ML20149H856

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-266/88-02 & 50-301/88-02 on 871215-880131.No Violations Noted
ML20149H856
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/11/1988
From: Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20149H859 List:
References
NUDOCS 8802220149
Download: ML20149H856 (2)


See also: IR 05000266/1988002

Text

'

2

..

/. O

.

A

.

FEB ! ! 19!3

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN: Mr. C. W. Fay

Vice President

Nuclear Pcmer Department

231 West Michigan, Room 305

Milwaukee, WI 53201

Gentleren:

This refers to the routine safety inspection conducted by Messrs. R, L Hague

and R. J. Leeman of this office from December 15, 1987 through January 31,

1955. of activities at Point Beach Nuclear Plant, Units 1 and 2, authorized by

hRC Cperating Licenses No. DPR-24 and No. OPR-27 and to the discussion of our

findings with J. J. Zach at the conclusion of the inspt*ction.

The enclosed ccpy of our inspection report identifies areas examined during the

inspection. Within these areas, the inspection Consisted of a selective

eastination of procedures and representative records, observations, and

intervieas with personnel.

No violations of NRC requirements .ere identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC Public

Dccu ent Room,

We mill gladly discuss any questions you have concerning this inspection.

Sincerely,

c;nSt*:A1, s!3::LD LY F.. W. DeTAYr TI

!

W. G. Guldemond, Chief

Projects Branch 2

Enclosure: Inspection Reports

No. 50 266/5S002 (CRP);

No. 50-301/9S002 (ORP)

See Attached Distribution

PJt)- m R!ll I

uV

.

RIf!

Passehl/ib

^ t0 9'

ea)}tte

,

pH

'g.(GIdet nd

'

2ltili'V 9)dI&P l 2fitVS ,

'

t

9802220149 880211

ADOCA 05000266

i

rpR .. ,,

DCD - -

___________-__9

- _ _ _ _ _ _ _

.

k

'

Wisconsin Electric Po.er 2

Company FE911 h.3

Oistribution

_

CC W/*Tclosure:

J. J. Zach, Plant Manager

DCD/DCB (RIOS)

Licensing fee Managem(nt Branch

Resident Inspector, RI!!

Virgil Aanable, Chief

Boiler Section

Charles Thorpscn, Chairman

Wisconsin Public Service

.

'

Commission

R. I. Braund (SLO),

WI Div. of Emergency Government

Lawrence J. PcDonnell, Chie"

Radiation Protection lect:on

WI Cepartment of Health and

l

Social Services, Division

of Health

I

,

i

i

!

,