Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20147F995 + (ML20147F995)
- ML20147F998 + (ML20147F998)
- ML20147G003 + (ML20147G003)
- NSD-NRC-97-5023, Constitutes Formal Consolidated Responses & Resolutions of Items Discussed in 960411 Telcon Re AP600 Design Certification + (ML20147G008)
- ML20147G009 + (ML20147G009)
- ML20147G011 + (ML20147G011)
- 05000373/LER-1987-038-01, :on 871216,reactor Scrammed on Low Reactor Water Level Due to Feedwater Heater 12C String Isolations. Caused by Design Deficiency in Feedwater Heater 11C.Mods Scheduled to Install Continuous Operating Vent + (ML20147G012)
- ML20147G017 + (ML20147G017)
- ML20147G020 + (ML20147G020)
- ML20147G021 + (ML20147G021)
- ML20147G022 + (ML20147G022)
- ML20147G024 + (ML20147G024)
- VPN-023-97, Requests Exemption from Certain Requirements of 10CFR72 IAW Provisions of Section 72.7, Specific Exemptions + (ML20147G025)
- ML20147G028 + (ML20147G028)
- ML20147G035 + (ML20147G035)
- ML20147G037 + (ML20147G037)
- ML20147G039 + (ML20147G039)
- ML20147G044 + (ML20147G044)
- ML20147G048 + (ML20147G048)
- ML20147G052 + (ML20147G052)
- ML20147G054 + (ML20147G054)
- ML20147G055 + (ML20147G055)
- ML20147G059 + (ML20147G059)
- ML20147G065 + (ML20147G065)
- ML20147G066 + (ML20147G066)
- ML20147G070 + (ML20147G070)
- ML20147G074 + (ML20147G074)
- 05000312/LER-1988-046, :on 871215,discovered That Surveillance Procedure 203.06 C/D Re DHR Valves Not Performed by Tech Spec Date.Caused by Personnel Error.Matrix Addressing Surveillance Procedures Will Be Developed + (ML20147G075)
- ML20147G078 + (ML20147G078)
- ML20147G082 + (ML20147G082)
- ML20147G086 + (ML20147G086)
- ML20147G087 + (ML20147G087)
- B16338, Forwards Response to Request for Addl Info Re Millstone Nuclear Power Station,Unit 2 Third 10-Year ISI Program Plan & Associated Requests for Relief + (ML20147G092)
- ML20147G093 + (ML20147G093)
- ML20147G099 + (ML20147G099)
- ML20147G100 + (ML20147G100)
- ML20147G103 + (ML20147G103)
- ML20147G104 + (ML20147G104)
- ML20147G105 + (ML20147G105)
- ML20147G109 + (ML20147G109)
- ML20147G110 + (ML20147G110)
- ML20147G112 + (ML20147G112)
- ML20147G116 + (ML20147G116)
- ML20147G120 + (ML20147G120)
- ML20147G125 + (ML20147G125)
- ML20147G128 + (ML20147G128)
- ML20147G130 + (ML20147G130)
- ML20147G131 + (ML20147G131)
- B12832, Provides Addl Info Re 871223 Proposed Rev to Tech Specs. Proposed Change Adds Personnel Door to East End of Spent Fuel Pool & Table 3.9-1, Access Doors to Spent Fuel Pool Area + (ML20147G133)
- ML20147G137 + (ML20147G137)
- NRC-88-0053, Forwards Seventh Amend to Participation Agreement Reflecting Manner & Timing for Termination of Wolverine Electric Ownership Interest,Currently 10 % & Anticipated to Terminate by 900102 + (ML20147G143)