Text
,
)
\\
$4.,
'Af Telephone (412) 393-6000 Nuclear 0roup NppYgp#
Y ort. PA 15077 0004 U. S. Nuclear Regulatory Commission Attn:
Dr. Thomas E. Murley, Regional Administrator Region 1 631 Park Avenue King of Prussia, PA 19406
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 FQ*P Versus Core Height Gentlemen:
T Attached is a
copy of a
- curve, Maximum (FO Prel) vs.
Axial Core Height During Normal Core Operation, provided in response to a
request by NRC staff. This curve is provided in support of the Cycle 6
Radial Peaking Factor Limit Report submitted by our letter dated May 2, 1986.
A copy of this response has been forwarded to the
- Chief, Reactor Systems Branch at the request of our NRC Project Manager.
Technical Specification 6.9.1.14 will be revised in a
forthcoming change to reflect this revised copy request.
Very tr ly yours,
. J. Carey Vice President, Nuclear col U
h 71: D4 h 8605290289 860516 h"
^00" 0500 @ 4 Di$ld5' TEQ d,9@l)g Certified By
)f
\\
p\\
i i
i 2.4
_-Am e.".
""=i%
%p" m
N mMI l uj ;,u x
2.0 N
lit R
~
m*
t.s CL M
e
\\
>0 u.
BASIS Fxy g
1.2 x
,\\
g i.es e m t.s to e.o et.
i.e7 e m s.o to so.2 et.
5 it
=
s o.s o.4 o.O j
o 2
4 e
a to 12 i
CORE HEIGHT (FEET FROM BOTTOM) i MAXIMUM (F[*P,.i)VS.AXIALCORE HEIGHT DURING NORMAL CORE OPERATION I
r
- ___ -.. - _....