Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BECO-88-133, Forwards Response to NRC Bulletin 88-05 & Suppls 1 & 2, Nonconforming Matls, Supplied by Piping Supplies,Inc at Folsom,Nj & West Jersey Mfg Co at Williamstown,Nj + (ML20154G197)
- ML20154G200 + (ML20154G200)
- ML20154G203 + (ML20154G203)
- ST-HL-AE-2655, Summarizes Results of Eddy Current Insp of Bottom Mounted Instrumentation Thimbles,Short & long-term Corrective Action & How Results Compare to European Data & Action Plan + (ML20154G205)
- 05000352/LER-1988-015, :on 880418,emergency Diesel Generator auto-started Due to Unplanned Test Start Signal.Caused by Personnel Error.Training Memo Issued to All Field Engineers Requiring Completion of Stated Form + (ML20154G207)
- ML20154G208 + (ML20154G208)
- ML20154G209 + (ML20154G209)
- ML20154G211 + (ML20154G211)
- ML20154G214 + (ML20154G214)
- ML20154G216 + (ML20154G216)
- ML20154G219 + (ML20154G219)
- ML20154G226 + (ML20154G226)
- 05000280/LER-1986-002, :on 860108,unit Tripped from 97% Power & Specific Activity Sample of Reactor Coolant Exceeded Tech Spec Dose Equivalent I-131 Limit.Caused by Iodine Spike. Level Monitored Every 4 H + (ML20154G228)
- 05000456/LER-1998-003-07, :on 980906,loss of Offsite Power Event Was Experienced Due to Electrical Fault.Caused by Matl Dislodged by High Winds.Maint Contract Specifications Will Be Revised to Establish Requirements for Housekeeping + (ML20154G231)
- ML20154G232 + (ML20154G232)
- 05000424/LER-1988-021, :on 880712,discovered That Procedure for Performing Surveillance Re Tech Spec Resistance Values of 125 Volt Dc Battery Sys Inadequate.Caused by Inadequate Procedure.Procedure Revised + (ML20154G233)
- ML20154G236 + (ML20154G236)
- ML20154G238 + (ML20154G238)
- 05000382/LER-1997-032-01, Forwards LER 97-032-01,re Details of Noncompliance with Plant TS Due to Failure to Meet GDC 54,per 10CFR50.73 (a)(2)(i)(B) + (ML20154G239)
- 05000352/LER-1986-006-01, :on 860122,failure to Perform Tech Spec Surveillance Requirements Discovered.Caused by Inadequate Communication of Surveillance Test Due Dates.Administrative Guideline Implemented + (ML20154G242)
- ML20154G243 + (ML20154G243)
- ML20154G245 + (ML20154G245)
- ML20154G249 + (ML20154G249)
- ML20154G250 + (ML20154G250)
- ML20154G251 + (ML20154G251)
- ML20154G254 + (ML20154G254)
- ML20154G256 + (ML20154G256)
- IR 05000341/1998016 + (ML20154G258)
- ML20154G262 + (ML20154G262)
- ML20154G266 + (ML20154G266)
- ML20154G267 + (ML20154G267)
- ML20154G269 + (ML20154G269)
- ML20154G271 + (ML20154G271)
- ML20154G273 + (ML20154G273)
- ML20154G274 + (ML20154G274)
- ML20154G275 + (ML20154G275)
- 05000301/LER-1988-001, Provides Complete Copy of LER 88-001-00 Re Reactor Trip Due to Malfunction of Instrument Bus Power Supply Mechanical Interlock to Replace LER Forms Attached to . Certain Info Missing from Page 1 of Subj Forms + (ML20154G277)
- ML20154G278 + (ML20154G278)
- ML20154G279 + (ML20154G279)
- ML20154G283 + (ML20154G283)
- ML20154G284 + (ML20154G284)
- ML20154G285 + (ML20154G285)
- ML20154G289 + (ML20154G289)
- ML20154G290 + (ML20154G290)
- ML20154G292 + (ML20154G292)
- ML20154G293 + (ML20154G293)
- ML20154G294 + (ML20154G294)
- 05000301/LER-1988-001-01, :on 880407,reactor Trip Occurred & Safety Injection Initiated Due to Low Pressurizer Pressure Signal. Caused by Procedure Inadequacy,Personnel Error & Design Deficiency.Instrument Bus Power Returned to Normal Supply + (ML20154G295)
- ML20154G298 + (ML20154G298)
- ML20154G299 + (ML20154G299)
- ML20154G300 + (ML20154G300)