ML20141C278
| ML20141C278 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 04/01/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Walker R PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20141C283 | List: |
| References | |
| NUDOCS 8604070220 | |
| Download: ML20141C278 (2) | |
See also: IR 05000267/1986002
Text
r-
,
,,
'
In Reply Refer To:
Docket: 50-267/86-02
Public Service Company of Colorado
ATTN:
R. F. Walker, President
P. O. Box 840
Denver, Colorado 80201-0840
Gentlemen.
This-refers to the inspection conducted by Mr. R. E. Baer of. this office during
the period January 6-10, 1986, of activities authorized by NRC Operating
License DPR-34 for Fort St. Vrain Nuclear Generating Station, and to the discus-
sion of our findings with Mr. J. W. Gahm, and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included functional areas under the
Radiation Protection Program. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspector.
These findings are documented in
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of Viola-
tion enclosed with this letter.
The response directed by this letter and tne accompanying Notice is not subject
to the clearance procedures of the Of fice of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
Orir;inal S't;ned D/
J. E. Gagliardo
J. E. Gagliardo, Chief,
Reactor Proj cts Branch
,
Enclosures:
(see next page)
Jj
f
q
a
RIV:FRPS
C:FRPS
0:['$$
C:RPj#
C:RPB /
REBaer/tw
BMurray
RLEi . Art
JPJaud n
JGagli p
o
'
/p/86
1) / /86
$/y '/86
6
J /3) 84
8604070220 ed,040
g
ADOCM 05000
7
$D
G
P
4i
r
';:
..
Public Service-Company of Colorado
-2-
Enclosures:
1.
Appendix'A - Notice of Violation
2.
' Appendix B - NRC Inspection Report
50-267/86-02
cc w/ enclosures:
J. W. Gahm, Manager, Nuclear
Production Division
Fort St. Vrain Nuclear Station
16805 WCR 19\\
Platteville, Colorado 80651
L.' Singleton, Manager, Quality
Assurance Division
(same address)
Colorado Radiation Control Program Director
bcc to DMB (IE06)
bec distrib. by RIV:
- RPB'
DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- RSB
- Section Chief (RSB/ES)-
- R. E. Baer
- R&SPB
- B. Murray
- MIS System
R. L. Bangart
- RSTS Operator
- RIV File
- w/766
(l
V
.
J