ML20137T302
| ML20137T302 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 11/26/1985 |
| From: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Harrison R PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| References | |
| NUDOCS 8512060428 | |
| Download: ML20137T302 (3) | |
Text
y DISTRIBUTION:
A PDR LPDR LFMS Actual Manpower File RMDiggs CJHollcway
' Reg >00cket2 File DWeiss y 2 01985 LFMS Reactor File LSolander, PRAB M) g n
B Docket No. 50-443
).. tu.Mt Public Service Company of New Hampshire d N*erNM ATTH: Mr. Robert J. Harrison Chairman and Chief Executive Officer P.O. Box 330 Manchester, New Hampshire 03105 Gentlemen:
As you are aware,10 CFR 170 of the Comission's regulations for license and inspection fees was revised effective June 20, 1984. Section170.12(b) of the revised rule provides that for applications for permits, licenses, facility reference design approvals, and special projects which have been on file with the Comission for review for six months or longer, billings would be made at six-month intervals or when the review is completed, whichever is earlier.
Consistent with the requirements of 10 CFR 170.12(b), we have completed the cost analysis for the Seabrook 1 and Seabrook 2 OL application review for the period June 24, 1984 through December 22, 1984. The costs through that period are $f44,397 for Seabrook I and $29,464 for Seabrook 2.
The enclosures show a breakdown of the review costs by program office. The Office of Nuclear Reactor Regulation has made cost adjustments of $4,800 to Seabrook 1 for the previous reporting period leaving a revised cost total for the period June 24, 1984 through December 22, 1984 of $639,597. When the costs of $639,597 for Seabrook 1 are added to the costs of $2.549,537 from the previous billing period, the cumulative costs of $3.189.134 exceed by $111,734 the maximum fee of
$3,077,400 as currently stated in 10 CFR 170.21. Accordingly, $111,734 has been subtracted from the costs of $639,597, leaving a balance of
$527,863 for Seabrook 1.
The Office of Resource Management has been notified to bill your Company $527,863 for Seabrook 1 and $29,464 for Seabrook 2. When making payment, please make reference to the bill numbers.
Sincerely,
'nal Signed hp 8512060428 851126 PDR ADOCK 05000443 A
PDR William 0. Miller, 5f actor License Fee Management Staff Office of Administratioa
Enclosures:
Cost-Breekdowns-By
.ProdramOff.jce.
L DM LFM ADM 1
'""'a"2 5 CJ.H ay:jp _W0 Miller.
11
/85
.ll/k/85 N~tC FO9M 318 40-80) NRCMor OFFICIAL RECORD COPY
,g Public Service Co'mpany of'New Hampshire Operating License Review Costs from 6/24/84 through 12/22/84 FACILITY:
SEABROOK 1 DOCKET NO.:
50-443 Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs 1.
$62 2,040.0
$126,480
$341,461 S467,941 2.
IE-HQ 53 556.0 29,458 23,028 52,496 3.
REGIONS 53 2,191.5 116,150 6,621 122,771 4
4.
ACRS 62 5.
NMSS.
58 20.5 1,189 1,189 Total Cost:
5644,397 NRR Cost Adjustment For Previous Billing Period
-4,800 Revised Cost Total S639,5970 1/ When the costs of $639,597 are added to the costs of $2,549,537 for the previous billing period the cumulative costs through December 22, 1984 are $3,189,134. This total exceeds by $111,734 the maximum fee of $3,077,400 as currently stated in 10 CFR 170.21.
Accordingly, $111,734 has been subtracted from the costs of $639,597 leaving a total of $527,863 to be assessed for this billing period.
truT1JUc ServCce Company of New Hampshire
.t Operating Lic nse Revi,ew Costs from 6/24/84 through 12/22/84 FACILITY:
SEABROOK ?
DOCKET NO.:
50-444 Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Sta f f-hour Expended Costs Costs Costs 1.
$62 2.
IE-HQ 53 53.0
$2,8' 9
$23,028 525,837 J
3.
REGIONS 53 46.0 2,438 2,438
- 4. ACRS 62
- 5.
HMSS 58 20.5 1,189 1,189 Total Cost:
529,464 5
9
-