ML20153B406

From kanterella
Jump to navigation Jump to search
Forwards Revised Pages for Quarterly Dose Assessment Rept for Third Quarter 1987 Issued on 871125
ML20153B406
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/09/1988
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20153B411 List:
References
TASK-2.C.1, TASK-2.C.3, TASK-TM 4410-88-L-0038, 4410-88-L-38, NUDOCS 8803220124
Download: ML20153B406 (1)


Text

i i

GPU Nuclear Corporation 0

.* Nuclear

=ts=ss48o e

Middletown, Pennsytvania 17057 0191 717 944-7621 TELEX 84-2386 Writer's Direct Dial Number:

(717) 948-8461 March 9, 1988 4410-88-L-0038/0080P US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sirs:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Quarterly Dose Assessmnt Report Update - Third Quarter 1987 The Quarterly Dose Assessment Report - Third Quarter 1987 was issued on November 25, 1987. Attachment 2 of the subject report provides an effluent summary for liquid and gaseous effluents. Minor calculational inaccuracies were uncovered on Attachment 2, Page 2, and were corrected as follows:

1.

Item II.C.1 - Total teleases (not including alpha) (C1) for August should be 1.32E-6, for September 1.26E-6, and for Total Third Quarter 4.31E-6.

2.

Item II.C.3 - Gross alpha radioactivity (C1) for August should be less than LLD and for Total Third Quarter 4.405-8.

These corrections are also reflected on Attachment 2, Page 4.

The revised pages are attached.

Sincerely, PDR ADOCK 05000320

/.

/)

8803220124 880309

/

R PDR F. R. Standerfer Director, THI-2 EDS/ emf Attachments

[

cc: Regional Administrator, Region 1 - W. T. Russell Director, TMI-2 Cleanup Project Directorate - Dr. W. D. Travers g g GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

-