ML20141C251
| ML20141C251 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 04/01/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20141C256 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8604070216 | |
| Download: ML20141C251 (2) | |
See also: IR 05000458/1986001
Text
r
i
APR I
19lE
In Reply Refer To:
Docket:
50-458/86-01
Gulf States Utilities
ATTN: William J. Cahill, Jr.
Senior Vice President
River Bend Nuclear Group
P.O. Box 2951
Beaumont, Texas 77704
Gentlemen:
This refers to the inspection conducted by Mr. H. D. Chaney of this office
during the period January 27-31, 1986, of the activities authorized by NRC
Operating License NPF-40 for the River Bend Station, and to the discussion of
our findings with you and other members of your staff at the ccnclusion of the
inspection.
Areas examined during the inspection included portions of the radiation
protection program. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with personnel,
and observations by the inspector.
These findings are documented in the
enclosed inspection report.
During this inspection, it was found that certain of your activities were in
,
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice,"Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
During this inspection, it was also found that certain of your activities
appeared to deviate from a commitment made to th= NRC.
This item and reference
to the commitment is identified in the enclosed Notice of Deviation.
You are
requested to respond to this deviar, ion in writing.
Your response should be
based on the specifics contained in the Notice of Deviation enclosed with this
letter.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the the enclosed ;nspection report.
The response directed by this letter and the accompanying Notices is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
h ,l
!?..
F
Jr
RIV:FRPS
C:FRPS['
D:[
C:kP5/A
C:RPB J
HDChaney/tw
Jfiurray
RLI abgart
JdJaijdon
JEGagli/ido
i
/
86
Y)/**Q/86
oyf)/86
p{y86
5 /) / /,56
B604070216 860401
ADOCK 05000458
G
Y(#
4i
'
.
.
.-
.
-
..
_-
-
.
.
Gulf States Utilities
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By
J. E. Gagliardo
J. E. Gagliardo, Chief
Reactor Project Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - Notice of Deviation
3.
Appendix C - NRC Inspection Report
50-458/86-01
cc w/ enclosures:
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
Engineering, Nuclear
Fuels & Licensing
P. O. Box 2951
Beaumont, Texas 77704
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
bcc to DMB (IE06)
bec distrib..by RIV:
- RPB
DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015)
- MIS System
- RSB
- RSTS Operator
- D.
Chaney
- R&SPB
- B. Murray
- RIV File
R. L. Bangart
- w/766
j