ML20149H798

From kanterella
Jump to navigation Jump to search
Forwards Design Validation Packages Insp Repts 50-445/87-37 & 50-446/87-28 on 871026-1204.No Violations Noted.Rept Notes Technical Open Items Where Design Criteria Considered Inconsistent W/Fsar or Industry Stds
ML20149H798
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/08/1988
From: Charemagne Grimes
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20149H802 List:
References
NUDOCS 8802220112
Download: ML20149H798 (6)


See also: IR 05000445/1987037

Text

7~

.

.h[o neg%

e-

-

UNITED STATES

E

$

NUCLEAR REGULATORY COMMISSION

g

l

WASHINGTO N, D. C. 20555

,o

.....

FEB

8 1998

/

Texas Utilities Electric Company

ATTN: Mr. William G. Counsil

Executive Vice President

{

Skyway Tower

400 North Olive Street

Dallas, TX 75201

SUBJECT:

INSPECTION OF COMANCHE PEAK DESIGN VALIDATION PACKAGES:

50-445/87-37, 50-446/87-28

Dear Mr. Counsil:

This letter forwards the results of the subject inspection conducted by the

NRC's Office of Special Projects (0SP).

The inspection team was comprised of

personnel from OSP as well as contractors.

The inspection took place from

October 26 through December 4,1987 at Stone & Webster offices in Boston,

Massachusetts and Cherry Hill, New Jersey.

The team reviewed Ebasco Design

Basis Documents for the Systems Interaction Program in the Stone & Webster

Cherry Hill office.

The team reviewed the TU Electric Design Validation

electrical,yP) in the areas of mechanical / fluids systems, civil / structural,

Packages (D

instrumentation / control, and systems interaction.

For these

areas, the review covered both the design criteria ana design criteria imple-

mentation. For the Systems Interaction Program, the team reviewed only design

criteria, such as the Design Basis Documents (OB0s).

The team also reviewed

HVAC systems with respect to closecut of Open Items identified in the previous

inspection.

,

l

l

This inspection complements the NRC's previous review of DVPs which is docu-

'

mented in Inspection Report 50-445/87-19, 50-446/87-15, dated October 15, 1987.

The enclosed report notes that there are a few significant areas that the team

l

was unable to review since they were not complete, e.g., implementation of the

l

Systems Interaction Program DBDs and some electrical design work.

The team

will inspect these areas when completed.

As was done in Inspection Report

50-445/87-19 and 50-446/87-15, the enclosed report identifies technical Open

Items in cases where (1) design criteria were considered inconsistent with the

FSAR or industry standards or (2) additional justification and/or analysis was

necessary to confirm existing designs or hardware.

Our final conclusions on

the design validation process will be based on a followup inspection which will

l

include resolving Open Items identified in this and the previous inspection

report and additional inspections (as noted previously) of design areas not yet

inspected.

To support the followup inspection, you are requested to provide a

written response to this and the previous inspection report, including confirma-

tion of the "project actions" pertaining to closecut of HVAC Open Items which are

identified in the enclosed report.

Your response should address the Open Items,

their safety significance, and the extent that these items may pertain to docu-

ments not reviewed by the NRC.

8802220112 880208

PDR

ADOCK 05000445

o

PDR

y

s

>

-

e

Mr. William G. Counsil

-2-

Texas Utjlities Electric Company

Both NRC inspections have included documents in the review samples that were

also reviewed by the TU Electric Engineering Functional Evaluation (EFE)

'

Program, as well as other documents. We will require that you review these NRC

reports with regard to (1) significant items identified by the team (which you

would expect EFE also to have identified) which EFE failed to identify and

(2) significant items identified by the team for documents not in EFE's review

scope, i.e., to determine whether this scope is adequate.

In summary, the following actions are required for the NRC to complete its

review of Design Validation Packages and the Project Status Reports for the

above areas: (1) additional inspections for the Systems Interaction Program and

selected other areas, (2) TU Electric's written response to all Open Items

identified in NRC design inspections, (3) TV Electric's review of NRC results

with regard to potential enhancement of the EFE program, and (4) NRC followup

inspections as required to assess TV Electric's actions, i.e., (2) and (3).

Your prompt actions are requested as it is our intent to reflect all of the

above matters in the Safety Evaluation Report (s) on the Project Status Reports

for these disciplines.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Sincerely,

.

Cr~_L

u A ceA

Christopher I. Grimes, 9tvetor

Comanche Peak Project Division

Office of Special Projects

Enclosure:

Inspection Report

l

cc: see next page

!

l

l

l

l

!

i

{

l

,

,

.

6

.

