ML20149H826
| ML20149H826 | |
| Person / Time | |
|---|---|
| Site: | 07000734 |
| Issue date: | 07/21/1997 |
| From: | Adams M NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Asmussen K GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER |
| References | |
| TAC-L30968, NUDOCS 9707250203 | |
| Download: ML20149H826 (3) | |
Text
-
~
t
' July 21,L1997
- n m
(
1 1?
RDrNAithN-Asmussen,JDirector ejy JGeneral Atomics Licensing, fafety and Nuclear; Compliance.
/P.O. Boy 85608 L San Diego.l Cali fornia - 92186-9784
SUBJECT:
10 CFR 70.32(E) REVISION T0' PHYSICAL PROTECTION PLAN -
- (TAC NO. L30968)-
1
Dear Dr. Asmassen:
This acknowledges the receipt of your letter of April'24,1997, which.
transmitted a complete revisio of the General Atomics * (GA's) " Fixed Site and
.- Transportation-Plan for the Pr.;ection of Special Nuclear Material of Moderate and Low Strategic Significance " revised April 1997.
J0ur review of the changes has found them to be consistent with the provisions Tof.10CFR703.32(e). Accordingly, they are acceptable for inclasion into the l
jphysical' protection plan,
..We agree that your April 24,'1997, submittal contains information of the type i
g specified in 10 CFR 2,790(d). Accordir<glv, pursuant to Section 2.790(d)(1),
such information is deemed to be:conmercial or financial within the meaning of l
n 10 CFR 9.17(a)(4L and shall be withheld from public disclosure unless subject i
to the previsions of 10 CFR 9,23.
j Should you have any questions concerning this letter, we will be glad to j
discuss thea with you.
Sincerely
' Original signed by: CGaskir.
j Mary I.. Adams, Section Leader.for i:
Licensing Section 1 Licensing Branch Division of Fuel Cycle Safety p
a;1d Safeguards f
pf hh f'I n
Docket 70-734 License SNM-696
[
lI$_TRJBfTION:-(Control No. 580S) docket!/0J 34 PUBLIC1 NRC File Center' Region IV-WCF0
/
-NMSS r/f/
. FCSS r/f-FCLB r/f WSchwink, FCOB DSchaeffer.'RIV - ff!DA 0FC.
FCCB FCLB'..
6 FCLB
)
O 9
MA[afhsi9 NAME CGaddih PShea 7_n 3
...y j
DATE_
7/t/97 7/>/97 7/7/!97-1 C = COVER-E = COVER & ENCLOS'JRE-N e NO COPY a,N'
'0FFICIAL RECORD COPY i'I0f2N [03 970721 k
ena anocx o7ooo73 c PDR g p
3 I
c..
.w
~'
c,g o T i;; '
? g t
<J<
e
- c., 'l1l ~p9\\ KRW '~
@7 L
y,<
w
, OM t
. UNITED STATES -
..% ~ /* h M
NUCLEAR REGULATORY COMMISSION-
,[*.h llf
- W ASWNGTON, D.C. 20m001 -
J July 21, 1997.-
f p,
. g.g
+
- g g
g >l, l
?
.6 "(Or d eith E.iAsmussen, Director General Atomics 1.
Licensing.' Safety and' Nuclear
.w Compliance ~
- t. O P.O. Box 8508~.
. San Diego, California y 92186-9784 '
1
SUBJECT:
10 CFR 70.32(E) REVISION TO PHYSICAL PROTECTION PLAN -
"(TAC'NO. L30968)
Dear:
Dr. Asmussen:
- This' acknowledges the receipt of your letter of April 24. 1997, which uJtransmitted a complete revision of the General Atomict' (GA's) " Fixed Site and "Transporcation' Plan for the Protection of Special Nuclear Material of Moderate
-and Low Strategic Significance." revised April 1997;
)
OurLreview of the changes has found them to be consistent with the provisions of-10 CFR 703.32(e). 'Accordingly, they are acceptable for inclusion into the
. physical protection plan, i
E
--We agree that your Anril 24. 1997. submittal contains information of the type specified in 10 CFR 2.790(d)..Acr.ordingly pursuant to Section 2.790(d)(1).
suchinformationisdeemedtobecommerciaiorfinancialwithinthemeaningof 1
10 CFR 9.17(a)(4) and sN11 be withheld from public disclosure unless subject to.the provuions of 10 CFR 9.23.
~
I Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely s
,d 4
ary
. Adams. Section Leader a
Licensing Section 1
'E Licensing. Branch Division of Fuel Cycle Safety 3"
and Safeguards DocketE70-734 License SNH-696 ll g-s t :l
+e e
t
$P,'
- p y
- , i.
. p tg
{ l 'f _ _
\\
]/}*O, -'
t N, ' *f i
' UNITED STATES -
A*
~ NUCLEAR. REGULATORY COMMISSION.
1 9 -- x.
1 g -@4
,,,g,g gy gy, g,g,,,,,,,
p
)
m
.... 3 kn i: 00CKET:1 L70-734-j L-
?LICENSEEMGeneral. Atomics.
- San Diego. California;
SUBJECT:
' SAFETY EVALUATION REPORT:' REVISIONS TO PHYSICAL'. PROTECTION PLAN 1
.SUBMIITAL' DATED APRIL 24.-1997
.j IBACKGROURD'
'By letter dated April ~24. 1997. General Atomic's (GA) submitted changes to-4their physical protection plan for their San Diego, California, site.
None.of-a lthe changes represented a decrease in effectiveness relative to the j
7 commitments in the existina approved plan. Thus the changes are consistent-lwiththeprovisions1of.10CFR70.32(e).
.l t'
"'10!SCUSSION c
E cThe April.24, 1997, changes included updates to the physical protection plan i
related to the POL' status of.the site.
changes included modifications to the J
-security. organization. removal of decommissioned buildings, and to operations
- involving SNM.
i
)
All of.-the proposed changes were as a result of an inspection conducted by RIv
.which had noted that the physical protection plan was outdated.
4 The regional inspector. agreed with the changes.
}
)
d p
(
i t
f i
.l 1
s d
9
'y 1
' 4 ';
t 3
/'
L
/
l.l i
e 4
,' y."
t.,
I a [,
,f.
f
- {\\
'\\!'
,