Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135E871 + (ML20135E871)
- ML20135E872 + (ML20135E872)
- ML20135E873 + (ML20135E873)
- ML20135E879 + (ML20135E879)
- ML20135E881 + (ML20135E881)
- ML20135E884 + (ML20135E884)
- GO2-96-236, Forwards Rev 33 to WNP-2 Physical Security Plan.Encl Withheld + (ML20135E887)
- ML20135E889 + (ML20135E889)
- PNO-I-96-088, on 961211,shipment Containing 64-Ci Ir-192 Radiography Source Missing in Transit.Licensee Will Continue Efforts to Locate Package Through Canadian Ofc.Region I Public Affairs Prepared to Respond to Media Inquiries + (ML20135E892)
- 05000413/LER-1985-049-01, :on 850807,inadvertent Isolation of Both Discharge Headers of Fire Protection (Ry) Pumps Occurred. Caused by Personnel Error.Correct Ry Header Isolated. Procedure 2-18 Revised + (ML20135E896)
- ML20135E900 + (ML20135E900)
- IA-96-354, Second Final Response to FOIA Request for Documents. Documents Listed in App D Partially Withheld (Ref FOIA Exemption 4) + (ML20135E900)
- ML20135E903 + (ML20135E903)
- ML20135E904 + (ML20135E904)
- ML20135E905 + (ML20135E905)
- ML20135E906 + (ML20135E906)
- NUREG-0908, Ack Receipt of 961030 Amend 41 to Physical Security Plan. Eleven Changes Did Not Meet Criteria of 10CFR50.54(p),two Changes Did Not Follow Acceptance Criteria of NUREG-0908 & 37 Changes Require Clarification + (ML20135E908)
- ML20135E909 + (ML20135E909)
- ML20135E910 + (ML20135E910)
- ML20135E911 + (ML20135E911)
- ML20135E912 + (ML20135E912)
- ML20135E913 + (ML20135E913)
- ML20135E919 + (ML20135E919)
- ML20135E922 + (ML20135E922)
- ML20135E923 + (ML20135E923)
- ML20135E924 + (ML20135E924)
- ML20135E926 + (ML20135E926)
- ML20135E927 + (ML20135E927)
- IR 05000335/1985020 + (ML20135E929)
- IR 05000271/1997099 + (ML20135E931)
- B11682, Forwards Summary of Integrated Safety Assessment Program, Topic 1.21, Fault Transfers, Per 850731 Request.Public Safety Impact Scores Considered Preliminary.Ranking Will Be Reviewed When All Project Analyses Completed + (ML20135E933)
- ML20135E934 + (ML20135E934)
- B11684, Provides Summary of Integrated Safety Assessment Program, Topic 1.12, Control Room Habitability, Per NRC . Topic Will Be Evaluated for Public Safety Impact When Analyses for Entire Project Completed + (ML20135E935)
- 05000369/LER-1984-022-01, :on 840720,discovered That Fire Protection & Drain Piping Serving Control Room Pressurization Filter Trains Did Not Incorporate Seismic Design Criteria.Mods to Be Implemented to Correct Deficiency + (ML20135E937)
- ML20135E938 + (ML20135E938)
- ML20135E939 + (ML20135E939)
- 3F0885-22, Forwards Response to Regulatory Effectiveness Review Dtd 850618.Response Withheld + (ML20135E940)
- ML20135E941 + (ML20135E941)
- ML20135E942 + (ML20135E942)
- ML20135E944 + (ML20135E944)
- ML20135E945 + (ML20135E945)
- ML20135E947 + (ML20135E947)
- ML20135E948 + (ML20135E948)
- ML20135E950 + (ML20135E950)
- ML20135E952 + (ML20135E952)
- ML20135E955 + (ML20135E955)
- ML20135E956 + (ML20135E956)
- ML20135E957 + (ML20135E957)
- ML20135E964 + (ML20135E964)
- IR 05000295/1985028 + (ML20135E965)
- ML20135E966 + (ML20135E966)