e uMITED STATES 9
7 NUCLEAR REGULATORY COMMISSION e
2
$ s;-
' g
/
C REGloN Iv 3.)
e S I' g
611 RYAN PLAZA oRIVE, SulTE 400 8
AR LING ton, TEXAS 76011 8064 u3V 2 7 1996 1
- William T. Cottle, Group Vice President, Nuclear Houston Lighting & Power Com'pany P.O. Box 289 Wadsworth, Texas 77483
SUBJECT:
SEMlANNUAL PLANT PERFORMANCE REVIEW (SPPR)- SOUTH TEXAS PROJECT
Dear Mr. Code:
On October 30,1996, the NRC staff completed the Semiannual Plant Performance Review (SPPR) of South Texas Project. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The SPPR for South Texas Project involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period of March through September 1996._ SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the South Texas Project SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in' advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months.
The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.
We willinform you of any changes to the inspection plan. If you have any questions, please contact Joseph I. Tapia of my staff at 817/860-8243.
Sincerely, e
M J. E.
yer, Director i Division of Reactor Projects Docket Nos.: 50-498 50-499 License Nos.: NPF-76 NPF-80 9612030168 961127 PDR ADOCK 05000498 P
PDR I
-l i
i.
=
1 I
j Houston Lighting & Power Company.
i l
Enclosure:
Inspection Plan cc w/ enclosure:
I Lawrence E. Martin, General Manager.
l i
Nuclear Assurance & Licensing Houston Lighting & Power Company j
P.O. Box 289 l
Wadsworth, Texas 77483 j
j-Mr. J. C. Lanier/Mr. M. B. Lee 3
City of Austin i
Electric Utility Department l
l 721 Barton Springs Road i
Mr. K. J. Fiedler/Mr. M. T. Hardt l
City Public Service Board j
P.O. Box 1771
}
San Antonio, Texas 78296 r
l Jack R. Newman, Esq.
j' Morgan, Lewis & Bockius 1800 M. Street, N.W.
Washington, D.C. 20036-5869 Mr. G. E. Vaughn/Mr. C. A. Johnson Central Power & Light Company P.O. Box 289.
Mail Code: N5012 4
Wadsworth, Texas 77483 l
INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957
)
i Dr. Bertram Wolfe 15453 Via Vaquero Monte Sereno, California 95030 1
Bureau of Radiation Control State of Texas 1100 West 49th Street.
i
)
Houston Lighting & Power Company 3-Andy Barrett, Director Environmental Policy Offbts of the Governor P.O. Box 12428 Austin, Texas 78711 1
Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, Texas 77414-Licensing Representative Houston Lighting & Power Company Suite 610 Three Metro Center Bethesda, Maryland 20814 Rufus S. Scott, Associate General Counsel Houston Lighting & Power Company P O. Box 61867 Houston, Texas 77208 Joseph R. Egan, Esq.
Egan & Associates, P.C.
2300 N Street, N.W.
Washington, D.C. 20037 Mr. J. W. Beck Little Harbor Consultants, Inc 44 Nichols Road Cohasset, MA 02025-1166
Houston Lighting & Power Company NOV 2 71996 gc,.to DMB (IE01[
bec distrib. by RIV:
L. J. Callan Resident inspector DRP Director DRS-PSB Branch Chief (DRP/A)
MIS System Project Engineer (DRP/A)
RIV File Branch Chief (DRP/TSS)
R. Bachmann, OGC (MS: 15-B-18)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
R. V. Azua (DRP/TSS) 1 DOCUMENT NAME: G:\\DRPDIR\\SPPR\\STP.LTR j
To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy I RIV:DRP/A C:DRP/A AD:DRS d
D:DRP A7 RAKopriva;df Sjf JITapia Q KEBrockmarfj JEDyer$[j4 f
i 11//196 11#t/96 () ()
119796 11h/96 OFFICIAL RECORD COPY 03003G
Houston Lighting & Power Company NOV 2 71996 bec to DMB (IE01) bec distrib. by RIV:
L. J. Callan Resident Inspector DRP Director DRS-PSB Branch Chief (DRP/A)
MIS System Project Engineer (DRP/A)
RIV File Branch Chief (DRP/TSS)
R. Bachmann, OGC (MS: 15-B-18)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
R. V. Azua (DRP/TSS)
J l
DOCUMENT NAME: G:\\DRPDIR\\SPPR\\STP.LTR To receive copy of document, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy RIV:DRP/A C:DRP/A AD:DRS Q
D:DRP A7 RAKopriva:df Sjf JITapia Q KEBrockmar)nj JEDyer&lj$
11//f 96 11 AQ/96 () Q 11M96 11 tg/96 f
OFFICIAL RECORD COPY
- 1 i
- --r
ENCLOSURE SOUTH TEXAS PROJECT INSPECTION PLAN IP - Inspection Procedure Tl - Temporary instruction Core Inspection - Minimum NRC inspection Program (mandatory all plants)
INSPECTION TITLE /
NUMBER OF DATES TYPE OF PROGRAM AREA INSPECTORS INSPECTION / COMMENTS IP 40501 Engineering - Licensee Self-Assessment 2
01/06-10/97 Regional Initiative in lieu of Core Inspection IP 86750 Solid Radioactive Waste Management and 1
01/27-31/97 Core inspection TI-133 Transportation of Radioactive Materials IP 84750 Radioactive Waste Treatment, and Effluent 2
02/03-07/97 Core inspection and Environmental Monitoring IP 81700 Physical Security Program for Power 2
02/24-28/97 Core inspection TI-132 Reactors IP 71001 Licensed Operator Requalification Program 3
07/28-8/1/97 Core inspection Evaluation IP 62706 Maintenance Rule Audit 6
05/12-16/97 Regional Initiative Team Inspection
-baseline inspection for maintenance program IP 40500 Effectiveness of Licensee Controls in 3
06/23-27/97 Core inspection Identifying, Resolving, and Preventing 07/07-11/97 Problems