ML20148E612

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/88-06 & 50-364/88-06 on 880229- 0304 & Notice of Violation
ML20148E612
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/18/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20148E617 List:
References
NUDOCS 8803250263
Download: ML20148E612 (2)


See also: IR 05000348/1988006

Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _

'

'

s
.

-

.

MAR 181988

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

,[labamaPowerCompany

(v ATTH: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(HRC INSPECTION REPORT HOS. 50-348/88-06 AND 50-364/88-06)

This re.fers to the Nuclear Regulatory Commission (NRC) inspection conducted by

A. Gooden on February 29 - March 4,1988.

The inspection included a review of

activities authorized for your Farley facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

The violation, references to pertinent requirements, and

elements to be included in your response are described in the enclosed Notice

of Violation.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

E

S

4

.;\\

8803250263 880318

~

PDR

ADOCK 05000348

.O

DCD

i

_t L */

r-

. .

.

,

,

'

..

Alabama Power Company

2

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAC SIGNED BY .

DOUGLAS M COLUNS

Douglas M. Collins, Chief

Emergency Preparedness and

Radiological. Protection Branch

Division of Radiation Safety

and Safeguards

,

Enclosures:

i

1.

Notice of Violation

2.

Inspection Report

c w/encis:

B. M. Guthrie, Executive Vice President

J. D. Woodard, General Manager -

/W. G. Hairston, III, Vice President -

Nuclear Plant

j Nuclear Support

VJ. W. McGowan, Manager-Safety Audit

/ and Engineering Review

VS. Fulmer, Supervisor-Safety

Audit and Engineering Review

b/c w/encls:

W RC Resident Inspector

Dy Technical Assistant

g . Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

V J. C. Heard, FEMA RIV

V D. B. Matthews, NRR/EPB

RII

RII

RI

Q.k.

jfl

'M

AGooden

TDecker

H ance .

,

3//l, /88

3//0 /88

3/i7/88