s p
9 v Valley Power Station Shippingport, PA 15077 0004 j
SUSHIL C.JAIN DMalon Vice President (412) 393-5512 i
Fax (412) 643-8069
$*c'i7, S April 9, 1997 Po DMalon U. S. Nuclear Regulatory Commission j Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Cycle 7 Startup Test Report Enclosed is a copy of the Beaver Valley Power Station Unit 2 Cycle 7 Startup Test Report provided in accordance with Technical Specification 6.9.1.3 Item (2). This report summarizes the applicable physics testing performed to verify the adequacy of the Cycle 7 reload core design. The results of each test performed indicate that the measured parameters are within the specified acceptance criteria.
Sincerely, Sushil C. Jain c:
Mr. D. M. Kern, Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager
/
f 2
5eauI <
13o110 DEllVERING.
j 9704160073 970409 0UAllTY PDR ADOCK 05000412 i
ENER6Y i
P PDR
\\