ML20137T333

From kanterella
Jump to navigation Jump to search
Forwards Copy of BVPS Unit 2 Cycle 7 Startup Test Rept Provided IAW TS 6.9.1.3 Item (2) Which Summarizes Applicable Physics Testing Performed to Verify Adequacy of Cycle 7 Reload Core Design
ML20137T333
Person / Time
Site: Beaver Valley
Issue date: 04/09/1997
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137T338 List:
References
NUDOCS 9704160073
Download: ML20137T333 (1)


Text

.

s p

9 v Valley Power Station Shippingport, PA 15077 0004 j

SUSHIL C.JAIN DMalon Vice President (412) 393-5512 i

Fax (412) 643-8069

$*c'i7, S April 9, 1997 Po DMalon U. S. Nuclear Regulatory Commission j Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Cycle 7 Startup Test Report Enclosed is a copy of the Beaver Valley Power Station Unit 2 Cycle 7 Startup Test Report provided in accordance with Technical Specification 6.9.1.3 Item (2). This report summarizes the applicable physics testing performed to verify the adequacy of the Cycle 7 reload core design. The results of each test performed indicate that the measured parameters are within the specified acceptance criteria.

Sincerely, Sushil C. Jain c:

Mr. D. M. Kern, Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager

/

f 2

5eauI <

13o110 DEllVERING.

j 9704160073 970409 0UAllTY PDR ADOCK 05000412 i

ENER6Y i

P PDR

\\

41lIlmpl.nlpt.utisp

-