Exemption from Requirements of 10CFR50,App J,Sections III.D.2 & III.D.3 Re Types B & C Local Leak Rate Testing for 65 Components Until Startup Following First Refueling Outage
ML20141G033
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/07/1986
From: Miraglia F
Office of Nuclear Reactor Regulation
To:
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20141G038 List:
References
NUDOCS 8604230258
Download: ML20141G033 (5)


Text

f=

l

{

I In the Matter of LOUISIANA POWER & LIGHT COMPANY Docket No. 50-382

)

(Waterford Steam Electric

)

Station Unit No. 3)

)

j EXEMPTION I.

Louisiana Power & Light (LP&L) Company (the licensee) holds Facility Operating License No. NPF-38, which authorizes operation of the Waterford ' steam Electric Station, Unit No. 3 (the facility) at core power levels not to exceed r

x of 3390 megawatts thermal. This license provides, among other things, that the facility is subject to all rules, regulations, and Orders of the fluclear Reg.ulatory Comission (the Commission) now or hereafter in effect.

The facility is a pressurized water reactor located at the licensee's site in St. Charles Parish, Louisiana.

io l

l II.

Appendix J of 10 CFR Part 50, Sections III.D.2 and III.D.3 require that Type B and C tests shall be performed during each reactor shutdown for refueling but in no case at intervals greater than two years.Section II.G of 10 CFR Part 50, Appendix J, defines " Type B Tests" as tests intended to measure leakage rates for certain defined containment penetrations.Section II.H of 10 CFR Part 50, Appendix J defines " Type C Tests" as tests intended to measure containment isolation valve leakage rates. These penetrations and valves help maintain containment integrity at design basis accident conditions.

I f

L4 I

8604230258 860407 ADOCK 0 % g 2 l

PDft

\\

e E

Ill.

By letter dated February 19, 1986, as supplen.ented by letter dated February 27, 1986, the licensee requested an exemption from the schedular requirements of 10 CFR Part 50, Appendix J Sections Ill.D.2. and 111.0.3.

Specifically, 65 components are due for Type B and C testing beginning April 22, 1986.

In order to test these 65 components, the plant must be in a cold shutdown condition. The licensee proposes to postpone leak testing of these components until the next scheduled refueling outage.

The previous Type 8 and C testing for Waterford 3 was completed April 22, 1984. Until receipt of the low-power operating license on December 18, 1984, the plant was in a cold shutdown condition.

in the summer of 1985, prior to completion uf the power ascension testing, Waterford 3 was in cold shutdown for approximately 2 months for turbine repairs.

The licensee has leak tested all valves consistent with personnel safety.

However, there are 65 components which require the plant to be in a cold shut-down condition before testing can be accomplished.

To require the plant to shut down solely to leak test these components by April 22, 1986, would cause an unnecessary thermal transient on the plant and result in unnecessary exposure to workers.

Waterford 3 is a new plant with little service life on its Type B and C components.

During the April 1984 leak rate tests, leakage paths were identified and necessary repairs were satisfactorily performed.

The local leakage rate tests conducted in 1984 showed that the actual leakage was less than 10% of the allowable limit which indicates that the valves were in good

condition. Based on these test results, the valves are predicted to remain within acceptable leakage limits throughout the time interval extension requested. Containment test requirements per Appendix J to 10 CFR 50 provide for preoperational tests and periodic verification by tests of the leak-tight integrity of the primary reactor containment and systems and components which penetrate containment. The purpose of the tests is to assure that (a) leakage through the primary reactor containment and systems and components penetrating primary containment shall not exceed allowable leakage rate values as specified in the technical specifications or associated bases and (b) periodic surveil-lance of reactor containment penetrations and isolation valves will be performied so that proper maintenance and repairs are made during the service life of the containment and systems and components penetrating primary containment.

The regulations specify a maximum of a two-year interval between T;pe B and C tests to define a general periodicity to satisify the above objestives.

Circumstances factored into the two-year interval include the assumation that a normal plant will be fully operational and hot for most of the time interval.

The licensee will meet the schedular requirement for all but a naximum of 65 components. However, for these 65 components, the short service life of the components and the local leakage rate tests conducted during April 1984, with the accompanying valve surveillance and maintenance as documented in the tests, provide sufficient evidence to conclude that with the few months delay in testing, (a) leakage through the components will not cyceed allowable values before the next test and (b) sufficient maintenance and repairs have been made over the service life of the components to insure their intearity until the next test. Thus, we conclude that the underlying purpose of the

rule, i.e., to require local leakage rate testing at periodic intervals of certain types of containment penetrations and isolation valves to determine whether there has been dcgradation in the leakage characteristics of these components which might adversely af fect containment integrity, will be satisfied even with the delay in testing.

Based on the above discussion, the licensee's proposed extension for the Type B and C testing of 65 components until startup af ter the first refueling outage (to begin in the first quarter of 1987), is acceptable.

This is a one-time only schedular exemption f rom the requirements of 10 CFR 50, Appendix J, Section !!!.D.2. and !!I.D.3.

Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12, this exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security.

The Cc=ission further detennines that special circumstances, as provided in 10 CFR 50.12(a)(?)(ii), are present justifying the exemption, namely that application of the regulation in this particular circumstance is not necessary to achieve the unchrlying purpose of the rule - to require local leak rate testing at periodic intervals of certain types of containment penetrations and isolation valves to determine whether there has been degradation in the lealage characteristics of these components which might adversely affect containment integrity.

Specificilly, as noted above, the short service life of the components, and the latest incal leakage rate test results which shnwed actual leakage less than 10% of the allowable limit, leads the staff to conclude that

requiring the plant to shut down solely to test the remaining valves by April 22, 1986, is not necessary to assure the continuing maintenance of containment integrity. Accordingly, the Comission hereby grants an exemption as described in Section III above from Sections III.D.2. and III.D.3. of Appendix J to 10 CFR Part 50 to the extent that the two-year interval for perfoming Type B and C tests on 65 components may be extended, on a one-time basis only, for Waterford 3 until the startup after the first refueling outage scheduled to begin in the first quarter of 1987.

Pursuant to 10 CFR 51.32, the Conmission has detemined that the granting of this Exemption will have rio significant impact on the environment (March 27,1986, 51 FR 10590 J.

This Exemption is effective upon issuance.

FOR THE fiUCLEAR REGULATORY COMMISSION

}

10

/ 214 Frank J. M ragli rector Division of PWR Licensing-B Dated at Bethesda, Maryland this 7th day of April, 1986.

-