxial Response Spectrum Recorder Channel Calibration for D51-R160 (Reactor Building Fcundation) Prcrcquisite Sign-Off Sheet (I page)
Attachment 2, Triaxial Response Spectrum Recorder Channel Calibration for D51-R160 (Reactor Building Foundation) Data Sheets (26 pages)
Attachment 3. System Restoration Checklist (1 page)
Attachment 4, Triaxial Response Spectrum Recorder .
Channel Calibration for D51-R160 (Reactor Building Foundation) Calculation Data Sheet (69 pages) .
- 11. No date Data Package Cover Sheet Instruction No. SVI-D51-T0304-B (1 page)
Attacht.ent 1 Triaxial Response Spectrum Recorder Channel Calibration for 051-R170 (Reactor Recirculation Piping Sup Sign-Off Sheet (1 page) port) Prerequisite Attachment 2, Triaxial Response Spectrum Recorder Channel Calibration for 051-R170 (Reactor Building Foundation) Data Sheets (16 pages)
Attachment 3, System Restoration Checklist (1 page)
Attachnent 4, Triaxial Response Spectrum Recorder Channel Calibration for 051-R170 (Reactor Recirculation Piping Support) Calculation Data Sheet (19 pages)
>' 12. No date Data Package Cover Sheet Instructio'n No. SVI-051-T0304-B (1 page)
Attachment 1, Triaxial Response Spectrum Recorder Channel Calibration for 051-R170 (Reactor Recirculation Piping Support) Prerequisite Sign-Off Sheet (1 page)
Attachmer.t 2, Triaxial Response Spectrum Recorder Channel Calibration,for 051-R170 (Reactor Building Foundation) Data Sheets (16 pages) - -
Attachment 3, System Restoration C'hecklist (1 page)
Attachment 4, Triaxial Response Spectrum Recorder Channel Calibration for D51-R170 (Reactor Recirculation Piping Support) Calculation Data Sheet (19 pages)
- 13. No date Data Package Cover Sheet Instruction No. SVI-D51-T0304-C (1 page)
Attachment 1, Triaxial Response Spectrum Recorder Channe1' Calibration for D51-R180 (HPCS Pum Mat) Prerequisite Sign-Off Sheet (1 page) p Base Attachment 2, Triaxial Response Spectrum Recorder Channel Calibration for 051-180 (HPCS Pump Base Mat) Data Sheets (16 pages)
Attachment 3 System Restoration Checklist (1 page) 3
-+ ; ;= .(=
Attachment 4, Triaxial Response Spectrum Recorder Channel Calibration for D51-R180 (HPCS Pump Base Mat) Calculation Data Sheet (19 pages)
- 14. No date Data Package Cover Sheet Instruction'No. SVI-D51-T0'304-D (1 page) ,
Attachment 1, Triaxial Response Spectrum Recorder {
Channel Calibration for D51-R190 (RCIC Pum Mat) Prerequisite Sign-Off Sheet (1 page) p Base l Attachment 2, Triaxial Response Spectrum Recorder . l Channel Calibration for D51-R190 (RCIC Pump Base Mat) Data Sheets (16 pages) .
