ML20137T338

From kanterella
Jump to navigation Jump to search
Forwards Copy of BVPS Unit 2 Cycle 7 Startup Test Rept Provided IAW TS 6.9.1.3 Item (2) Which Summarizes Applicable Physics Testing Performed to Verify Adequacy of Cycle 7 Reload Core Design
Date released: 05/30/2020 Download: ML20137T338


Cycle 7 Startup Physics Test Rept.
ML20137T344
Person / Time
Site: Beaver Valley
Issue date: 04/09/1997
From: Colussy K, Dulick A, Zupsic G
DUQUESNE LIGHT CO.
To:
References
Download: ML20137T344 (12)
Forwards Copy of BVPS Unit 2 Cycle 7 Startup Test Rept Provided IAW TS 6.9.1.3 Item (2) Which Summarizes Applicable Physics Testing Performed to Verify Adequacy of Cycle 7 Reload Core Design
ML20137T333
Person / Time
Site: Beaver Valley
Issue date: 04/09/1997
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20137T333 (1)