Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141F968 + (ML20141F968)
- 05000298/LER-1986-008, :on 860318,emergency Diesel Generator 2 Made Inoperable to Inspect Electrical Breaker Cabinets for Future Design Change Implementation.Reactor Equipment Cooling Pumps a & B Taken Out of Svc for Maint + (ML20141F970)
- ML20141F971 + (ML20141F971)
- W3P86-0251, Forwards Revised Re Pressurized Thermal Shock. Typos in Original Do Not Affect Validity of Info + (ML20141F972)
- ML20141F973 + (ML20141F973)
- ML20141F974 + (ML20141F974)
- ML20141F976 + (ML20141F976)
- ML20141F977 + (ML20141F977)
- ML20141F980 + (ML20141F980)
- ML20141F983 + (ML20141F983)
- ML20141F986 + (ML20141F986)
- IR 05000324/1997007 + (ML20141F988)
- IR 05000627/2010008 + (ML20141F990)
- ML20141F991 + (ML20141F991)
- ML20141F993 + (ML20141F993)
- ML20141F995 + (ML20141F995)
- ML20141F996 + (ML20141F996)
- ML20141F999 + (ML20141F999)
- ML20141G000 + (ML20141G000)
- PNO-I-86-031, on 860421,loss of 4,160-volt Vital Bus & All Three Nonvital Buses Experienced.Caused by Vital Bus D Supply Breaker Fault & Trip.Power Restored to Nonvital Buses.Vital Bus D Supply Breaker Damaged + (ML20141G002)
- ML20141G003 + (ML20141G003)
- ML20141G004 + (ML20141G004)
- ML20141G005 + (ML20141G005)
- ML20141G006 + (ML20141G006)
- ML20141G010 + (ML20141G010)
- ML20141G012 + (ML20141G012)
- ML20141G016 + (ML20141G016)
- ML20141G017 + (ML20141G017)
- ML20141G019 + (ML20141G019)
- ML20141G020 + (ML20141G020)
- ML20141G021 + (ML20141G021)
- 05000336/LER-1997-015, Forwards LER 97-015-00 Per 10CFR50.73(a)(2)(v).Also Includes Commitments Made in Ltr + (ML20141G022)
- ML20141G024 + (ML20141G024)
- W3P86-0012, Revises ,Correcting Typos.Discusses Projected Ref Temp Pressurized Thermal Shock (PTS) Value for Reactor Vessel,Per Fracture Toughness Requirements for Protection Against PTS Events + (ML20141G025)
- ML20141G026 + (ML20141G026)
- ML20141G027 + (ML20141G027)
- ML20141G029 + (ML20141G029)
- ML20141G030 + (ML20141G030)
- ML20141G032 + (ML20141G032)
- ML20141G033 + (ML20141G033)
- ML20141G036 + (ML20141G036)
- ML20141G037 + (ML20141G037)
- PNO-III-86-037, on 860418,util Announced Extension of Outage to mid-Jul 1986.Licensee Review of Reevaluation of Design Work Performed on Concrete Embedments & Pipe Supports Will Be Completed by 860501 + (ML20141G039)
- 05000302/LER-1997-012, :on 970531,portions of Industrial Cooling Sys Failed to Meet Es Requirements.Caused by Design Error. Upgraded Associated Piping,Supports & Coolers Inside Containments Are Required + (ML20141G040)
- ML20141G042 + (ML20141G042)
- ML20141G044 + (ML20141G044)
- ML20141G045 + (ML20141G045)
- ML20141G049 + (ML20141G049)
- ML20141G050 + (ML20141G050)
- ML20141G051 + (ML20141G051)
- ML20141G052 + (ML20141G052)