Attachment 3, System Restoration Checklist (1 page)
Attachment 4, Triaxial Response Spectrum Recorder Channel Calibration for 051-R190 (RCIC Pump Base Mat) Calculation Data Sheet (19 pages)
- 15. No date Summary and Conclusions
- 16. No date Draft letter Stefano to Butler SUBJ: Sunnary Report of the Earthquake Meeting at the Perry Plant Site on February 11, 1986 (2 pages)
Enclosure 1 (1 page)
- 17. No date Draft set of questions and answers (9 pages)
- 18. No date Licensee handout to employees (2 pages)
~
4 19. No date C43-R0938 (2 pages)
- 20. No date Aftershocks and map (2 pages)
- 21. No date Notes (1 page)
- 22. No date The Cleveland Electric Illuminating Company, Perry Nuclear Power Plant 0perations Manual, Temporary Instructions, Revision 0 (12 pages) - -
- 23. No date The Cleveland Electric Illuminating Company, Perry Nuclear Power Plant Operations Manual, Temporary Instructions, Revision 1 (12 pages)
- 24. No date The Cleveland Electric Illuminating Company, Perry Nuclear Power Plant Operations Manual, Temporary
, Instructions, Revision 2 (13 pages)
- 25. 08/27/85 The Cleveland Electric Illuminating Company Perry Nuclear Power Plant Operations Manual (7 pages)
- 26. 12/17/85 SVI-G43-T1305-A (5 pages) i 27. 01/31/86 CAL Keppler to Cleveland Electric Illuminating (2 pages) l 4
i
,,t
.e
- 28. 01/31/86 , Letter to Palladino' from Seiberling (2 pages)
- 29. 01/31/86 Preliminary Notification (PN) (2 pages)
- 30. 01/31/86 Nuclear Network Operating Plant Experience (1 page)
- 31. 01/31/86 PAP-0201 (2 pages) . .
- 32. 02/01/86 PAP-0101 (1 page) '
l l
- 33. 02/02/86 Memo Lyster to Managers (2 pages) l
- 34. 02/02/86 Memo Anderson to All Instrument and Controls Section Personnel (2 pases)
- 35. 02/02/86 PAP-0201 (1 page)
- 36. 02/03/86 Memo to Managers from M. 1.yster Re: Work Control (2 pages)
- 37. 02/03/86 Memo to W. Kanda from Mike White Re: Annunciators on Seismic Panel ODSIR215 (I page)
- 38. 02/03/86 Initialed Review of Daily Instructions (Handwritten) from Robert Statman (1 page)
- 39. 02/03/86 Preliminary Notification PNO-III-86-09A Re: Earthquake (2 pages)
- 40. 02/03/86 Sheet 2, 3, 4, 5, and 6 of 19 Re: Technical Specification Requirement (5 pages) i . .
- 41. 02/03/86 Note to Robert Bernero from Gus Lainas Re: Con Telephone Call - Earthquake at Perry (2 pages)gressional
- 42. 02/04/86 Initialed Review of. Daily Instructions (2 pages)
- 43. 02/04/86 ' Letter to Commission'from Donald Schlemmer Re: Petition Pursuant to 10 CFR 2.206 Perry 1 and 2 (11 pages)
- 44. 02/04/86 $.etter to Murray Edelman fra James Keppler Re:
Maintenance on Equipment (2 pages)
- 45. 02/04/86 Memo to John Eppick from D. Dietrich Re: Review of Work
, Requests for Potential Earthquake Effects w/ enclosures Various Drawings (5 pages)
- 46. 02/14/86 EE0 Correspondence Control Sheet to Chairman Palladino from Edward Markey Re: Earthquake on Perry Nuclear l Plant w/ enclosure letter 'dtd. 2/5/86 to Palladino from l Markey(2pages) l
f
(
C
- 47. 02/05/86 Telephone and Conference Memo between G. Anderson and Jack Grobe Re: Testing of Rasemount T insmitters (1 page)
- 48. 02/05/86 Correspondence Control Ticket from EDO to.J. Keppler w/ enclosure ltr. dtd. 2/4/86 to Palladino from John Seiberling (2 pages)
- 49. 02/05/86 Letter to Murray Edelman from Charles Norelius Re:
Cleveland Electric Illuminating Company's Staff Meeting (1 page) -
- 50. 02/06/86 Response to Congressional Questions Related to the 1 Earthquake in the Vicinity of the Perry Plant (9 pages) l
- 51. 02/06/86 Preliminary Notification PNO-III-86-09B Re: Earthquake '
