ML20135E938
| ML20135E938 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 02/28/1997 |
| From: | Keimig R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Feigenbaum T NORTHEAST UTILITIES SERVICE CO. |
| Shared Package | |
| ML20135E942 | List: |
| References | |
| NUDOCS 9703110047 | |
| Download: ML20135E938 (3) | |
Text
s February 28, 1997 Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer Northeast Utilities Service Company c/o Mr. Terry L. Harpster P.O. Box 128 Waterford, CT 06385
SUBJECT:
FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) POST EXERCISE REPORT FOR JANUARY 10,1997 MS1-DRILL AT SAINTS MEMORIAL HOSPITAL IN LOWELL, MASSACHUSETTS
Dear Mr. Feigenbaum:
Enclosed is a letter from Mr. Lc lisa,11, Regional Director, FEMA, Region I, dated February 11,1997, transmitting u
'MA, Region I report for the January 10,1997, MS1-Drill.
There were no deficiencies or areas requiring corrective actions (ARCAs) identified during the drill. However, the executive summary indicates that there was one ARCA identified.
We confirmed with Mr. Daniel McElhinney, FEMA, Region I that the executive summary is in error.
Please continue to provide assistance to Saints Memorial Hospital and the Commonwealth of Massachusetts to ensure continued good performance during future drills.
Sincerely,
~
Richard R. Keimig, Chief Emergency Preparedness and Safeguards Branch Division of Reactor Safety Docket No. 50-443
Enclosure:
As stated i
(
/
[
9703110047 970228 PDR ADOCK 05000443 F
.h
Mr. Ted C. Feigenbaum 2
cc w/ encl:
B. D. Kenyon, President - Nuclear Group D. M. Goebel, Vice President - Nuclear Oversight F. C. Rothen, Vice President - Work Services 1
J. K. Thayer, Vice President - Recovery Officer, Nuclear Engineering & Support Officer H. F. Haynes, Director - Nuclear Training B. L. Drcwbridge, Executive Director - Services & Senior Site Officer A. M. Callendrello, Licensing Manager - Seabrook Station W. A. DiProfio, Nuclear Unit Director - Seabrook Station R E. Hickok, Nuclear Training Manager - E,eabrook Station L. M. Cuoco, Senior Nuclear Counsel W. D. Meinert, Nuclear Engineer j
D. C. McElhinney, RAC Chairman, FEMA RI, Boston, MA j
R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire S. Choi, Director, Nuclear Safety, Massachusetts Emergency Management Agency F. W. Gu san, Jr., Vice President and General Counsel - Great Bay Power Corporation Commonwealth of Massachusetts, SLO Designee R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts Seacoast Anti-Pollution League State of New Hampshire, SLO D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States j
l l
Mr. Ted C. Feigenbaum 3
Distribution w/ encl:
Region i Docket Room (with concurrences)
J. Rogge, DRP NRC Resident inspector E. Conner, DRP D. Screnci, PAO C. O'Daniell, DRP Nuclear Safety Information Center (NSIC)
PUBLIC W. Dean, OEDO P. Milano, PD l 3, NRR A. DeAga7io, PD l-3, NRR R. Correia, NRR (RPC)
D. Taylor, NRR Inspection Prognim Branch, NRR (IPAS) l 1
DOCUMENT NAME: G:\\EP&SB\\ LUSHER \\SEABFEMA.RPT Ta receive a copy of this document,fwNeste in the box: *C" = Copy wi}nout ottachment/ enclosure "E" = Copy with attachment / enclosure
- N* = No copy 0FFICE RI/DRS //
lC Rl/DRS / lv l
l
{
l NAME JLusher N #'"
RKeimi r
' /97 DATE 02/28/97/ '
02/ # /97 02/
/97 02/
/97 02/
0FFICIAL RECORD COPY I