Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NSD-NRC-97-4984, Forwards Response to AP600 TS LCO 3.0.3 + (ML20135A232)
- 05000454/LER-1985-077, :on 850807,area Radiation Monitor ORT-AR056 Went Into Interlock Mode Due to Voltage Transient.Caused by Starting Circulating Water Pump 1B,resulting in Auto Start of Ob Fuel Handling Bldg Charcoal Fan + (ML20135A233)
- ML20135A234 + (ML20135A234)
- ML20135A235 + (ML20135A235)
- TXX-4343, Suppls Response to NRC Re Deviation Noted in Insp Rept 50-445/84-15.Corrective Action:Spec 6.5.3 Added to Require Procedure Review by Individual/Group That Did Not Prepare Procedure + (ML20135A236)
- ML20135A238 + (ML20135A238)
- ML20135A239 + (ML20135A239)
- TXX-4287, Responds to NRC Re Deviation Noted in Insp Rept 50-445/84-15.Corrective Actions:Spec 6.5.1.6 Changed to Require Station Operations Review Committee Review of Only Administrative Procedures + (ML20135A243)
- ML20135A244 + (ML20135A244)
- ML20135A246 + (ML20135A246)
- ML20135A247 + (ML20135A247)
- IR 05000445/1996008 + (ML20135A249)
- ML20135A251 + (ML20135A251)
- ML20135A254 + (ML20135A254)
- ML20135A255 + (ML20135A255)
- ML20135A256 + (ML20135A256)
- ML20135A258 + (ML20135A258)
- ML20135A261 + (ML20135A261)
- ML20135A262 + (ML20135A262)
- ML20135A264 + (ML20135A264)
- ML20135A265 + (ML20135A265)
- ML20135A266 + (ML20135A266)
- ML20135A267 + (ML20135A267)
- ML20135A268 + (ML20135A268)
- ML20135A269 + (ML20135A269)
- ML20135A270 + (ML20135A270)
- ML20135A271 + (ML20135A271)
- ML20135A273 + (ML20135A273)
- ML20135A274 + (ML20135A274)
- IR 05000458/1997004 + (ML20135A275)
- ML20135A279 + (ML20135A279)
- ML20135A280 + (ML20135A280)
- ML20135A282 + (ML20135A282)
- ML20135A284 + (ML20135A284)
- IR 05000416/1996019 + (ML20135A285)
- ML20135A288 + (ML20135A288)
- ML20135A290 + (ML20135A290)
- ML20135A293 + (ML20135A293)
- ML20135A294 + (ML20135A294)
- ML20135A296 + (ML20135A296)
- ML20135A297 + (ML20135A297)
- ML20135A301 + (ML20135A301)
- ML20135A302 + (ML20135A302)
- ML20135A304 + (ML20135A304)
- ML20135A305 + (ML20135A305)
- ST-HL-AE-5516, Responds to NRC Bulletin 96-001, Control Rod Insertion Problems. Results of Fuel Assembly Testing Encl + (ML20135A306)
- ML20135A308 + (ML20135A308)
- TXX-4545, Updates Util Re Max Allowable Time for Operator Action Following Control Room/Cable Spreading Room Fire, Concurrent W/Loss of Offsite Power.Safe Shutdown Equipment in UPS Room Operable More than 10 Minutes W/O Ventilation + (ML20135A310)
- PNO-III-85-077, on 850904,leak Rate Test Connection Valve Installed on 850620 in Containment Sampling Sys Found Open & Attached Line Uncapped,Due to Unrevised Containment Valve Lineup Procedure.Valve Closed + (ML20135A312)
- ML20135A314 + (ML20135A314)
- ML20135A315 + (ML20135A315)