Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137G472 + (ML20137G472)
- ML20137G477 + (ML20137G477)
- ML20137G478 + (ML20137G478)
- ML20137G479 + (ML20137G479)
- ML20137G481 + (ML20137G481)
- ML20137G483 + (ML20137G483)
- ML20137G484 + (ML20137G484)
- ML20137G487 + (ML20137G487)
- ML20137G488 + (ML20137G488)
- ML20137G490 + (ML20137G490)
- ML20137G492 + (ML20137G492)
- ML20137G493 + (ML20137G493)
- ML20137G494 + (ML20137G494)
- IR 05000368/1985015 + (ML20137G495)
- ML20137G498 + (ML20137G498)
- ML20137G503 + (ML20137G503)
- ML20137G504 + (ML20137G504)
- ML20137G505 + (ML20137G505)
- ML20137G507 + (ML20137G507)
- ML20137G508 + (ML20137G508)
- ML20137G510 + (ML20137G510)
- ML20137G512 + (ML20137G512)
- ML20137G514 + (ML20137G514)
- ML20137G518 + (ML20137G518)
- 05000304/LER-1985-025-05, :on 851023,three Steam Generator D narrow-range Level Transmitters Found Out of Tolerance,Due to Instrument Drift Refueling Calibr.Transmitters Replaced Under Mod M22-1(2)-85-21 + (ML20137G519)
- ML20137G522 + (ML20137G522)
- ML20137G524 + (ML20137G524)
- B16307, Provides Response to Violations Noted in Insp Repts 50-245/96-13,50-336/96-13 & 50-423/96-13.Corrective Actions: Steam Tunnel Will Not Be Isolated from Reactor Bldg Since No Potential Exists for HELB Event to Ensure Compliance + (ML20137G525)
- ML20137G527 + (ML20137G527)
- ML20137G530 + (ML20137G530)
- PNO-I-86-002, on 860109,fire Protection Deluge Sys for Auxiliary Transformer Manually Actuated by Unknown Person at Local Fire Box.Caused by Intentional Act of Tampering or Harassment.Addl Security Patrols Instituted + (ML20137G531)
- 3F0397-19, Forwards Sys Readiness Review Plan & Schedule for Completion of Plan,Per Request + (ML20137G532)
- ML20137G536 + (ML20137G536)
- ML20137G537 + (ML20137G537)
- ML20137G540 + (ML20137G540)
- ML20137G541 + (ML20137G541)
- ML20137G545 + (ML20137G545)
- U-600359, Forwards Details Re Termination of Seismic Interaction Program Initiated in Response to Noncompliance Noted in Insp Rept 50-461/80-17 & FSAR Meb Item 3 + (ML20137G548)
- ML20137G552 + (ML20137G552)
- ML20137G553 + (ML20137G553)
- ML20137G555 + (ML20137G555)
- ML20137G557 + (ML20137G557)
- ML20137G562 + (ML20137G562)
- PNO-V-86-003, on 860109,during Full Power Turbine Trip Test Following Turbine Trip/Reactor Trip,Electrical Buses Which Supply Power to Reactor Coolant Pumps Failed to Transfer to Alternate Source.Restart Plans Unknown + (ML20137G563)
- ML20137G564 + (ML20137G564)
- ML20137G567 + (ML20137G567)
- ML20137G570 + (ML20137G570)
- ML20137G572 + (ML20137G572)
- ML20137G576 + (ML20137G576)
- ML20137G577 + (ML20137G577)
- ML20137G578 + (ML20137G578)