U-602745, Monthly Operating Rept for Apr 1997 for Clinton Power Station Unit 1

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1997 for Clinton Power Station Unit 1
ML20141C200
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/30/1997
From: Demark W, Phares R
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
U-602745, NUDOCS 9705160197
Download: ML20141C200 (5)


Text

. ~ . . . - - -

9 e , . **

^

e

% , e lilinois Power Company Clinton Power Stahon P.O. Box 678 Clinton. IL 61727 Tel 217 935-8881 PGWER U-602745-8E.100c j May 10, 1997 1

10CFR50.36 l

Docket No. 50-461 j U.S. Nuclear Regulatory Commission

' Document Control Desk Washington, D.C. 20555 l

Subject:

Clinton Power Station, Unit 1 Facility Operating License NPF-62 April 1997 Monthlv Operatina Report

Dear Madam or Sir:

Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending April 30, 1997. ,

[

Sincerely yours, A Y/ '

/u w D Richard F. Phares I

Assistant to the Vice President WED/ pay l

Attachments 160047 cc: NRC Region III Regional Administrator i NRC Resident Office, V-690 I Illinois Department of Nuclear Safety 9705160197 970430

  • 6 1

i i PDR ADOCK 05000461 R PDR

i.

- . Attachment 1 U-602745

  • Page 1 of 4 l

l CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month April 1997 NONE I

1 l

i t

,, . Attachment 1

,, U-603745 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 _

UNIT Clinton 1 DATE 4/30/97 COMPLETED BY W. E. DeMark TELEPHONE (217) 93 5-8881 X3 537 MONTH Aoril 1997 C

1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 , 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 1

15 0 16 0 J

\

l l

l l l

l

, , Attachment 1 l U-602745

-

  • i

. Page 3 of 4 l

l OPERATING DATA REPORT l

i DOCKET NO. 50-461  !

UNIT Clinton 1 DATE 4/30/97 ,

COMPLETED BY W. E. DeMark TELEPHONE (217) 935-8881 X3537 OPERATING STATUS

1. REPORTING PERIOD: April 1997 GROSS !!OURS IN REPORT PERIOD: 719
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) : 2894 MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 930 DESIGN ELECTRICAL RATING (MWe-Net): 933
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY) : N/A HIIS FDmt YR 'IO DATE LU4XATIVE
5. NLM1ER OF 100RS REACIOR HAS CRITICAL. . . . . . O.0 0.0 58,883.8 _ >
6. REACIOR RESERVE SHUIDOWN 100RS. . . . ... ... O.0 0.0 0.0
7. 100RS GE2 ERA'IOR CN LINE. . . . . . . ......... O.0 0.0 57,401,9
8. LNIT RESERVE SHUIDOWN 100RS . . . . . . . . . . . . . 0.0 0.0 4.0
9. GROSS 'IHERMAL ENERGY GENERATED (FMI) . . . . . . . 0 0.0 154,700,590
10. GROSS ELECTRICAL ENERGY GENERATED (FMI) . . . . . 0 0.0 51,120,966
11. NET ELECIRICAL DERGY GE2ERATED (fWI) . . . . . . 0 0 48,697,141
12. REACIOR SERVICE FACIOR. . . . . . . . . . . . . . . . . . 0.0% 0.0% 71.2%
13. REACIOR AVAIIABILITY FACIOR. . . . . . . . .. .. O.0% 0.0% 71.2%
14. INIT SERVICE FACIOR. . . . . ........ .. .. 0.0% 0.0% 69.4%
15. LNIT AVAIIABILITY FACIOR. . . . . . . . . ..... . O.0% 0.0% 69.4%
16. INIT CAPACITY FACIOR (Using MDC) . . . . . . . . . . 0.0% 0.0% 63.3%
17. LNIT CAPACITY FACIOR (Using Design MWe, . . . 0.0% 0.0% 63.1%
18. INIT FORCED CXKAGE RATE. . . . . . . . . ...... 0.0% 0.0% 9.1%
19. SHUIDOWNS SOEDULED OVER NEXT SIX POmfS (TYPE, DATE, DURATICH OF EACH) :

None

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

l The unit will remain shutdown until the completion of Refueling Outage 6 (RF-6); expected restart dated is May 30, 1997.

a O

Attachment 1 ,-

U-602745

  • Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461 UNIT Clinton 1 DATE 4/30/97 COMPLETED BY W. E. DeMark REPORT MONTH April 1997 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) ACTIONS /COEIENTS RF-6 10/13/96 S 719.0 C. Refueling Outage The unit remains in refueling outage.

(1) Reason A- Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction, E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)

H - Other (explain)

(2) Method 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _