List of results
- 05000325/LER-1985-046, :on 850821,inadequate Response Time Test Procedures of Logic Circuitry Relays of Secondary Containment Isolation Instrumentation Identified.Caused by Insufficient Technical Procedure Review + (ML20135H935)
- 0CAN098501, Semiannual Radioactive Effluent Rept,First & Second Quarters,1985 + (ML20135H936)
- ML20135H937 + (ML20135H937)
- 05000305/LER-1985-018, :on 850820,discovered That Fire Hose Insp Required by Tech Spec 4.15.2 Performed Outside Required 18-month (Plus or Minus 25%) Time Interval.Caused by Mgt Oversight When Procedure Modified + (ML20135H938)
- 05000361/LER-1985-018-01, :on 850820,reactor Tripped in Response to Trip Signals from Channels 1 & 3 of Core Protection Calculators. Caused by Inadequate Guidance in 31-day Surveillance Testing Procedure.Procedures Revised + (ML20135H939)
- ML20135H941 + (ML20135H941)
- 05000220/LER-1985-014, :on 850819,during Surveillance Insp,Maint Electrician Inadvertently Grounded Main Generator Excitation Sys Amplidyne Motor Generator Set,Causing Main Generator & Turbine Trips & Reactor Scram + (ML20135H943)
- CLI-85-16, Order CLI-85-16 Vacating Both ALAB-809 & Underlying ASLB Decisions Re Graterford Emergency Planning Contentions as Moot.Served on 850919.Re-served on 850923 + (ML20135H945)
- B11712, Forwards Response to 850826 Request for Addl Info Re Util 850724 Proposed Change to Tech Spec Mods for Spent Fuel Storage Pool Capacity + (ML20135H947)
- ML20135H949 + (ML20135H949)
- ML20135H951 + (ML20135H951)
- ML20135H952 + (ML20135H952)
- ML20135H954 + (ML20135H954)
- ML20135H955 + (ML20135H955)
- ST-HL-AE-1329, Forwards Amend 51 to FSAR for South Texas Project,Units 1 & 2,incorporating Revised Section 15.6.5 Re double-ended Cold Leg Guillotine Break LOCA Analysis & Revs to Chapter 13 Concerning Organization & Training + (ML20135H958)
- 05000336/LER-1985-013-01, :on 850822,charging Pump C Removed from Svc Due to Packing Leaks.Caused by High Internal Stresses Causing Cracks to Initiate at Subsurface Inclusions.Pump Replaced + (ML20135H960)
- ML20135H962 + (ML20135H962)
- ML20135H968 + (ML20135H968)
- ML20135H976 + (ML20135H976)
- ML20135H977 + (ML20135H977)
- 05000316/LER-1985-020-01, :on 850822,during Surveillance Testing, safety-related Fire Damper Found Inoperable.Cause Not Determined.Damper Repaired,Tested & Returned to Svc on 850823 + (ML20135H979)
- 05000316/LER-1985-021-01, :on 850822 & 23,discovered That Several Instrumentation Channel Functional Tests Not Performed as Required.Cause Not Stated.Testing Conducted + (ML20135H981)
- ML20135H982 + (ML20135H982)
- ML20135H983 + (ML20135H983)
- ML20135H984 + (ML20135H984)
- ML20135H985 + (ML20135H985)
- ML20135H986 + (ML20135H986)
- ML20135H988 + (ML20135H988)
- TXX-4544, Discusses Implementation of Plans to Meet Requirements of Generic Ltr 84-16 Re Qualification & Training of Operators. Experienced Shift Supervisors Will Be Used to Enhance on-shift Experience,Per Sser 6 (NUREG-0797) + (ML20135H989)
- ML20135H990 + (ML20135H990)
- B11619, Application for Amend to License SNM-1950,allowing Storage & Use of Listed Detectors,Sources & Surveillance Capsules at Millstone Unit 3 Site + (ML20135H991)
- W3P85-2634, Forwards Phase I Heavy Loads Evaluation for Auxiliary Containment Pedestal Crane & Control Environ Drive Mechanism Cooling Ducts.Criteria of NUREG-0612,Section 5.1.1 Satisfied + (ML20135H992)
- L-85-355, Responds to NRC Re Violations Noted in Insp Repts 50-250/85-23 & 50-251/85-23.Corrective Actions:Spent Fuel Pit Piping Surveillance Frequency Increased & Procedures Revised.Requests That NRC Mitigate Increased Civil Penalty + (ML20135H993)
- ML20135H994 + (ML20135H994)
- ML20135H995 + (ML20135H995)
- ML20135H996 + (ML20135H996)
- ML20135J000 + (ML20135J000)
- 05000395/LER-1985-024, :on 850820 & 24,reactor Trips Occurred from 100% & 10% Power,Respectively.Caused by Low RCS Flow & Conservative Intermediate Range Setpoints.Precautions Added to Maint Procedures + (ML20135J001)
- ML20135J003 + (ML20135J003)
- ML20135J004 + (ML20135J004)
- ML20135J005 + (ML20135J005)
- ML20135J007 + (ML20135J007)
- 05000304/LER-1985-005-01, :on 850806,discovered Svc Bus Undervoltage Start of Auxiliary Feedwater Pump Not Periodically Tested & Relays Which Start Pumps on lo-lo Steam Generator Level Not Tested for Three Steam Generators + (ML20135J008)
- ML20135J010 + (ML20135J010)
- 05000333/LER-1985-023, :on 850905,emergency Diesel Generators a & C Inadvertently Started.Caused by Operator Error.Operators Counseled on Necessity for Completing Procedural Step Before Starting Next Step + (ML20135J011)
- ML20135J012 + (ML20135J012)
- ML20135J013 + (ML20135J013)
- 05000302/LER-1985-015, :on 850820,automatic Reactor Trip Occurred Due to Severed Drain Line for Main Turbine High Pressure Crossover Line.Caused by Fatigue Failure of Socket Weld Due to Fabrication Defect.Weld Repaired + (ML20135J014)
- ML20135J015 + (ML20135J015)
- ML20135J016 + (ML20135J016)
- ML20135J017 + (ML20135J017)