Forwards Corrected Page 1,with Date Added,As Replacement to Addressing Response to Post Exam Analysis
ML20195B397
Person / Time
Site: Cooper 
Issue date: 11/03/1998
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Horn G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 9811160114
Download: ML20195B397 (4)


Text

.

/#*%

UNITED STATES p'

7g g

)<

p, NUCLEAR REGULATORY COMMISSION O

j REGION IV 611 RYAN PLAZA DRIVE, SUITE 400

%, * *\\

,o#

ARLINGTON. TEXAS 76011-8064

    • +

November 3,1998 G. R. Horn, Senior Vice President of Energy Supply Nebraska Public Power District 141415th Street Columbus, Nebraska 68601

SUBJECT:

RESPONSE TO YOUR POST EXAMINATION ANALYSIS

Dear Mr. Horn:

On October 27,1998, a letter addressing the response to your post examination analysis was mailed without being dated. Please replace the first page of the letter with the enclosed dated page. We regret any inconvenience this may have caused.

Sincerely, J ohn L. Pellet, Chief Operations Branch Division of Reactor Safety Docket No.:

50-298 License No.: DPR-46

Enclosure:

As stated g

cc:

John R. McPhail, General Counsel Nebraska Public Power District P.O. Box' 499 Columbus, Nebraska 68602-0499 i

J. H. Swailes, Vice President of Nuclear Energy Nebraska Public Power District

' P.O. Box 98 Brownville, Nebraska 68321 9811160114 981103

'~'

PDR ADOCK 05000298 V

pg l

4 l

Nebraska Public Power District B. L. Houston, Nuclear Licensing l

and _ Safety Manager l

Nebraska Public Power District l

P.O. Box 98 l

Brownville, Nebraska 68321 Dr. William D. Leech MidAmerican Energy 907 Walnut Street

- P.O. Box 657 L

- Des Moines, Iowa 50303-0657 Mr. Ron Stoddard Lincoln Electric System 1040 O Street P.O. Box 80869 Lincoln, Nebraska 68501-0869 Randolph Wood, Director Nebraska Department of Environmental Quality.

. P.O. Box 98922.

i Lincoln, Nebraska 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, Nebraska 68305 Cheryl Rogers, LLRW Program Manager Environmental Protection Section

. Nebraska Department of Health 301 Centennial Mall, South P.O. BS,95007 Lincoln, Nebraska 68509-5007

' R. A. Kucera, Department Director of Intergovemmental Cooperation Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 Jefferson City, Missouri 65101

f l

Nebraska Public Power District 3-Kansas Radiation Controi Program Director 1

I 1

1 i

l l

(

l l

L.

}

- -. -.. - ~ - -.. -.

~... -. -

1 Nebraska Public Power District bec to DCD (IE42)bec distrib. by RIV:

Regional Administrator -

Resident inspector.

DRP Director DRS-PSB -

Branch Chief (DRP/C)

MIS System Branch Chief (DRP/TSS)

)

RIV File' 1

Project Engineer (DRP/C) i DOCUMENT NAME: G:\\OB\\ exams \\cns\\facitr.rev To recolve copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures 'N" = No copy RIV:C:OB M

JLPellet/Imb & l 11/3/98 OFFICIAL RECORD COPY

. n. t(,! k.

e :. ^

1 R.

k3 KE0 8

UNITED STATES E

NUCLEAR REGULATORY COMMISSION a

j REGION IV 611 RYAN PLAZA DRIVE, SUITE 400

  • * * * *,o'g ARLINGTON. TEXAS 76011-8064 October 27,1998 G. R. Horn, Senior Vice President of EnergySupply Nebraska Public Power District 141415th Street -

Columbus, Net'raska 68601

SUBJECT:

RESPONSE TO YOUR POST EXAMINATION ANALYSIS

Dear Mr. Hom:

1 This letter is in response to Mr. Swailes' letter (NLS980171) dated October 13,1998, regarding senior operator and reactor operator initial licensing examinations, which were administered at Cooper Nuclear Station during the neriod of September 25 through October 2,1998. It is our understanding that Nebraska Publis ower District is recommending that the written o

examination administered on Septemoer 25,1998, be declared invalid. We also understand that if we agree with this conclusion, Nebraska Public Power District recommends voiding the written examination.

We are in the process of developing specific responses for each of the comments provided by Nebraska Public Power District on the initial examination which will be provided separately. On the basis of our work to date, we have confirmed some of the deficiencies identified in your post examination comments, while other comments do not appear to provide a sufficient basis to invalidate the applicable examination questions. However, we have not completed our review of each specific comment,'nor have we reached any conclusion about the overall validity of the written examination, in order for us to complete our review of this examination, we will need to obtain additional information from your staff. Accordingly, we request that your staff meet with us in the Region IV office. During this meeting, we request that you address the following topics:

The specific basis for your recommendation that the written examination may be invalid.

Please be prepared to discuss the cumulative impact of your individual comments on the overall examination sample outline, as described in " Operator Licensing Examination

. Standards for Power Reactors," NUREG-1021, ES-501, Section C.2.c.

Our position (which will be provided separately) on your specific comments, for your use in future examination development. Our preliminary analysis is that, in a number of instances, your comments do not reflect the actual knowledge required to correctly respond to the question. For example, your position on a number of questions was that a question should be invalidated because the correct answer is written in a procedure or technical specification, which is not required to be memorized. However, this position

- did not reflect whether or not the general application of specific system knowledge would have allowed an applicant to correctly answer the question.

97u63 'h/p>

__ y