ML20141F995

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec,Revising Excess Flow Check Valve Surveillance Requirements of Section 4.5.0
ML20141F995
Person / Time
Site: Oyster Creek
Issue date: 04/14/1986
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20141F980 List:
References
NUDOCS 8604230244
Download: ML20141F995 (1)


Text

f 4.5-6 L. Deleted "M. Inerting Surveillance When an inert atmosphere is required in the primary containment the oxygen concentration in the primary containment shall be checked 'at least weekly."

"N. Drywell Coating Surveillance Carbon steel test panels coated with Fire-bar D shall be placed inside the drywell near the reactor core midplant level. They shall be removed for visual observation and weight loss measurements during the first, second, fourth and eighth refueling outages."

. O. Instrument Line Flow Check Valves Surveillance The capability of each instrument line flow check valve to isolate shall be tested at least once in every period between refueling outages.

Each time an instrument line is returned to service af ter any condition which could have produced a pressure or flow disturbance in that line, the open position of the excess flow check valve in that line shall be verified. Such conditions include:

Leakage at instrument fittings and valves Venting an unisolated instrument or instrument line Flushing or draining an instrument Installation of a new instrument or instrument line.

8604230244 860414 PDR ADOCK 05000219 P PDR

  • Amendment No. 14 2791f