Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20147B421 + (ML20147B421)
- B16188, Responds to NRC 961024 Order to Develop,Submit & Begin Implementing Comprehensive Plan Addressing Root Causes of Past Performance Failures + (ML20147B424)
- ML20147B425 + (ML20147B425)
- ML20147B427 + (ML20147B427)
- ML20147B428 + (ML20147B428)
- ML20147B429 + (ML20147B429)
- ML20147B430 + (ML20147B430)
- ML20147B433 + (ML20147B433)
- ML20147B434 + (ML20147B434)
- ML20147B438 + (ML20147B438)
- ML20147B440 + (ML20147B440)
- ML20147B442 + (ML20147B442)
- ML20147B443 + (ML20147B443)
- ML20147B444 + (ML20147B444)
- ML20147B445 + (ML20147B445)
- ML20147B446 + (ML20147B446)
- ML20147B447 + (ML20147B447)
- ML20147B448 + (ML20147B448)
- ML20147B449 + (ML20147B449)
- ML20147B450 + (ML20147B450)
- ML20147B451 + (ML20147B451)
- ST-HL-AE-2515, Responds to Notice of Violation & Proposed Imposition of Civil penalty-Enforcement Action EA-87-240.Corrective Actions:High Head Safety Injection Cold Leg Valves Opened & Plant Surveillance Procedures Revised to Correct Setpoint + (ML20147B453)
- ML20147B454 + (ML20147B454)
- ML20147B455 + (ML20147B455)
- ML20147B456 + (ML20147B456)
- ML20147B458 + (ML20147B458)
- ST-HL-AE-5555, Provides Draft Amended & Restated Participation Agreement, Draft Operating Agreement & Markup of Pages Reflecting Minor Editorial Changes + (ML20147B459)
- ML20147B460 + (ML20147B460)
- ML20147B461 + (ML20147B461)
- ML20147B462 + (ML20147B462)
- ML20147B464 + (ML20147B464)
- ML20147B467 + (ML20147B467)
- ML20147B468 + (ML20147B468)
- ML20147B472 + (ML20147B472)
- ML20147B474 + (ML20147B474)
- ML20147B476 + (ML20147B476)
- ML20147B479 + (ML20147B479)
- ML20147B480 + (ML20147B480)
- ML20147B482 + (ML20147B482)
- ML20147B483 + (ML20147B483)
- ML20147B485 + (ML20147B485)
- 05000498/LER-1987-021, :on 871130,unanticipated Bus Trip & Diesel Generator Start Occurred.Cause Could Not Be Conclusively Determined.Technicians Received Training on Deenergizing ESF Sequencer by Opening Main Circuit Breaker + (ML20147B487)
- ML20147B489 + (ML20147B489)
- ML20147B491 + (ML20147B491)
- ML20147B494 + (ML20147B494)
- ML20147B495 + (ML20147B495)
- PNO-III-97-006, on 970129,inspector Learned That 12 Muzzle Reference Sensors Were Missing from Shipment of Refurbished Devices & Licensee Did Not Make Rept to Nrc.Licensee Search & Investigation for Sensors Continuing + (ML20147B496)
- ML20147B500 + (ML20147B500)
- ML20147B505 + (ML20147B505)
- 05000269/LER-1987-011-04, :on 871202,cable Room Sprinkler Sys Could Not Provide Design Flow.Caused by Design Deficiency.Fire Watches Established Until Sys Operable,Restoring Sys to Operable Condition by Increasing Supply Line Diameter + (ML20147B506)
- ML20147B508 + (ML20147B508)