(1 page)
- 52. 02/06/86 Memo to Robert Bernero from Carl Paperiello Re: Transfer of Lead Responsibility for Resolution of the Earthquake /
Seismic Event at the Perry Nuclear Power Plant (1 page)
- 53. 02/11/86 The Cleveland Electric Illuminating Company Seismic Event Evaluation Technical Presentation Agenda February 11, 1986 (45 pages)
- 54. 02/12/86 Memo to Commission from Victor Stello Re: Daily Staff Notes, February 11, 1986 (2 pages)
- 55. 02/12/86 Letter to James Keppler from Murray Edelman Re:
Confirmatory Action Letters (5 pages)
- 56. 02/12/86 Letter to Harold Denton from Murray Edelman Re: Perry Nuclear Power Plant (2 pays) l 57. 02/19/86 Letter to James Keppler from A. Kaplan Pe: Perry Nuclear i
Power Plant w/ enclosures Cleveland Electric Illuminatin Company's Response to Petition and Response on WRA's ' g ~
Petition (57 pages) i l 58. 02/19/86 Memo to Robert Bernero from John Stefano Pe: Action Plan for Esaluating Perry Earthquake w/ enclosures Review Team and Affidwit (65 pages)
- 59. 02/19/86 Memo to B. Liaw from Phyllis Sobel Re: January 31, 1986 Earthquake Near Perry Nuclear Power Plant (2 pages)
- 60. 02/24/86 Handwritten Note to Dick from Jack Re: Seismic Instrument Calibration Data Sheets (1 page)
- 61. 02/25/86 Memo to Walter Butler from John Stefano Re: Summary i
' Report of the Earthquake Meeting at the Perry Plant Site on 2/11/86 w/ enclosure Cleveland Electric Illuminating Company Seismic Event Evaluation Technical Presentation Agenda (61 pages)
T~
- 62. 02/25/86 Memo to Robert Bosnak from T. Chang Re: Report of Quick Response Trip to Observe Effects of the Northern Ohio Earthquake on the Perry Nuclear Power Plant w/ enclosure Various Charts (26 pages)
- 63. 02/25/86 Spectral Analysis of Perry Nuclear Power Piant Velocity-Time Histories Resulting from Ohio Earthquake by Joseph Weaver (14 pages) 64 02/26/86 Letter to Robert Hermann from James Johnson Re:
Contributions to the Revised Perry SER due to the -
1/31/86 Earthquake w/6nclosure Contribution to the Revised Perry SER (11 pages)
- 65. 02/28/86 Note to Tom Rehm from John Stefano Re: Perry Earthquake w/ enclosure Update of Perry Earthquake Information (3 pages)
- 66. 03/17/86 Memo to The Cleveland Electric Illuminating Company, Attn: Mr. Murray R. Edelman from James G. Keppler attaching the January 31, 1986, inspection report of the Perry Nuclear Power Plant (98 pages)
~
%m
. 'F01A'56-91 APPENDIX B In PDR
- 1. 02/03/86 Motion to Reopen the Record and so Submit a New Contention -
File Location No. PDR ADOCK 05000440G 860203 8602100442 '
(7 pages)
- 2. 02/03/86 Petition for Action Under 10 CFR 2.206 - File Location No.
PDR ADOCK 05000440G 860203 8602100049 (4 pages)
- 3. 02/06/86 Letter re: Petition Pursuant to 10 CFR 2.206 ' Perry 1 and Perry 2 File Location No. PDR ADOCK 05000440G 860204 8602060154 (12 pages)
- 4. 02/05/86 Letter to Harold Denton from Murray Edelman re: Seismic Event Evaluation - File Location No. PDR ADOCK 8602100334 860205 05000440 (3 pages)
- 5. 02/06/86 Board Notification 86 Memo re: NRC Staff Preliminary Investigation of an Earthquake Which Occurred in the Vicinity of the Perry Nuclear Power Plant Site - File Location No. PDR AD0CK 05000440s 860206 8602070148 (4 pages)
- 6. 02/12/86 Seismic Event Evaluation Report - File Package No. 8602130193 (259 paaes)
- 7. 02/12/86 Accession No. 8602200104 (860212) ACRS Subcommittee Meeting Transcript (500 pages)
' ~
- 8. 02/13/86 Accession No. 8602240309 (860213)'ACRS Full Committee MeetingTranscript(400pages) l
(. i