ML20154M229

From kanterella
Jump to navigation Jump to search
Forwards Initial Exam Rept 50-368/98-301 for Exam Conducted on 980831-0904.Exam Included Evaluation of 5 Applicants for Senior Operator upgrade,3 Applicants for Senior Operate Instant & 6 Applicants for RO License
ML20154M229
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/30/1998
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
Shared Package
ML20154M198 List:
References
50-368-98-301, NUDOCS 9810200206
Download: ML20154M229 (4)


See also: IR 05000368/1998301

Text

a

.

[N

UNITED STATES

y\\

/

NUCLEAR REGULATORY COMMISSION

~

f

REGloN IV

d

611 RYAN PLAZA DRIVE, SiflTE 400

%g

ARLINGTON. TEXAS 760118064

September 30,1998

C. Randy Hutchinson, Vice President

Operations

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333

Russellville, Arkansas 72801-0967

SUBJECT: NRC INSPECTION REPORT 50-313/98-301;50-368/98-301

Dear Mr. Hutchinson:

From August 31 through September 4,1998, an operator licensing certification inspection was

conducted at your Arkansas Nuclear One, Unit 2, reactor facility. The enclosed report presents

the scope and results of that inspection.

The inspection included an evaluation of five applicants for a senior operator upgrade, three

applicants for a senior operator instant, and six applicants for a reactor operator license. We

determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate

licenses have been issued.

The written examinations were adequate for administration as submitted. The operating

examinations, consisting of the scenarios, job performance measures with prescripted

'

questions and the administrative section, were inadequate for administration as submitted.

Required changes involved significant revisions to all scenarios and the administrative sections,

as well as substantial modification or change from open to closed reference of numerous

prescripted questions in the job performance measures. These revisions, changes, and

modifications were necessary to achieve a cognitive level of difficulty which would discriminate

at the required knowledge level and conform to the guidance in NUREG-1021, " Operator

Licensing Examination Standards," Interim Revision 8.

These revisions were necessary to satisfy the NRC's individual test item expectations,

consistent with the NRC's Examination Standards. We reviewed our specific concerns and

recommendations with your staff and believe they now have a better understanding of the

NRC's examination expectations. We commend your staff for their prompt and effective efforts

1

to enhance the examinations with no adverse effect on the examination schedule.

Consequently, no further response to address this matter is required.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

1

\\

\\

y

.

9810200206 981014

I

(DR

ADOCK 05000368

f

fEL2

L

..

.

.

Entergy Operations, Inc.

-2-

'

Should you have any questions concerning this inspection, we will be pleased to discuss them -

with you.

Sincerely,

/s/

John L. Pellet, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-368

License Nos.: APF-6

Enclosure:

NRC Inspection Report

50-368/98-301

cc w/ enclosure (Attachment 1 and 2):

Sherrie Cotton, Training Manager

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333

Russellville, Arkansas 72801-0967

cc w/ enclosure (Attachment 1):

Executive Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286

Manager, Washington Nuclear Operations

ABB Combustion Engineering Nuclear

Power

12300 Twinbrook Parkway, Suite 330

,

Rockville, Maryland 20852

.

. . ..

. _.. ..

_ _ . _ _ . _ _ _ _ . _ . . . _ _ _ . _ _ _ .

. - _ _ .

_

~

..

___

l

.

.-

Entergy Operations, Inc.

-3-

l

County Judge of Pope County

Pope County Courthouse

Russellville, Arkansas 72801

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

David D. Snellings, Jr., Director -

Division of Radiation Control and

1

Emergency Management

Arkansas Department of Health

4815 West Markham Street, Mail Slot 30

i

Little Rock, Arkansas 72205-3867

Manager

Rockville Nuclear Licensing -

Framatome Technologies

1700 Rockville Pike, Suite 525

Rockville, Maryland 20852

1

.

.

Entergy Operations, Inc.

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

'

i

bec to DCD (IE01)(IE42)

'

bec distrib, by RIV w/ enclosures and Attachment 1 only:

Regional Administrator

Resident inspector

,

DRS Director

DRS Deputy Director

,

DRP Director

MIS System

'

Branch Chief (DRP/C)

RIV File

Project Engineer (DRP/C)

DRS-PSB

Branch Chief (DF;P/TSS)

bec w/ enclosure and Attachment 1-2:

R. Gallo (HOHB/NRR)(MS:9D4)

,

L. Hurley

l

l

,

DOCUMENT NAME:

To receive co sy of document. Indicate in box: *C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy

RIV:SRE:OB

E SRE:OB l

SRE:OB l

SRE:OB l

RE:OB l

C:OB

C:PBC

C:OB

,

MEMurphy/imb

TOMcKernon

HFBundy

SLMcCrory

RELantz

JLPellet

CSMarschall

JLPellet

09/30/98

09/29/98

09/29/98

09/29/98

09/30/98

09/29/98 10/ /98

09/29/98

OFFICIAL RECORD COPY