W. G. Counsil

Comanche Peak Steam Electric Station

Texas Utilities Electric Company

Units 1 and 2

CC:

Jack R. Newman, Esq.

Asst. Director for Inspec. Programs

Newman & Holtzinger, P.C.

Comanche Peak Project Division

Suite 1000

U.S. Nuclear Regulatory Commission

1615 L Street, N.W.

P. O. Box 1029

Washington, D.C. 20036

Granbury, Texas 76048

Robert A. Wooldridge, Esq.

Regional Administrator, Region IV

Worsham, Forsythe, Sampels &

U.S. Nuclear Regulatory Commission

Wooldridge

611 Ryan Plaza Drive, Suite 1000

2001 Bryan Tower, Suite 2500

Arlington, Texas

76011

Dallas, Texas

75201

Lanny A. Sinkin

Mr. Homer C. Schmidt

Christic Institute

Director of Nuclear Services

1324 North Capitol Street

Texas Utilities Electric Company

Washington, D.C.

20002

Skyway Tower

400 North Olive Street, L.B. 81

Ms. Billie Pirner Garde, Esq.

Dallas, Texas

75201

Government Accountability Project

Midwest Office

Mr. Robert E. Ballard, Jr.

104 East Wisconsin Avenue

Director of Projects

Appleton, Wisconsin 54911

Gibbs and Hill, Inc.

11 Penn Phza

New York,

York 10001

David R. Pigott, Esq.

Orrick, Herrir.gton & Sutcliffe

'

600 Montgomery Street

Mr. R. S. Howard

San Francisco, California

94111

Westinghouse Electric Corporation

P. O. Box 355

Anthony Z. Roisman, Esq.

Pittsburgh, Pennsylvania

15230

Suite 600

1401 New York Avenue, NW

Renea Hicks. Esq.

Washington, D.C. 20005

Assistant Attorney General

Environmental Protection Division

Robert Jablon

P. O. Box 12548, Capitol Station

Bonnie S. Blair

i

Austin, Texas

78711

Spiegel & McDiarmid

1350 New York Avenue, NW

!

Mrs. Juanita Ellis, President

Washington, D.C. 20005-4798

Citizens Association for Sound Energy

1426 South Polk

George A. Parker, Chairman

Dallas, Texas

75224

Public Utility Comittee

Senior Citizens Alliance Of

.

Ms. Nancy H. Williams

Tarrant County, Inc.

j

CYGNA Energy Services

6048 Wonder Drive

'

2121 N. California Blvd., Suite 390

Fort Worth, Texas

76133

Walnut Creek, CA 94596

l

~

.

.

.>

c

k. G. Counsil

-2-

Comanche Peak Electric Station

Texas Utilities Electric Company

Units 1 and 2

CC:

Joseph F. Fulbright

Bureau of Radiation Control

Fulbright & Jaworski

State of Texas

1301 McKinney Street

1100 West 49th Street

houston, Texas 77010

Austin, Texas

78756

Roger 0. Walker

Manager, Nuclear Licensing

Texas Utilitie Electric Company

Skyway Tower

4C0 North Olive Street, L.B. 81

Dallas, Texas

75201

Mr. Jack Redding

c/o Bethesda Licensing

Texas Utilities Electric Company

3 Metro Center, Suite 610

Bethesda, Maryland 20814

Willian, A. Burchette, Esq.

Counsel for Tex-La Electric Cooperative

of Texas

!

Heron, Burchette, Ruckert & Rothwell

Suite 700

1025 Thomas Jefferson Street, NW

Washington, D.C.

20007

James P. McGaugby, Jr.

GDS Associates, Inc.

Suite 720

1850 Parkway Place

Marietta, Georgia

30067

Administrative Judge Peter Bloch

U.S. Nuclear Regulatory Commission

Washington, D.C.

20555

Elizabeth B. Johnson

Administrative Judge

Oak Ridge National Laboratory

P. O. Box X, Building 3500

Cak Ridge, Tennessee 37830

Dr. Kenneth A. McCollom

1107 West Knapp

Stillwater, Oklahoma

74075

Cr. Walter H. Jordan

c/o Carib Terrace Motel

522 N. Ocean Boulevard

Pompano Beach, Florida

33062

l

.-

..

Table of Contents

Ta b l e o f C o n t e n t s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Individuals Participating in Inspection Exit Meetings .................... 11

Introduction and Summary .................................................. 1

Mechanical /Fl uid Sys tems - Suma ry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Mechanical / Fluid Systems - Evaluation of Documents Reviewed . . . . . . . . . . . . . .

