Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135D254 + (ML20135D254)
- ML20135D255 + (ML20135D255)
- ML20135D256 + (ML20135D256)
- 05000416/LER-1996-004, :on 960606,manual Reactor Scram Occurred Due to Spurious Multiple SRV Lifts.Trip Unit 1C11N655B Was Shipped to Manufacturer for Failure Analysis + (ML20135D257)
- ML20135D258 + (ML20135D258)
- ML20135D259 + (ML20135D259)
- ML20135D261 + (ML20135D261)
- ML20135D262 + (ML20135D262)
- ML20135D264 + (ML20135D264)
- ML20135D268 + (ML20135D268)
- 05000155/LER-1997-003, :on 970128,demineralized Water Piping Discovered Susceptible to Overpressurization During Dba. Caused by Design Deficiency.Conducted Evaluation of Surge Protection for Piping & Procedures Revised + (ML20135D269)
- ML20135D270 + (ML20135D270)
- ML20135D271 + (ML20135D271)
- ML20135D273 + (ML20135D273)
- ML20135D274 + (ML20135D274)
- ML20135D275 + (ML20135D275)
- 05000424/LER-1996-010-01, :on 961101,safety Injection Pump Rendered Inoperable Due to Lack of Motor Cooling.Caused by Improper Gasket Installation & Inadequate Procedural Guidance.Coolers Reassembled Properly & SIP B Returned to Svc + (ML20135D279)
- ML20135D282 + (ML20135D282)
- ML20135D284 + (ML20135D284)
- ML20135D289 + (ML20135D289)
- 05000382/LER-1997-003, :on 970130,process Analog Computer Card Failed on Essential Services Chilled Water Train B.Caused by Open Fuse on Process Analog Control.New Pac Card Installed & Calibrated + (ML20135D294)
- ML20135D295 + (ML20135D295)
- ML20135D298 + (ML20135D298)
- 05000366/LER-1985-029-01, :on 850809,during Update of Seismic Category 1 Structures Settlement Rept,Personnel Noted Structure Settlement Surveillance Not Performed in Jan 1981 & 1984 & Aug 1984.Caused by Procedural Inadequacy + (ML20135D300)
- NRC-97-0015, Responds to NRC Re Violations Noted in Insp Rept 50-341/96-10.Corrective Actions:Critique of Incident Was Immediately Held & Test Was Then Reperformed Without Further Incident + (ML20135D301)
- ML20135D302 + (ML20135D302)
- 05000366/LER-1985-028-01, :on 850809 & 12 During line-by-line Review of Tech Specs & Implementing Procedures,Personnel Noted Three Surveillance Requirements for high-range Radiation Recorder Not Satisfied After Addition of Amends + (ML20135D305)
- ML20135D306 + (ML20135D306)
- ML20135D310 + (ML20135D310)
- ML20135D312 + (ML20135D312)
- IR 05000341/1996006 + (ML20135D313)
- ML20135D314 + (ML20135D314)
- ML20135D316 + (ML20135D316)
- ML20135D317 + (ML20135D317)
- ML20135D318 + (ML20135D318)
- ML20135D320 + (ML20135D320)
- ML20135D321 + (ML20135D321)
- ML20135D322 + (ML20135D322)
- HL-5263, Forwards Revised Relief Requests RR-P-10 & RR-P-12 + (ML20135D324)
- ML20135D326 + (ML20135D326)
- 05000277/LER-1996-011-01, :on 961030,main Steam Line Relief Valve Actuation Occurred Due to Inadvertent Movement of Control Switch.Reactor Operator Immediately Recognized Situation & Reclosed Valve.Event Discussed W/All Crews + (ML20135D327)
- ML20135D328 + (ML20135D328)
- 05000374/LER-1984-018-07, :on 840517,HPCS Pump Breaker Failed to Close. Caused by Switchgear Position Switch 52LS Failing to Make Contact When Breaker Racked Up.Position Switch Replaced, Readjusted & Inspected + (ML20135D333)
- ML20135D335 + (ML20135D335)
- ML20135D338 + (ML20135D338)
- ML20135D341 + (ML20135D341)
- ML20135D343 + (ML20135D343)
- ML20135D344 + (ML20135D344)
- B16270, Annual Operating Rept for 1996 + (ML20135D346)
- ML20135D347 + (ML20135D347)
- ML20135D350 + (ML20135D350)