Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20153B389 + (ML20153B389)
- ML20153B391 + (ML20153B391)
- ML20153B393 + (ML20153B393)
- ML20153B394 + (ML20153B394)
- ML20153B398 + (ML20153B398)
- ML20153B400 + (ML20153B400)
- NG-98-1587, Forwards Monthly Operating Rept for Aug 1998 for Daec. Revised Contents of Monthly Operating Rept & Distribution Have Been Made in Accordance with DAEC Tss,Section 5.6.4,per GL 97-02 + (ML20153B404)
- ML20153B405 + (ML20153B405)
- ML20153B406 + (ML20153B406)
- ML20153B409 + (ML20153B409)
- ML20153B410 + (ML20153B410)
- 05000498/LER-1988-017, :on 880211,operations Personnel Notified That Personnel Air Lock Sealing Air Sys Containment Isolation Valves Did Not Meet Requirements of GDC 57.Caused by Design Error.Mod Implemented to Meet Requirement + (ML20153B412)
- 05000302/LER-1978-037-01, /01T-0:on 780804,B&W Reported That Atypical Weld Matl May Have Been Used in Constructing Plant Reactor Vessel.No Hazard to Health and Safety Determined + (ML20153B413)
- ML20153B414 + (ML20153B414)
- ML20153B416 + (ML20153B416)
- ML20153B422 + (ML20153B422)
- ML20153B425 + (ML20153B425)
- ML20153B428 + (ML20153B428)
- ML20153B429 + (ML20153B429)
- ML20153B430 + (ML20153B430)
- A07306, Informs That Utils Do Not Possess,Use or Transport Model SPEC 2-T Radiographic Exposure Devices,Per Bulletin 88-006 + (ML20153B432)
- PY-CEI-NRR-0821, Forwards Vols I & II to Rev 1 to Special Test Procedure Sp 1E68-001, Sys Vibration Special Test Procedure & Addendum 1 to Rev 1 to Test Procedure Sp 1E68-001,in Response to NRC Question on NSSS Vibration Testing Program + (ML20153B436)
- ML20153B437 + (ML20153B437)
- ML20153B438 + (ML20153B438)
- IR 05000317/1987028 + (ML20153B443)
- ML20153B444 + (ML20153B444)
- ML20153B447 + (ML20153B447)
- ML20153B449 + (ML20153B449)
- ML20153B451 + (ML20153B451)
- 05000424/LER-1988-006, :on 880215,reactor Trip Initiated by Turbine Trip When Generator Field Ground Tripped Main Generator. Caused by Failure to Provide Adequate Work Instructions to Maint Electrician.Maint Foreman Counseled + (ML20153B452)
- ML20153B453 + (ML20153B453)
- ML20153B455 + (ML20153B455)
- ML20153B456 + (ML20153B456)
- ML20153B457 + (ML20153B457)
- ML20153B464 + (ML20153B464)
- ML20153B468 + (ML20153B468)
- ML20153B470 + (ML20153B470)
- TXX-8830, Advises of Revised Dates for Full Compliance for Violations Noted in Insp Repts 50-445/86-31 & 50-446/86-25.Units 1 & 2 Will Be in Full Compliance by Fuel Load + (ML20153B471)
- ML20153B472 + (ML20153B472)
- ML20153B475 + (ML20153B475)
- ML20153B477 + (ML20153B477)
- ML20153B478 + (ML20153B478)
- ML20153B480 + (ML20153B480)
- ML20153B486 + (ML20153B486)
- SNRC-1473, Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Util Found That Core Spray & RHR Sys Are Only safety-related Sys Where Foregoing Concerns Could Be Potentially Applicable + (ML20153B487)
- ML20153B491 + (ML20153B491)
- ML20153B492 + (ML20153B492)
- ML20153B493 + (ML20153B493)
- 3F0788-03, Submits Response to NRC Bulletin 88-004, Potential Safety- Related Pump Loss. Completion of Piping Sys Evaluation & Development of short- & long-term Mods to Plant Operating Procedures Expected by 881209 + (ML20153B494)
- B17452, Requests Addl 21 Days (Until 981008) to Help Ensure Development of Comprehensive & High Quality Response to NOV 50-336/98-201 + (ML20153B496)
- IR 05000219/1988014 + (ML20153B498)