6

Instrumentati on & Con trol s - Suma ry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

Instrumentation & Controls - Evaluation of Documents Reviewed . . . .. . . .. .. . 22

E l e c t r i c a l - S u ma ry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 0

Electrical - Evaluation of Documents Reviewed . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43

Sys tems I nte racti on P rog ram - Suma ry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53

Systems Interaction Program - Evaluation of Documents Reviewed . . . . . . .. . . . 55

C i v i l / S t ru c t u r a l - S u m a ry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 6

Civil / Structural - Evaluation of Documents Reviewed . . . . . . . . . . . . . . . . . . . . . . 75

HVAC Sys teas - Res ol u tion of Open I tems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109

i

.

.

Individuals Participating In Inspection / Exit Meetings

NAME

TITLE

ORGANIZATION

R. W. Ackley

Project Manager

Stone & Webster Engineering Corp.

S. L. Stamm

Project Engineering Manager

Stone & Webster Engineering Corp.

J. S. Carty

Project Engineer

Stone & Webster Engineering Corp.

L. E. Shea

Asst. Project Engineer

Stone & Webster Engineering Corp.

R. C. Wiesel

Asst. Structural Division Chief

Stone & Webster Engineering Corp.

M. B. Stetson

Asst. Structural Division Chief

Stone & Webster Engineering Corp.

A. Y. C. Wong

Lead Structural Engineer

Stone & Webster Engineering Corp.

R. L. Poltrino

Lead I&C Engineer

Stone & Webster Engineering Corp.

D. Graves

Lead Nuclear Technology Engineer

Stone & Webster Engineering Corp.

L. M. Monty

Asst. Lead. Mech. Engineer

Stone & Webster Engineering Corp.

R. E. Smith

Asst. Lead Mech. Engineer

Stone & Webster Engineering Corp.

W. L. Dewar

Asst. Lead I&C Engineer

Stone & Webster Engineering Corp.

G. R. Tilton

Asst. Lead Structural Engineer

Stone & Webster Engineering Corp.

B. E. Ebbeson

Asst. Lead Structural Engineer

Stone & Webster Engineering Corp.

F. P. Walker

Asst. Lead Electrical Engineer

Stone & Webster Engineering Corp.

R. W. Twigg

EFE Team Leader

Stone & Webster Engineering Corp.

K. A. Schack

I&C Coordinator

Stone & Webster Engineering Corp.

P. W. Ward

Structural Coordinator

Stone & Webster Engineering Corp.

C. Zappile

EFE Program Manager

Stone & Webster Engineering Corp.

J. P. Lawrence

Electrical Coordinator

Stone & Webster Engineering Corp.

i

S. K. Desai

I&C Engineer

Stone & Webster Engineering Corp.

R. J. Faubert

I&C Engineer

Stone & Webster Engineering Corp.

R. C. Patel

I&C Engineer

Stone & Webster Engineering Lorp.

l

J. G. Rosen

I&C Specialist

Stone & Webster Engineering Corp.

C. H. Mullen

I&C Engineer

Stone & Webster Engineering Corp.

J. E. Woods

Audit Coordinator

Stone & Webster Engineering Corp.

T. H. Hayes

Mech. Coordinator

Stone & Webster Engineering Corp.

,

!

T. W. Waters

Mech. Engineer

Stone & Webster Engineering Corp.

l

W. A. Polin

Mech. Engineer

Stone & Webster Engineering Corp.

R. W. Card

Mech. Engineer

Stone & Webster Engineering Corp.

!

!

J. J. Healy

Mech. Specialist

Stone & Webster Engineering Corp.

l

N. J. Piccalo

Electrical Engineer

Stone & Webster Engineering Corp.

l

K. J. Khunkhun

Electrical Consulting Engineer

Stone & Webster Engineering Corp.

K. A. Petty

Electrical Specialist

Stone & Webster Engineering Corp.

i

B. V. Lawton

Structural Engineer

Stone & Webster Engineering Corp.

l

J. V. Hennefeld

Structural Engineer

Stone & Webster Engineering Corp.

R. A. Filosa

Structural Coordinator

Stone & Webster Engineering Corp.

D. J. Fiorello

Structural Engineer

Stone & Webster Engineering Corp.

N. H. Amin

Structural Engineer

Stone & Webster Engineering Corp.

R. D. Ciatto

Structural Engineer

Stone & Webster Engineering Corp.

D. A. West

Supervisor, Systems Interaction

TV Electric Company

J. P. Padalino

Project Manager, NY0

Ebasco

J. J. Ruggiero

Project Engineer

Ebasco

R. Rao

Lead Engineer, HVAC Systems

Ebasco

11