Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154M216 + (ML20154M216)
- ML20154M217 + (ML20154M217)
- ML20154M218 + (ML20154M218)
- ML20154M220 + (ML20154M220)
- ML20154M221 + (ML20154M221)
- IR 05000352/1988007 + (ML20154M226)
- ML20154M227 + (ML20154M227)
- ML20154M228 + (ML20154M228)
- ML20154M229 + (ML20154M229)
- ML20154M230 + (ML20154M230)
- ML20154M232 + (ML20154M232)
- ML20154M234 + (ML20154M234)
- IR 05000277/1988005 + (ML20154M236)
- PY-CEI-NRR-0860, Advises That Temporary 10CFR50.54(p) Change to Security Plan Will Now Expire on 880715 to Due Extension of Const Schedule + (ML20154M240)
- ML20154M242 + (ML20154M242)
- ML20154M243 + (ML20154M243)
- ML20154M244 + (ML20154M244)
- ML20154M245 + (ML20154M245)
- ML20154M247 + (ML20154M247)
- ML20154M250 + (ML20154M250)
- ML20154M252 + (ML20154M252)
- 05000328/LER-1988-020, :on 880422,ERCW Containment Isolation Valves Did Not Pass Leak Rate Test.Caused by Improper Application of Valve Usage.Work Requests Initiated to Repair Valves & Components Cleaned + (ML20154M253)
- ML20154M254 + (ML20154M254)
- ML20154M255 + (ML20154M255)
- ML20154M256 + (ML20154M256)
- IR 05000155/1998007 + (ML20154M257)
- ML20154M259 + (ML20154M259)
- IR 05000334/1988010 + (ML20154M260)
- IR 05000317/1998008 + (ML20154M264)
- PNO-I-88-056, on 880526,util & State of Ny Reached Agreement in Principle for Settlement of Plant Controversy.Terms Will Call for Transferring Plant to Long Island Power Authority or Other State Agency & Providing Energy for Area People + (ML20154M266)
- SNRC-1462, Forwards Responses to Items 1-5 & Results of QA Surveys, Audits & Insps Performed to Assure Quality of Spent Fuel Racks Fabricated by Us Tool & Die & Predecessors.Plant Racks Meet Original Design & Regulatory Requirements + (ML20154M268)
- IR 05000368/1998301 + (ML20154M270)
- ML20154M271 + (ML20154M271)
- ML20154M272 + (ML20154M272)
- 05000364/LER-1988-005-01, :on 880501,failure to Perform Hourly Fire Watch Patrol Required by Tech Spec 3.7.12 Discovered.Caused by Personnel Error.Shift Foreman Involved in Event Counseled + (ML20154M275)
- ML20154M276 + (ML20154M276)
- ML20154M278 + (ML20154M278)
- IR 05000338/1988007 + (ML20154M279)
- ML20154M280 + (ML20154M280)
- ML20154M282 + (ML20154M282)
- ML20154M283 + (ML20154M283)
- ML20154M284 + (ML20154M284)
- ML20154M287 + (ML20154M287)
- ML20154M289 + (ML20154M289)
- PY-CEI-NRR-0864, Forwards Supplementary Matl for Updated Sar,Consisting of Logic & Functional Control Diagrams for Inclusion in Chapter 7 & Figure for Chapter 9.Figure Replaces Inadvertently Provided Figure Depicting Different Sys + (ML20154M290)
- ML20154M291 + (ML20154M291)
- ML20154M294 + (ML20154M294)
- ML20154M295 + (ML20154M295)
- 2CAN058810, Forwards Permanent Repair of Arkansas Nuclear One Unit 2 Pressurizer. All Work on Repair Successfully Completed,Per Util Plan Presented at 871026 Meeting + (ML20154M296)
- ML20154M299 + (ML20154M299)
- ML20154M300 + (ML20154M300)