Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140E355 + (ML20140E355)
- ML20140E356 + (ML20140E356)
- ML20140E357 + (ML20140E357)
- ML20140E358 + (ML20140E358)
- ML20140E359 + (ML20140E359)
- ML20140E361 + (ML20140E361)
- ML20140E362 + (ML20140E362)
- ML20140E364 + (ML20140E364)
- ML20140E365 + (ML20140E365)
- NPL-97-0181, Annual Monitoring Rept for Jan-Dec 1996 + (ML20140E366)
- ML20140E368 + (ML20140E368)
- ML20140E369 + (ML20140E369)
- ML20140E370 + (ML20140E370)
- ML20140E371 + (ML20140E371)
- ML20140E372 + (ML20140E372)
- ML20140E373 + (ML20140E373)
- ML20140E374 + (ML20140E374)
- ML20140E375 + (ML20140E375)
- ML20140E376 + (ML20140E376)
- ML20140E377 + (ML20140E377)
- ML20140E378 + (ML20140E378)
- ML20140E379 + (ML20140E379)
- ML20140E380 + (ML20140E380)
- ML20140E381 + (ML20140E381)
- ML20140E382 + (ML20140E382)
- ML20140E383 + (ML20140E383)
- ML20140E385 + (ML20140E385)
- 05000338/LER-1984-024-01, :on 841206,QA Audit Identified Five Periodic Tests Not Performed within Required Surveillance Intervals. Caused by Communication Breakdown Between Depts.Process to Track Overdue Tests Being Reviewed + (ML20140E386)
- ML20140E387 + (ML20140E387)
- ML20140E388 + (ML20140E388)
- ML20140E389 + (ML20140E389)
- 05000339/LER-1984-013-03, :on 841207 & 09,emergency Diesel Generators 2J & 2H Tripped,Respectively.Facility Shut Down.Cause Not Stated.Maint Performed.Both Emergency Diesel Generators Restored to Operable Status + (ML20140E391)
- ML20140E392 + (ML20140E392)
- 05000409/LER-1984-023, :on 841207,inner Door Upper & Lower Handwheel Shaft Mechanical Seals of Personnel Airlock Leaked Air in Excess of Acceptance Criteria.Both Inner Door Handwheel Shaft Seals Replaced + (ML20140E394)
- 05000483/LER-1984-062, :on 841207,inadvertent ESF Actuation Resulted in Containment Purge Isolation Signal & Control Room Ventilation Isolation Signal.Caused by Blown Fuse.Fuse Replaced + (ML20140E396)
- ML20140E397 + (ML20140E397)
- B11904, Forwards Descriptions of Procedures for Insps of Water Control Structures & Methods of Addressing NRC Concerns Re SEP Topic III-3.C, Inservice Insp of Water Control Structures & Isap Topic 1.29, Flooding Evaluation + (ML20140E398)
- ML20140E399 + (ML20140E399)
- ML20140E400 + (ML20140E400)
- ML20140E402 + (ML20140E402)
- ML20140E403 + (ML20140E403)
- ML20140E404 + (ML20140E404)
- ML20140E405 + (ML20140E405)
- ML20140E406 + (ML20140E406)
- 05000334/LER-1984-006-01, :on 840621,test Methods Used on 120-volt Dc Station Batteries Determined Inadequate.Cause Not Stated. Station Batteries Replaced.New Battery Duty Curves & Test Procedures Developed + (ML20140E407)
- ML20140E408 + (ML20140E408)
- ML20140E409 + (ML20140E409)
- ML20140E410 + (ML20140E410)
- 1CAN128410, Ack Receipt of NRC 841120 Request for Addl Info Re Second 10-yr Inservice Insp Program.Due to Current Refueling Outage Activities & Mail Delays,Response Delayed Until 850131 + (ML20140E411)
- ML20140E412 + (ML20140E412)
- B11313, Submits Addl Justification or Clarification for 10 Open Items from SER for SEP Topic III-5.A, High Energy Pipe Break Inside Containment, Per Section 4.8 of NUREG-0826, Integrated Plant Safety Assessment,Haddam Neck Plant + (ML20140E413)