ML20140E400

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept (55(e)-84-53) Re Control of Spare/Replacement Parts.Initially Reported on 841120. Investigation Continuing.Next Rept Will Be Submitted by 850731
ML20140E400
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/20/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(55(E)-84-53), (NMP2L-0303), (NMP2L-303), NUDOCS 8501100810
Download: ML20140E400 (2)


Text

e NUMOHAWK Y NIAGARA NIAGARA MOHAWK POWER CORPORATION /300 ER;E BOULEVARD WEST, SYRACUSE. N Y.13202/ TELEPHONE (315) 474-1511 December 20, 1984 (NMP2L 0303)

Mr. R. W. Starostecki, Director U. S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is an interim report in accordance with 10CFR50.55(e) for the problem concerning the control of spare / replacement parts.

This problem was reported via tel-con to W. Lazarus of your staff on November 20, 1984 Very truly yours, h%4 /h C. V. Mangan Vice President Nuclear Engineering and Licensing CMi/GG:csb

( 0614H) xc: -Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Gram, NRC Resident Inspector Project File (2) s 8501100810 841220 PDR ADOCK 05000410 S

PDR

'hl IC a)

NIAGARA M)HMK POWER CORPORATION -

NINE MILE POINT - UNIT 2 '

DOCKET NO. 50-410 Interim Report for a Problem Concerning Control of Spare / Replacement Parts (55(e )-84-53)

Description of the Problem An inspection by the Insti tute of hel ear Power Operations identified a concern regarding the control of spare / replacement parts at Nine Mile Point -

Unit 2.

The concern may be classified into the following categories:

1.

Control of parts / documentation after issuance from the warehouse 2.

Control of parts with expired shelf life 3.

Identiff cation of part 4.

Segregation of parts with different Quality Assurance Categories The matter is still under investigation, and a final report will be submitted by July 31, 1985.

L