Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195B351 + (ML20195B351)
- 05000440/LER-1986-006, :on 860422 & 25,neutron Monitoring Sys Instrumentation Upscale Trips Resulted in One Manual & One Automatic Reactor Protection Sys Actuation.Spikes Caused by Electrical Noise.Bus Changes Implemented + (ML20195B353)
- VPN-069-98, Comment on Proposed Rules 10CFR50 & 140 Re Financial Requirements for Permanently Shutdown Nuclear Power Reactors + (ML20195B355)
- ML20195B357 + (ML20195B357)
- ML20195B358 + (ML20195B358)
- ML20195B359 + (ML20195B359)
- ML20195B360 + (ML20195B360)
- ML20195B363 + (ML20195B363)
- IR 05000424/1998012 + (ML20195B364)
- ML20195B365 + (ML20195B365)
- IR 05000266/1988022 + (ML20195B366)
- 05000316/LER-1986-016, :on 860429,in Mode 6 W/Core Unloaded,Esf & Reactor Trip Signals Received.Caused by Shorted Control Power Wires to power-range Nuclear Instrument Drawer.Insps of Electrical Connectors Conducted + (ML20195B368)
- ML20195B370 + (ML20195B370)
- ML20195B371 + (ML20195B371)
- ML20195B372 + (ML20195B372)
- ML20195B373 + (ML20195B373)
- ML20195B375 + (ML20195B375)
- ML20195B376 + (ML20195B376)
- ML20195B378 + (ML20195B378)
- 05000315/LER-1986-008-01, :on 860424,reactor Trip Function of Manual Safety Injection Circuitry Found Not Specifically Tested During Review to Ensure Compliance W/Tech Spec Surveillance & Bases Requirements + (ML20195B379)
- ML20195B380 + (ML20195B380)
- ML20195B382 + (ML20195B382)
- ML20195B383 + (ML20195B383)
- 05000321/LER-1999-002-01, :on 990429,HPCI Sys Inoperability Occurred. Caused by Vacuum in HPCI Sys Vacuum Tank.Personnel Lowered Tank Vacuum & Successfully Completed HPCI Sys Testing.With + (ML20195B384)
- ML20195B385 + (ML20195B385)
- ML20195B386 + (ML20195B386)
- 05000529/LER-1986-008-01, :on 860423,main Steam Isolation Sys Actuation Occurred in Trains a & B During Plant Protection Sys Monthly Functional Test.Caused by Personnel Failure to Follow Procedure.Technicians Counseled & Disciplined + (ML20195B387)
- ML20195B389 + (ML20195B389)
- ML20195B390 + (ML20195B390)
- ML20195B391 + (ML20195B391)
- ML20195B392 + (ML20195B392)
- ML20195B393 + (ML20195B393)
- ML20195B394 + (ML20195B394)
- IR 015000042/1986001 + (ML20195B396)
- ML20195B397 + (ML20195B397)
- ML20195B398 + (ML20195B398)
- 0CAN119804, Responds to NRC 980902 & 1009 Ltrs Re Violations Noted Insp Repts 50-313/98-15 & 50-368/98-15.Corrective Actions: Weakness Re Incomplete OSC Team Briefing Forms Was Reviewed with Involved RP Supervisors & Emergency Response Teams + (ML20195B399)
- ML20195B400 + (ML20195B400)
- ML20195B401 + (ML20195B401)
- ML20195B403 + (ML20195B403)
- ML20195B404 + (ML20195B404)
- ML20195B405 + (ML20195B405)
- ML20195B407 + (ML20195B407)
- ML20195B408 + (ML20195B408)
- ML20195B410 + (ML20195B410)
- ML20195B411 + (ML20195B411)
- ML20195B414 + (ML20195B414)
- ML20195B415 + (ML20195B415)
- ML20195B418 + (ML20195B418)
- ML20195B419 + (ML20195B419)
- ML20195B420 + (ML20195B420)