Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137T288 + (ML20137T288)
- ML20137T289 + (ML20137T289)
- ML20137T291 + (ML20137T291)
- ML20137T294 + (ML20137T294)
- ML20137T295 + (ML20137T295)
- ML20137T296 + (ML20137T296)
- ML20137T297 + (ML20137T297)
- ML20137T298 + (ML20137T298)
- ML20137T301 + (ML20137T301)
- ML20137T302 + (ML20137T302)
- ML20137T303 + (ML20137T303)
- ML20137T304 + (ML20137T304)
- 05000528/LER-1985-071, :on 851024,reactor Tripped Following Manual Turbine Trip Due to Low Steam Generator Level.Caused by High Pressure Pulse Due to Rapid Closure of Throttle Valves.Time Delay Increased for Low Level Trip Bistable + (ML20137T305)
- ML20137T309 + (ML20137T309)
- ML20137T310 + (ML20137T310)
- IR 05000456/1983009 + (ML20137T311)
- ML20137T312 + (ML20137T312)
- ML20137T313 + (ML20137T313)
- ML20137T314 + (ML20137T314)
- ML20137T315 + (ML20137T315)
- ML20137T316 + (ML20137T316)
- ML20137T320 + (ML20137T320)
- ML20137T321 + (ML20137T321)
- JAFP-97-0126, Monthly Operating Rept for Mar 1997 for JAFNPP + (ML20137T323)
- ML20137T324 + (ML20137T324)
- ML20137T325 + (ML20137T325)
- ML20137T327 + (ML20137T327)
- ML20137T329 + (ML20137T329)
- ML20137T332 + (ML20137T332)
- ML20137T333 + (ML20137T333)
- 05000369/LER-1985-033-01, :on 851030,momentary Blackout on Train B Occurred.Caused by Nuclear Control Operator Inadvertently Opening Diesel Generator Breaker.Procedures for Blackout Implemented.Collars Installed on Generator + (ML20137T336)
- ML20137T338 + (ML20137T338)
- ML20137T339 + (ML20137T339)
- 05000321/LER-1985-050, :on 851226,30,860102,07 & 11,reactor Protection Sys Alternate Power Supply Bus Breakers Tripped.Caused by Voltage Sensing Circuitry Responding to Voltage Fluctuations on Bus.Voltage Regulator Installed + (ML20137T340)
- ML20137T341 + (ML20137T341)
- ML20137T344 + (ML20137T344)
- ML20137T347 + (ML20137T347)
- 05000413/LER-1985-061, :on 851018,unit Shut Down Due to Excessive Unidentified Reactor Coolant Leakage.Caused by Component Failures.Leaking Valves Repaired & Bolts on Neutron Controller Pump Main Flange Retightened + (ML20137T354)
- ML20137T357 + (ML20137T357)
- ML20137T359 + (ML20137T359)
- 05000328/LER-1996-004-01, Forwards LER 96-004-01 Which Discusses Details Concerning Replacement of Reactor Trip Breaker B + (ML20137T360)
- ML20137T364 + (ML20137T364)
- ML20137T365 + (ML20137T365)
- 05000328/LER-1996-004-02, :on 960919,reactor Trip Breaker Was Removed After It Was Found to Have Inoperable Auxiliary Contacts. Caused by Inadequate Procedure.Revised Breaker Procedure & Reemphasized Requirements for Working Steps Out of Sequence + (ML20137T367)
- ML20137T371 + (ML20137T371)
- ML20137T373 + (ML20137T373)
- ML20137T374 + (ML20137T374)
- ML20137T375 + (ML20137T375)
- 05000352/LER-1986-008, :on 860124,main Control Room Ventilation Sys Isolated & Emergency Fresh Air Sys Train a Started.Caused by Defective Analyzer Tape.Chlorine Detection Sys Installed + (ML20137T376)
- ML20137T378 + (ML20137T378)
- ML20137T381 + (ML20137T381)