F

]

Il I

'*~

Duke PowerCompany D. L REnv Catawba Nuclear Generatton Department Vice President 80 ConcordRoad (803)DI3:05 Ollice York, $C29745 (8CJ)8313426 Fax DUKEPOWER December 20,1994 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Reply to Request for Additional Information (RAI) Regarding Generic Letter 93-04, " Rod Control System Failure and Withdrawal ofRod Cluster Control Assemblies,10 CFR 50.54(f)"

TAC Nos. M86838 and M86839

Reference:

Letter from Robert E. Martin to David L. Rehn, dated December 5,1994 Gentlemen:

The reference letter stated that the NRC staff had approve (the long-term corrective actions proposed by the Westinghouse Owners Group (WOG) in response to the Rod Control System failure at Salem. The letter also requested that Catawba commit to either implementation of the current order timiag modification and the new current order surveillance test as described in WOG documentation, prior to startup from the next refueling outage that begins later than three months from receipt of the reference letter, or providing an alternative long-term plan and schedule.

Catawba is committed to implementing the long-term corrective actions proposed by the WOG and approved by the NRC. These actions include both the current order timing modification and the new current order surveillance test. The modification will be implemented during the Unit 1 end-of-cycle 8 refueling outage scheduled to begin on February 3,1995 and the Unit 2 end-of-cycle 7 refueling outage scheduled to begin on September 7,1995. The surveillance tests will also be completely implemented during these octages.

I hereby declare

  • hat the above information is true and correct to the best of my knowledge and belief.

P,_

i

ci d 'I a.

Document Control Desk Page 2 December 20,1994 If you have any questions, please call L.J. Rudy at (803) 831-3084.

Very truly yours, fdh b.

J 4G D.L. Rehn LJRis Xc' S.D. Ebneter, Regional Administrator Region II R.J. Freudenberger, Senior Resident Inspector R.E. Manin, Senior Project Manager ONRR 6

i

-