Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20149H787 + (ML20149H787)
- ML20149H789 + (ML20149H789)
- RBG-41122, Forwards Applications for Temporary Certification of Addl Personnel at Rbs,Clarifying Addl Personnel to Operate Drinking Water Sys to Ensure Adequate Protection of Plant Personnel During Potential Excursions.Encl Withheld + (ML20149H790)
- ST-HL-AE-2507, Forwards Summary of Current Emergency Plan Implementing Procedures,Incorporating Current Revs of Procedures Submitted Previously as Well as New Procedures + (ML20149H793)
- NG-94-4485, Notifies NRC of Licensees Intent to Convert Plant TS to New Std TS NUREG-1433.Conversion Part of Licensees Continuing Program to Improve Quality of Plant Ts,Resulted in Substantial short-term Improvements + (ML20149H794)
- ML20149H795 + (ML20149H795)
- ML20149H796 + (ML20149H796)
- ML20149H797 + (ML20149H797)
- ML20149H798 + (ML20149H798)
- ML20149H799 + (ML20149H799)
- TXX-9433, Forwards Relief Requests A-1 & A-2,rev 1,respectively to CPSES Unit 2 ISI Program + (ML20149H801)
- ML20149H804 + (ML20149H804)
- ML20149H805 + (ML20149H805)
- 3F1294-21, Requests Extension for Response to Re GL-92-08. Request Necessary to Allow Addl Time for Adequate Internal Mgt Review + (ML20149H808)
- ML20149H810 + (ML20149H810)
- 1CAN129403, Requests Approval to Use 1989 Edtition of Section XI of ASME Code to Test Ano,Unit 1 Mssvs,Beginning W/Testing to Be Conducted During Refueling Outage Scheduled to Begin 950214 + (ML20149H811)
- IR 05000445/1987037 + (ML20149H813)
- RBG-41124, Updates Util 940623 Supplemental Response to GL 88-20,Suppl 4,revising IPEEE Submittal Date to 950627 + (ML20149H814)
- ML20149H815 + (ML20149H815)
- ML20149H817 + (ML20149H817)
- ML20149H818 + (ML20149H818)
- ML20149H819 + (ML20149H819)
- 05000278/LER-1994-006-03, :on 941110,identified That Flow Input Signals to APRMs Reading Higher than Actual Core Flow Conditions. Caused by Change in Plant Operating Strategy.Aprms Adjusted + (ML20149H820)
- ML20149H821 + (ML20149H821)
- B15064, Requests Relief from Performing Volumetric Exam of Inner Radius of SG Main Steam Nozzle + (ML20149H822)
- ML20149H824 + (ML20149H824)
- ML20149H825 + (ML20149H825)
- ML20149H826 + (ML20149H826)
- ML20149H828 + (ML20149H828)
- ML20149H833 + (ML20149H833)
- ML20149H840 + (ML20149H840)
- 05000498/LER-1988-007, :on 880115,surveillance Procedure Review Identified Incorrectly Applied Air Density Correction Factors Used in Airflow Calculations.Caused by Weakness in Review of HVAC Filter Test Procedures + (ML20149H844)
- ML20149H845 + (ML20149H845)
- ML20149H847 + (ML20149H847)
- ML20149H848 + (ML20149H848)
- 05000302/LER-1994-010, :on 941114,discovered That Door Between Control Complex & Bldg Roof Blocked Open for Roofing Work,Resulting in Operation Outside Design Basis.Caused by Personnel Error. Door Immediately Closed + (ML20149H849)
- ML20149H850 + (ML20149H850)
- ML20149H853 + (ML20149H853)
- ML20149H855 + (ML20149H855)
- ML20149H856 + (ML20149H856)
- NRC-94-0129, Forwards Latest Approved Copy of IST Program (Plan) for Pumps & Valves,Rev 3,Change 8.Program Changes Submitted Do Not Constitute 10 Year Program Update as Required by 10CFR50.55a + (ML20149H857)
- ML20149H860 + (ML20149H860)
- ML20149H862 + (ML20149H862)
- ML20149H863 + (ML20149H863)
- ML20149H864 + (ML20149H864)
- IR 05000266/1988002 + (ML20149H865)
- ML20149H866 + (ML20149H866)
- SNRC-1430, Forwards Response to Generic Ltr 88-02 Indicating Interest in Isap II for Plant + (ML20149H867)
- ML20149H868 + (ML20149H868)
- ML20149H869 + (ML20149H869)
- ML20149H871 + (ML20149H871)