Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136G994 + (ML20136G994)
- ML20136G995 + (ML20136G995)
- ML20136G996 + (ML20136G996)
- ML20136G997 + (ML20136G997)
- ML20136G998 + (ML20136G998)
- ML20136G999 + (ML20136G999)
- ML20136H000 + (ML20136H000)
- ML20136H004 + (ML20136H004)
- ML20136H006 + (ML20136H006)
- ML20136H007 + (ML20136H007)
- ML20136H010 + (ML20136H010)
- ML20136H011 + (ML20136H011)
- ML20136H012 + (ML20136H012)
- ML20136H016 + (ML20136H016)
- ML20136H017 + (ML20136H017)
- ML20136H018 + (ML20136H018)
- ML20136H021 + (ML20136H021)
- ML20136H022 + (ML20136H022)
- ML20136H023 + (ML20136H023)
- ML20136H025 + (ML20136H025)
- ML20136H026 + (ML20136H026)
- ML20136H028 + (ML20136H028)
- ML20136H029 + (ML20136H029)
- ML20136H031 + (ML20136H031)
- ST-HL-AE-1528, Forwards marked-up FSAR Section 5.4.7,revising RCS Pressure Setpoints for RHR Sys Interlock Subsequent to Issuance of Draft SER + (ML20136H032)
- ML20136H034 + (ML20136H034)
- NPL-97-0087, Forwards Updated Unit 2 Startup Commitment List & Restart Commitment Summary .Documents Provide Progress Summary Update for Unit 2 Restart,Identified in + (ML20136H036)
- ML20136H039 + (ML20136H039)
- ML20136H041 + (ML20136H041)
- ML20136H043 + (ML20136H043)
- U-600378, Responds to NRC Re Employee Concern.Lengthening of Tube Steel for Hanger Installation Necessary Due to Crowding of Welds at End of Cantilever.Discrepancy in Design Requirements for Auxiliary Steel Does Not Exist + (ML20136H045)
- ML20136H046 + (ML20136H046)
- ML20136H048 + (ML20136H048)
- ML20136H049 + (ML20136H049)
- NG-97-0336, Provides Updated Info Re Calculated Reactor Vessel Level Cited in Ltr Re Request for TS Change RTS-2858 Concerning Reactor Water Cleanup Vessel Level Isolation Setpoint Change + (ML20136H053)
- A05440, Requests Addl 60 Days to Submit Response to NRC Analysis & Conclusions Re Risk of Station Blackout.Extension Needed Due to Magnitude of Effort Necessary to Respond & Current Resource Commitments to Other Regulatory Programs + (ML20136H054)
- ML20136H056 + (ML20136H056)
- ML20136H057 + (ML20136H057)
- ML20136H060 + (ML20136H060)
- ML20136H061 + (ML20136H061)
- ML20136H063 + (ML20136H063)
- ML20136H064 + (ML20136H064)
- ML20136H066 + (ML20136H066)
- PNO-IV-86-002, on 860104,cylinder Containing Approx 29,500 Lbs UF6 Ruptured,Releasing Contents Into Atmosphere & Causing Death of Employee from Inhaling Hydrogen Fluoride. NRC Has Established Emergency Response Organization at Site + (ML20136H067)
- 05000413/LER-1997-001-02, :on 970210,unanalyzed Postulated Single Failure Affected SG Tube Rupture Analysis.Caused by Less than Adequate Single Failure Analysis of SG Porv.Proposed Amend to TS 3/4.7.1.6 & UFSAR Has Been Submitted + (ML20136H069)
- ML20136H070 + (ML20136H070)
- ML20136H071 + (ML20136H071)
- ML20136H072 + (ML20136H072)
- RC-97-0052, Submits Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs + (ML20136H074)
- ML20136H075 + (ML20136H075)
- ML20136H076 + (ML20136H076)