Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141C164 + (ML20141C164)
- ML20141C168 + (ML20141C168)
- ML20141C170 + (ML20141C170)
- ML20141C173 + (ML20141C173)
- ML20141C175 + (ML20141C175)
- ML20141C177 + (ML20141C177)
- IA-97-201, Final Response to FOIA for Documents.Forwards Documents Listed in App A.Documents Completely Withheld (Ref FOIA Exemption 7) + (ML20141C177)
- ML20141C180 + (ML20141C180)
- ML20141C182 + (ML20141C182)
- ML20141C190 + (ML20141C190)
- IA-97-144, Final Response to FOIA Request for Documents.Records in App B Available in Pdr.Forwards Records in App a & C Being Made Available in PDR + (ML20141C190)
- ML20141C196 + (ML20141C196)
- ML20141C197 + (ML20141C197)
- 05000338/LER-1997-004-01, :on 970524,found Hi-Hi Alarm Setpoint for 1-RM-RMS-160 Out of Tolerance Due to Personnel Error. Instrumentation & Control Supervisor Coached Dept Personnel on Importance of Self Check + (ML20141C199)
- U-602745, Monthly Operating Rept for Apr 1997 for Clinton Power Station Unit 1 + (ML20141C200)
- ML20141C204 + (ML20141C204)
- 05000362/LER-1997-001-02, :on 970412,four Out of Five RCS Nozzles Leaked During Plant Operation & Fifth Suspected of Leaking.Caused by Crack Through Nozzle in Heat Affected Zone of Partial Penetration Weld.Completed Required Welding + (ML20141C205)
- ML20141C208 + (ML20141C208)
- 05000155/LER-1997-004, :on 970410,determined Potential Loss of DC Power for Primary Containment Spray & Liquid Poison Systems. Caused by Inadequate Design Control Program.Removed & Replaced Breaker 72-12 + (ML20141C210)
- ML20141C214 + (ML20141C214)
- ML20141C217 + (ML20141C217)
- ML20141C218 + (ML20141C218)
- ML20141C221 + (ML20141C221)
- ML20141C222 + (ML20141C222)
- ML20141C223 + (ML20141C223)
- ML20141C226 + (ML20141C226)
- ML20141C228 + (ML20141C228)
- ML20141C231 + (ML20141C231)
- ML20141C235 + (ML20141C235)
- ML20141C238 + (ML20141C238)
- ML20141C240 + (ML20141C240)
- ML20141C241 + (ML20141C241)
- 05000313/LER-1996-002, :on 970519,surveillance Tests Required by TS Were Incomplete Because All Combinations of Contacts Not Tested Due to Procedure Deficiencies.Verified Operability of RPS + (ML20141C245)
- ML20141C246 + (ML20141C246)
- ML20141C247 + (ML20141C247)
- NSD-NRC-97-5174, Forwards Responses to 970514 RAI Re Containment Systems & Severe Accident Branch Relating to AP600 Initial Test Program + (ML20141C250)
- ML20141C251 + (ML20141C251)
- ML20141C253 + (ML20141C253)
- ML20141C256 + (ML20141C256)
- ML20141C260 + (ML20141C260)
- NSD-NRC-97-5178, Forwards W Responses to RAI Re AP600 Subcompartment Pressurization Analysis & Containment External Pressure Analysis.Response Numbers,Listed + (ML20141C262)
- 05000266/LER-1997-026, :on 970521,discovered TS Violation of Operability Requirement of MSL Isolation.Caused by Inadequate Consideration for Operability of All Required Functions.Verified Low RCS Sys Average Temp + (ML20141C266)
- ML20141C267 + (ML20141C267)
- ML20141C268 + (ML20141C268)
- ML20141C270 + (ML20141C270)
- ML20141C271 + (ML20141C271)
- ML20141C274 + (ML20141C274)
- ML20141C275 + (ML20141C275)
- ML20141C278 + (ML20141C278)
- BVY-97-059, Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station + (ML20141C279)
- NSD-NRC-97-5169, Discusses Comparison of Methodolody Included in Spr 6.2.5 App a Used in Calculation & Results Compared to Results Using AP600 Model + (ML20141C282)