Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-IV-97-021A, on 970422,extraction Steam Line Break Update Made.Licensee Anticipates Asbestos Removal by First Wk in May.Multidiscipline Investigation Team W/Several Industry Representative Being Assembled by Licensee + (ML20138A108)
- 05000528/LER-1985-068, Corrected LER 85-068-00:on 851020,discovered That Four Valves Not Tested within Required Quarterly Surveillance Interval by 851018.Caused by Ineffective Communication Between Nonlicensed Personnel + (ML20138A109)
- PNO-III-86-018, on 860307,reactor Automatically Tripped While in Process of Shutting Down for Scheduled 5-wk Maint & Refueling Outage.Caused When One Rod Failed to Fully Insert. Rod Manually Inserted.Breaker B Replaced + (ML20138A114)
- ML20138A116 + (ML20138A116)
- ML20138A120 + (ML20138A120)
- ML20138A122 + (ML20138A122)
- ML20138A124 + (ML20138A124)
- ML20138A128 + (ML20138A128)
- ML20138A129 + (ML20138A129)
- ST-HL-AE-1373, Provides Addl Info Re Risk Mgt Program to Evaluate Design Changes in Form of Modified Preliminary Scoping Study,Per 850819 Commitment.Positive Displacement Charging Pump Incorporated in Program + (ML20138A130)
- ML20138A132 + (ML20138A132)
- ML20138A133 + (ML20138A133)
- ML20138A134 + (ML20138A134)
- B11672, Forwards Revised Response to SER (NUREG-1031) Question 480.37 Re Asymmetric Pressure Loadings on Structures & Components Due to Postulated Pipe Ruptures,Including Results of Evaluation of Asymmetric Loadings on Pressurizer + (ML20138A136)
- ML20138A138 + (ML20138A138)
- ML20138A140 + (ML20138A140)
- B11716, Forwards Reviews of Integrated Safety Assessment Program, Topics 2.17,2.21 & 2.24 Re Ventilation Duct Chase Plant Distribution Protection,Load Ctr Replacement of Oil Filled Breakers & Offsite Power Sys,Respectively + (ML20138A142)
- ML20138A143 + (ML20138A143)
- ML20138A145 + (ML20138A145)
- ML20138A146 + (ML20138A146)
- ML20138A147 + (ML20138A147)
- ML20138A149 + (ML20138A149)
- 05000331/LER-1985-044, :on 851105,RCIC Taken Out of Svc to Modify RCIC-to-vessel Inject Valve Circuitry.Repair Completed.On 851107,RCIC Tripped on Electrical Overspeed.Caused by Setpoint Drift on Overspeed Trip Monitor + (ML20138A150)
- 05000295/LER-1997-008, :on 970321,air Filters Containing Al Were Inadvertently Installed in Containment Due to Faulty Parts Selection Process.Hepa Filters Containing Al Will Be Removed or Replaced w/non-Al Containing Filters + (ML20138A151)
- ML20138A152 + (ML20138A152)
- ML20138A153 + (ML20138A153)
- ML20138A155 + (ML20138A155)
- ML20138A156 + (ML20138A156)
- ML20138A157 + (ML20138A157)
- ML20138A159 + (ML20138A159)
- ML20138A160 + (ML20138A160)
- 05000414/LER-1997-003-01, :on 970217,component Cooling Sys Unavailability Was Caused by Failure of Breaker Charging Springs Motor Coils When Breaker Was Closed on 970125.Failed Breaker Was Replaced W/Refurbished Spare Breaker + (ML20138A162)
- ML20138A163 + (ML20138A163)
- ML20138A164 + (ML20138A164)
- ML20138A167 + (ML20138A167)
- ML20138A168 + (ML20138A168)
- ML20138A171 + (ML20138A171)
- ML20138A173 + (ML20138A173)
- ML20138A174 + (ML20138A174)
- NSD-NRC-97-5077, Forwards W Response to NRC RAI Re to AP600 Hydrogen Diffusion Flame Topic + (ML20138A175)
- ML20138A176 + (ML20138A176)
- ML20138A177 + (ML20138A177)
- ML20138A178 + (ML20138A178)
- ML20138A180 + (ML20138A180)
- ML20138A182 + (ML20138A182)
- ML20138A183 + (ML20138A183)
- PY-CEI-NRR-0362, Forwards Ltr Authorizing Microfiching Encl NUS Proprietary Info Re Process Control Program for Radwaste Solidification, Procedure Change Requests & Revs to Process Control Programs.Proprietary Info Withheld + (ML20138A185)
- ML20138A186 + (ML20138A186)
- ML20138A187 + (ML20138A187)
- ML20138A188 + (ML20138A188)
- ML20138A192 + (ML20138A192)