ML20149H789
| ML20149H789 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/12/1988 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| SL-4141C, NUDOCS 8802220104 | |
| Download: ML20149H789 (6) | |
Text
.
,,sw s
.e e'i
- 3.
t
=
~
L Georgia Power
- t.. t o sc..
SL-4141c 1857C X7G]l7-H200 February 12, 1988 U. S. Nuclear Regulatory Comitsien ATTN:
Document Control Desk Washington, D. C.
20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 Ou11LA301MLLICENSINUVEHllIALS Gentle en:
Enclosed are updated listings of outstanding licensing requests for Plant Hatch.
Enclosure 1,
tabulated chronologically by Georgia Power Cc eany's submittal
- date, lists items which are ready for closure. prioritizes the four most significant outstanding submittals in terms of value to Georgia Power Company. is a listing of those items requiring submittal of additional information by Georgia Pomer.
Georgia Fower Co pany is prepared to promptly discuss and provide any additional information which the NRC staf f may desire in its review of the subject issues.
Sincerely, N%
L. T. Gucma AoOl JCJ/lc i i
Enclosures:
1.
Outstanding Licensing Submittals Requiring NRC Action 2.
Outstanding Licensing Submittals Prioritized List 3.
Outstanding Licensing Submittals Requiring Additional Information c:
(see next page) 9802220104 880212 PDF A D O C F. 05000321 P
Geo: pia Power d U. S. Nuclear Regulatory Commission February 12, 1988 Page Two e: Gto.LalAl0*tLCOGany Mr. J. P. O'Reilly, Sr. Vice President - Nuclear Operations Mr. J. T. Beckham, Jr., Vice President - Plant Hatch GO-NORMS V. d d Ucitar Rf2gittory Coml151gn,_H13Aington,Jg Mr. L. P. Crocker, Licensing Project Manager - Hatch U1_S134 tlt iLBi g ull tQrLCOMils i onJ_e gicIL11 Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch l
I 1857C
~x,
Geotyia Power ENCLOSURE 1 PLANT HATCH - UNITS 1, 2 NRC 00CKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 0U151A301HG _LI C E RS ING_SU BM I T T A LSEQU I R I N G N R CJW Q!{
LETTER HATCH DAIE VXII SUBRCI Key 0-APPROVAL OF ITEM REQUIRED FOR UPC0HING OUTAGE C-NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT N-ITEM ADDED SINCE LAST REPORT 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISHIC SPECTRA BROADENING 01/05/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
DELETE REQUIREMENT FOR HYDROGEN RECCNBINERS 02/26/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FRCH OPERATING LICENSE VICE CONSTRUCTION PERMIT
\\
03/27/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETHEEN UNITS 09/09/S6 321,366 CHANGE TO TECHNICAL SPECIFICATIONS RIVER LEVEL 10/24/66 321,366 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION CCNPLIANCE - ADD REQUIREMENT OF PERFORHING EVERY THIRD TEST OT EQUIPHENT CONTROLLED FROH REHOTE SHUTDCHN PANEL! FRCH SAID PANELS 11/14/86 321,366 RESPONSE TO VERBAL REQUEST FOR ADDITIONAL INFORMATION - CABLE TRAY SUPPORTS l
l IS57C El-1 02/11/88 SL-4141 w,
GeorgiJ Poner ENCLOSURE 1 (Continued)
W ISLANQlhG 11CEN_5]NG_.$QSMl))ALS E QUIRING NRC ACTIOS LETTER HATCH Dill USil SUDHCI 03/04/87 321,366 REQUEST FOR ADDITIONAL INFORMATION SE!SHIC SOIL ANALYSIS 03/20/87 366 C
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
HYDROGEN HATER CHEMISTRY 05/01/87 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
GASEOUS EFFLUENT RELEASE POINTS 07/13/87 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
ELECTRICAL SURVEILLANCE INTERVAL 09/22/87 366 0
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
STANDBY LIQUID CONTROL SYSTEM OPERATION USING ENRICHED SODIUM PENTABORATE 10/21/87 321,366 C
PROPOSED CHANGE TO TtC"NICAL SPECIFICATIONS -
FUEL THERMAL LIMITS AND REFUELING OPERATIONS j
12/21/87 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
MAIN STEAM ISOLATION VALVE SURVEILLANCE TESTIN0 01/04/88 366 N
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
H)DR0 STATIC AND LEAK TESTING ABOVE 2120F USING NON-NUCLEAR HEAT
)
1857C El-2 01/15/88 SL-4141 x,
O Geo:gia P0ner ENCLOSURE 2 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321. 50-366 OPERATING LICENSES DPR-57, NPF-5 GJISIEiD ING_LIGNS IEG_S UB MIllALS_ERI OSIII2 E D_LISI REASON SUBHCI FOR ERICRITY 1.
Approval Required for PROPOSED CHANGE TO TECHNICAL Startup from Current SPECIFICATIONS - SLCS OPERATION Outage 2.
To Prcclude Shutdown PROPOSED CHANGE TO TECHNICAL Ouring Low River Flow SPECIFICATIONS - RIVER LEVEL Conditions 3.
Unnecessary Plant PROPOSED CHANGE TO TECHNICAL Shutdown - Permit SPECIFICATIONS -
18 month cycles ELECTRICAL SURVEILLANCE INTERVAL 4.
Future Generation PROPOSED LICENSE EXTENSIONS TO Needs TO 40 YEARS Note:
Sut ittal dates are listed on Enclosure 1.
i i
l 1557C E2-1 01/15/88 SL-4141 j
.y..,
Geo!piaPot\\er ENCLOSURE 3 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 W T S T A NDU1G_LIC UlilNG_SUMI T T A LS R EQULR ISGlDDlIl0N A L I N FORM AT I 03 LETTER HATCH i
0111 UNil SUHJLCI 06/25/85 321,366 PROPOSED CHANGES TO IST PROGRAM 07/17/86 321,366 REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION AMENDHENT TO GASEOUS EFFLUENT RELEASE POINTS VERBAL 321,366 REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED TECHNICAL SPECIFICATION CHANGE TO RPS INSTRUMENTATION SURVEILLANCE FREQUENCY I
l 1657C E3-1 01/15/88 SL-4141
..