ML20141C278

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/86-02 on 860106-10 & Notice of Violation
ML20141C278
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/01/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Walker R
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20141C283 List:
References
NUDOCS 8604070220
Download: ML20141C278 (2)


See also: IR 05000267/1986002

Text

r-

,

,,

'

In Reply Refer To:

Docket: 50-267/86-02

Public Service Company of Colorado

ATTN:

R. F. Walker, President

P. O. Box 840

Denver, Colorado 80201-0840

Gentlemen.

This-refers to the inspection conducted by Mr. R. E. Baer of. this office during

the period January 6-10, 1986, of activities authorized by NRC Operating

License DPR-34 for Fort St. Vrain Nuclear Generating Station, and to the discus-

sion of our findings with Mr. J. W. Gahm, and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included functional areas under the

Radiation Protection Program. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspector.

These findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of Viola-

tion enclosed with this letter.

The response directed by this letter and tne accompanying Notice is not subject

to the clearance procedures of the Of fice of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

Orir;inal S't;ned D/

J. E. Gagliardo

J. E. Gagliardo, Chief,

Reactor Proj cts Branch

,

Enclosures:

(see next page)

Jj

f

q

a

RIV:FRPS

C:FRPS

0:['$$

C:RPj#

C:RPB /

REBaer/tw

BMurray

RLEi . Art

JPJaud n

JGagli p

o

'

/p/86

1) / /86

$/y '/86

6

J /3) 84

8604070220 ed,040

g

PDR

ADOCM 05000

7

$D

G

P

4i

r

';:

..

Public Service-Company of Colorado

-2-

Enclosures:

1.

Appendix'A - Notice of Violation

2.

' Appendix B - NRC Inspection Report

50-267/86-02

cc w/ enclosures:

J. W. Gahm, Manager, Nuclear

Production Division

Fort St. Vrain Nuclear Station

16805 WCR 19\\

Platteville, Colorado 80651

L.' Singleton, Manager, Quality

Assurance Division

(same address)

Colorado Radiation Control Program Director

bcc to DMB (IE06)

bec distrib. by RIV:

  • RPB'

DRSP

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB/A)
  • RSB
  • Section Chief (RSB/ES)-
  • R. E. Baer
  • R&SPB
  • B. Murray
  • MIS System

R. L. Bangart

  • RSTS Operator
  • RIV File
  • w/766

(l

V

.

J