Application for Amend to License DPR-16,consisting of Tech Spec Change Request 143,revising Excess Flow Check Valve Surveillance Requirements of Section 4.5.0.Fee Paid
ML20141F974
Person / Time
Site: Oyster Creek
Issue date: 04/14/1986
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20141F980 List:
References
NUDOCS 8604230241
Download: ML20141F974 (8)


Text

- _ _ _ _ _ _ . _ _ _

O +

GPU Nuclear gg1g{ 100 Interpace Parkmiy Parsippany. New Jersey 070a4 I 201 263 6500 TELEX 136-482 <

Writer's Direct Dial Number {

April 14, 1986 Director Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Technical Specification Change Request ho.143 Pursuant to 10CFR50.90, GPU Nuclear Corporation, operator of the Oyster Creek Nuclear Generating Station, Provisional Operating License No. OPR-16, requests a change to Appendix A of that license.

The subject Technical Specification Change Request would revise the excess j

flow check valve surveillance requirements of Section 4.5.0. This change will facilitate plant operation by removing technically unnecessary requirements and adding a new surveillance requirement for instrument line excess flow check valves.

This change request has been reviewed and approved by the Plant Review Group (PRG) and has received an Independent Safety Review (ISR) in accordance t.ito Section 6.5 of the Oyster Creek Nuclear Generating Station Technical Specifications.

We request that the license amendment be issued by August 1, 1986. We further request that the effective date for implementation be 60 days aft >r 'pproval and issuance of the license amendment in order to revise and approve the affected surveillance procedures. This desired schedule will allow the proposed changes to be implemented in time for operation in Cycle 11.

8604230241 860414 PDR ADOCK 05000219 d It P PDR Ve 00 MDI o onu ne.a, ,m na,i o.. o.-, < u m..a-m kg p

Pursuant to 10CFR50.91(b)(1), a copy of this change request has been sent to the State of New Jersey Department of Environmental Protection. In addition, pursuant to 10CFR170.12, a check for $300.00 is attached to cover the fee required for review of this application for license amendment and Technical Specification Change Request No.144 which will be submitted in the near future.

Very truly yours, LAA j}

P te hdFer Vice President and Director Oyster Creek i

PBF:gpa 2791f At t achtrent l cc: Dr. Thomas E. Murley, Administrator Reaion i

~

U. 5. Nuclear Regulatory Commission I 631 Park Avenue f King of Prussia, PA 19406 i Mr. Jack N. Sonohew, Jr., Project Manager U.S. Nuclear Regulatory Commission

{

7920 Norfolk Avenue l Phillips Building, Mail Stop #314 Bethesda, Maryland 20014 NRC Resident Inspector l Oyster Creek Nuclear Generating Station forked River, N. J. 08731

GPU NUCLEAR CORPORATION OYSTER CREEK NUCLEAR GENERATING STATION Provisional Operating License No. DPR-16 Technical Specification Change Request No. 143 Docket No. 50-219 Applicant submits by this Technical Specification Change Request No.143 to the Oyster Creek Nuclear Generating Station Technical Specifications, changes to Section 4.5.0.

By

  • IV I

Peter B.' Fiedler Vice President & Director Oyster Creek i

SwornandSubscribedtobefore'methis// day o t'  !- 1986.

[$stA) h. l)K{dt A hotary Public of N. J.

i DIAN4 A. Af ALI)fT l

A N*an 1%lita .f,New J,,g g) L'aunnuun Lapire, J,ne 3, g9g o

i

./ ~ ._

a #  ?

fg 5* .e . . >

3

' 'd,a

~

^

UNITED STATES OF AMERICA -

7 NUCLEAR REGULATORY COMISSION f 4

3.

i ,

In the matter of ) Docket No. 50-219 GPU Nuclear Corporation ) ,

a.

/ . > -

CERTIFICA1E OF SERVICE s

This is to certifyjthat a copy of Technical Specification Change Requet.t No.

143 for Oystar Creek Nucicar Generating Station Technical Specifications filed with the U.S. Nuclear Rc9ulatory Commission on ' April 14, 1986 has this day ofl April 14,-1986 , been served on the~ Mayor of Lacey Township, Ocean County, New Jersey by deposit in the United States. mail, addressed as follows:

~.

The honorable, Christopher Connor Mayor of Lacey Township /

" 818 West Lacey Road

, Forked River, N. J. 08731 s

By ^: 'J '

,' Peter B. 51edler Vice President & Director '

Oyster Creek i

, ..N'

, ,l -

E a l

e

OPU Nuclear 5 gj (UClear 'oo'"""-""

  • Parsippany New Jersey 0705 2 201 263-6500 TELEX 136-482 Writer's Duect Det Number April 14, 1986 l'

The Honorable Christopher Connor Mayor of Lacey Township 818 West Lacey Road Forked River, New Jersey 08731

Dear Mayor Connor:

)

Enclosed herewith is one copy of Technical Specification Change Request No.

143 for the Oyster Creek huclear Generating Station Operating License.

This document was filed with the United States Nuclear Regulatory Commission on April 14,1986 .

Very truly yours, A4n A ti V r:_ . f3 Peter b. Tiedler Vice President & Director Oyster Creek GPU Nuclear is a part of the General Pubhc Utihties System

3 .

<. 3 .

t OYSTER CREEK NUCLEAR GENERATING STATION Provisional Operating License No. DPR-16 Docket No. 50-219 Technical Specification Change Request No. 143 Applicant hereby requests the Commission to change Appendix A to the above captioned license as follows, and, pursuant to 10CFR50.91, an analysis concerning significant hazards considerations is provided:

1. Section to be changed 4.5.0
2. Extent of change Change section 4.5.0 to revise the surveillance requirements for excess flow check valves in instrument lines penetrating containment as below:

Delete: Venting an instrument or instrument line.

Isolating an instrument.

Add: Venting an unisolated instrument or instrument line.

Installetion vi e new instrunient or instrument line.

. 3. Change reouested Replace page 4.5-6 of Section 4.5.0 with attached changed page 4.5-6.

4. Discussion The proposed change to Technical Specifications will modify Section 4.5 Paragraph 'O' surveillance requirements for excess flow check valves (EFCV) in instrument lines penetrating containment.

The purpose of this change request is to revise the open position verification requirements for the EFCVs after an instrument or instrument line is tested, calibrated or vented.

l The following changes are proposed to the conditions for excess flow check I valve open position verification.

Delete Venting an instrument or instrument line.

Isolating an instrument.

Add Venting an unisolated instrument or instrument line.

Installation of a new instrument or instrument line.

r-t s

The precedures employed in isolating an instrument for testing or calibration does not produce flow disturbances. The instrument is first isolated by closing the isolation valves and returned to service still filled with process fluid before the isolation valves are cracked open.

Similarly, venting an isolated instrument or instrument line does not create a significant flow disturbance as the valves are slightly cracked open to vent air and then closed.

It is proven by surveillance and established by design that it requires approximately 2 gpm flow to close an EFCV. It is concluded that isolating and subsequently unisolating an instrument or instrument line and venting an isolated instrument or instrument line will not cause enough flow to close the EFCV.

The once per cycle requirement for an isolation test (EFCV functional test) is also performed, which includes a subsequent open position verification test and is adequate to ensure correct positioning and valve operability.

Considering the above, the surveillance requirements for EFCV open position varf ficatien is not required each time an instrument or instrument line is isolated. This change will reduce survetilance time, improve plant availability and reduce radiation exposure to personnel.

Venting an unisolated instrument or instrument line may create a flow disturbance. Putting a new instrument or instrument line in service may also create a flow disturbance since, initially, the inlet line will not be filled with process fluid. Therefore, the excess flow check valve will require open position verification for these conditions and these conditions will be added to the Technical Specifications.

This change will not affect the safety of the plant, since no system design, configuration or hardware change will be made. This change will not increase the potential for radioactive discharge to the atmosphere, since closing of the EFCV in case of high flow (approximately 2gpm) will prevent discharge of fluid.

5. Detemination We have determined that this change request involves no significant hazards considerations in that operation of the Oyster Creek plant in accordance with the proposed amendment will not:
1. Involve a significant increase in the probability or consequences of any accident previously evaluated as surveillance experience and practice indicates sufficient flow cannot be achieved, by isolating an instrument / instrument line or venting an isolated instrument / instrument line, to close an EFCV; or

t

s. .
2. Create the probability of a new or different kind of accident from any accident previously evaluated since this request involves no system design, configuration or hardware change; or
3. Involve a significant reduction in margin of safety because remaining surveillance requirements are adequate to ensure EFCV operability and correct positioning.

In addition, the proposed change remains compatible with, and in some respects more restrictive than, the BWR Standard Technical Specifications, NUREG 0123, Revision 3.

e