Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148E552 + (ML20148E552)
- ML20148E553 + (ML20148E553)
- ML20148E554 + (ML20148E554)
- ML20148E556 + (ML20148E556)
- ML20148E561 + (ML20148E561)
- 05000289/LER-1997-006, Forwards LER 97-006-00,resulting from Violation of TS 3.3 & Declaring Reactor Bldg fans,AH-E-1B & C,Inoperable on 970424 + (ML20148E562)
- ML20148E564 + (ML20148E564)
- ML20148E565 + (ML20148E565)
- ML20148E566 + (ML20148E566)
- ML20148E568 + (ML20148E568)
- ML20148E569 + (ML20148E569)
- ML20148E570 + (ML20148E570)
- 05000289/LER-1997-006-01, :on 970424,reactor Bldg Fan Motors Unqualified Cable Termination Occurred Due to Incorrect Engineering Guidance.Caused by Personnel Error.Qualifiable Repair of AH-E-1A Fan Motor Termination Was Installed on 970323 + (ML20148E572)
- ML20148E574 + (ML20148E574)
- ML20148E575 + (ML20148E575)
- ML20148E578 + (ML20148E578)
- NG-97-0836, Responds to Violations Noted in Insp Rept 50-331/97-04. Corrective Actions:Counseled Licensed Operator on Need for Procedural Compliance,Revised Operating Instruction 149 & Issued Memo Emphasizing Procedural Verbatim Compliance + (ML20148E579)
- ML20148E580 + (ML20148E580)
- ML20148E582 + (ML20148E582)
- IR 05000010/1976003 + (ML20148E583)
- ML20148E585 + (ML20148E585)
- ML20148E586 + (ML20148E586)
- ML20148E589 + (ML20148E589)
- ML20148E591 + (ML20148E591)
- ML20148E592 + (ML20148E592)
- ML20148E594 + (ML20148E594)
- ML20148E595 + (ML20148E595)
- ML20148E600 + (ML20148E600)
- 05000282/LER-1997-007-01, :on 970429,declared Both Trains of Spent Fuel Pool Special Ventilation Inoperable Due to Handling Load Over Spent Fuel.Deleted TS Interpretation 3.8-3 & Returned Ventilation Sys to Service When Door Was Shut + (ML20148E604)
- ML20148E605 + (ML20148E605)
- ML20148E606 + (ML20148E606)
- JPN-97-019, Provides Summary of Detailed Evaluation of Postulated Scenarios Described in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions & CA for JAFNPP IAW Ref Commitment + (ML20148E608)
- ML20148E612 + (ML20148E612)
- ML20148E617 + (ML20148E617)
- HL-5404, Provides Description of Changes to Emergency Response Data Sys Data Point Library Reference File in Format Required by NUREG-1394,Rev 1 + (ML20148E618)
- ML20148E619 + (ML20148E619)
- IR 05000346/1987017 + (ML20148E622)
- ML20148E623 + (ML20148E623)
- ML20148E626 + (ML20148E626)
- ML20148E627 + (ML20148E627)
- ML20148E630 + (ML20148E630)
- B16496, Forwards Listing of Wave 1 Sys Which Is Consistent W/Wave 1 Sys Designations That Have Been Provided to NRC in Previous Presentation Matl Used in Public Meetings.Will Provide sys-specific Documentation to Support ICAVP Insp + (ML20148E631)
- ML20148E636 + (ML20148E636)
- ML20148E637 + (ML20148E637)
- ML20148E638 + (ML20148E638)
- ML20148E640 + (ML20148E640)
- ML20148E642 + (ML20148E642)
- ML20148E645 + (ML20148E645)
- ML20148E648 + (ML20148E648)
- ML20148E652 + (ML20148E652)
- ML20148E653 + (ML20148E653)