Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138L801 + (ML20138L801)
- ML20138L802 + (ML20138L802)
- ML20138L803 + (ML20138L803)
- 1CAN029703, Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 1 + (ML20138L806)
- ML20138L807 + (ML20138L807)
- ML20138L808 + (ML20138L808)
- 05000461/LER-1996-012, :on 910316,failed to Demonstrate Operability of Offsite Power Sources within One Hr During Surveillance While Div 3 EDG Governor Speed Droop Control Set to 50% Due to Inadequate Procedures.Revised Procedures + (ML20138L809)
- ML20138L811 + (ML20138L811)
- 2CAN029708, Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 2 + (ML20138L812)
- ML20138L814 + (ML20138L814)
- ML20138L815 + (ML20138L815)
- PNO-II-85-118, on 851212,oil Spilled Into Tennessee River When Site Glass Failed on Traveling Screen Gear Box on Cold Water Pump.Immediate Cleanup Action Initiated.All Units Shut Down While Environ Activities Conducted + (ML20138L817)
- ML20138L818 + (ML20138L818)
- IR 05000326/2009009 + (ML20138L820)
- ML20138L821 + (ML20138L821)
- ML20138L823 + (ML20138L823)
- ML20138L826 + (ML20138L826)
- BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2 + (ML20138L829)
- ML20138L830 + (ML20138L830)
- B16241, Monthly Operating Rept for Jan 1997 for Millstone Nuclear Power Station Unit 2 + (ML20138L831)
- ML20138L832 + (ML20138L832)
- ML20138L833 + (ML20138L833)
- B16248, Monthly Operating Rept for Jan 1997 for Millstone Nuclear Power Station Unit 1 + (ML20138L836)
- HBL-85-059, Forwards Rev 1 to Humboldt Bay Power Plant Unit 3 - Safstor QA Plan, Replacing Attachment 4 of 840731 Decommissioning Plan.Basis for & Description of Approach Included + (ML20138L837)
- LIC-97-0010, Forwards Response to Violations Noted in Insp Rept 50-285/96-07.Corrective Actions:Immediately After Security Insp in Aug of 1996,audit of Active Badging Records Was Conducted by Util Security Dept + (ML20138L838)
- ML20138L840 + (ML20138L840)
- ML20138L843 + (ML20138L843)
- ML20138L845 + (ML20138L845)
- ML20138L846 + (ML20138L846)
- ML20138L848 + (ML20138L848)
- ML20138L849 + (ML20138L849)
- ML20138L850 + (ML20138L850)
- PNO-III-97-009, on 970221,contaminated Scrap Metal Occurred. Licensee Also Indicated Addl Scrap Metal Located at Il Railroad Supply Co in Cordova,Il.Nrc Inspectors Monitored Licensee Activities Surrounding Incident + (ML20138L852)
- ML20138L854 + (ML20138L854)
- ML20138L855 + (ML20138L855)
- ML20138L856 + (ML20138L856)
- ML20138L858 + (ML20138L858)
- RBG-22-341, Ro:On 851012,fire Occurred at Fancy Point 500 Kv Switchyard. Caused by Apparent Lightning Strike.Fire Extinguished. Damaged Equipment to Be Replaced.Investigation & Evaluation of Emergency Plan Ongoing + (ML20138L862)
- ML20138L864 + (ML20138L864)
- ML20138L869 + (ML20138L869)
- ML20138L874 + (ML20138L874)
- ML20138L878 + (ML20138L878)
- ML20138L884 + (ML20138L884)
- ML20138L885 + (ML20138L885)
- ML20138L888 + (ML20138L888)
- ML20138L889 + (ML20138L889)
- ML20138L892 + (ML20138L892)
- ST-HL-AE-1532, Forwards Response to Draft SER Open Item D 2.4-5 Re Section 2.4.14 on Flood Protection + (ML20138L894)
- ML20138L895 + (ML20138L895)
- ML20138L896 + (ML20138L896)
- ML20138L897 + (ML20138L897)