ML20135H977

From kanterella
Jump to navigation Jump to search
Forwards LERs 85-020-00 & 85-021-00
Date released: 05/28/2020 Download: ML20135H977


:on 850822 & 23,discovered That Several Instrumentation Channel Functional Tests Not Performed as Required.Cause Not Stated.Testing Conducted
ML20135H981
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/20/1985
From: Blind A
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML20135H981 (2)
:on 850822,during Surveillance Testing, safety-related Fire Damper Found Inoperable.Cause Not Determined.Damper Repaired,Tested & Returned to Svc on 850823
ML20135H979
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/20/1985
From: Allard J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML20135H979 (1)
Forwards LERs 85-020-00 & 85-021-00
ML20135H976
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/20/1985
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
Download: ML20135H976 (1)