Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138B436 + (ML20138B436)
- ML20138B437 + (ML20138B437)
- ML20138B439 + (ML20138B439)
- ML20138B442 + (ML20138B442)
- ML20138B446 + (ML20138B446)
- ML20138B447 + (ML20138B447)
- ML20138B449 + (ML20138B449)
- ML20138B450 + (ML20138B450)
- ML20138B452 + (ML20138B452)
- ML20138B454 + (ML20138B454)
- ML20138B456 + (ML20138B456)
- ML20138B457 + (ML20138B457)
- ML20138B463 + (ML20138B463)
- ML20138B464 + (ML20138B464)
- ML20138B467 + (ML20138B467)
- ML20138B470 + (ML20138B470)
- ML20138B474 + (ML20138B474)
- B11686, Application for Amend to License DPR-21,revising Tech Specs to Consolidate Specs 3.5.F.7 & 3.5.F.8 Into One Spec,To Clarify Water Level Requirements for Refuel Cavity & Modify Lpci/Core Spray Requirements.Fee Paid + (ML20138B475)
- ML20138B477 + (ML20138B477)
- B12016, Provides Addl Info Re Mortar Cracks Identified During 851029 Site Walkdown,Per Response to Request for Info on IE Bulletin 80-11 Concerning Masonry Wall Design.Mortar Joint Cracks Will Be Chipped Out + (ML20138B477)
- ML20138B479 + (ML20138B479)
- IR 05000317/1985017 + (ML20138B480)
- ML20138B481 + (ML20138B481)
- ML20138B482 + (ML20138B482)
- ML20138B485 + (ML20138B485)
- ML20138B486 + (ML20138B486)
- ML20138B487 + (ML20138B487)
- ML20138B489 + (ML20138B489)
- SNRC-1205, Outlines Scheduling Plan for Compliance to Final Rule 10CFR50.62 on Atws.Schedule Includes Work on Recirculation Pump Trip,Alternate Rod Insertion & Standby Liquid Control Sys + (ML20138B491)
- ML20138B492 + (ML20138B492)
- ML20138B494 + (ML20138B494)
- ML20138B496 + (ML20138B496)
- ML20138B497 + (ML20138B497)
- ML20138B498 + (ML20138B498)
- ML20138B500 + (ML20138B500)
- ML20138B501 + (ML20138B501)
- ML20138B505 + (ML20138B505)
- ML20138B508 + (ML20138B508)
- ML20138B512 + (ML20138B512)
- ML20138B513 + (ML20138B513)
- PNO-III-86-028, on 860318,OL Issued.License Limited to Fuel Loading & Operation Up to 5% Power.Fuel Loading Will Take About 2 Wks to Complete + (ML20138B515)
- ML20138B516 + (ML20138B516)
- ML20138B518 + (ML20138B518)
- IR 05000280/1986006 + (ML20138B519)
- IR 05000070/1985001 + (ML20138B520)
- ML20138B522 + (ML20138B522)
- IR 05000302/1985033 + (ML20138B526)
- ML20138B528 + (ML20138B528)
- ML20138B529 + (ML20138B529)
- ML20138B531 + (ML20138B531)
- B12003, Requests Extension to 860326 to Provide Info Requested in Re Response to Generic Ltr 84-04 & SEP Topic III-06 + (ML20138B532)