e g "f %q UNITED STAVES
/
k NUCLEAR REGULATORY COMMISSION
[
REGloN IV e T.
" y, y e S ?*
g 611 RYAN PLAZA DRIVE, SUIT E 400 9....8 4
i AR LINGToN, T E XAS 76011-8064 NOV 2 71996 T. L. Patterson, Division Manager Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399, Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399
SUBJECT:
SEMIANNUAL PLANT PERFORMANCE REVIEW - FORT CALHOUN STATION On October 29,1996, the NRC staff completed the Semiannual Plant Performance Review (SPPR) of Fort Calhoun Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources.
The SPPR for Fort Calhoun Station involved the participation of all technical divisions in j
evaluating inspection results and safety performance information for the period March l
1996 through September 1996. SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Fort Calhoun Station SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months.
The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.
We willinform you of any changes to the inspection plan. if you have any questions, please contact W. D Johnson at (817) 860-8148.
Sincerely, ht h J. E.
yer, Director
- Division of Reactor Projects l
l Docket Nos.: 50-285 License Nos.: DPR-40
Enclosure:
Inspection Plan i
2030164 961127 G
ADOCK 05000285 PDR i
i
i Omaha Public Power District i cc w/ enclosure:
Perry D. Robinson, Esq.
{
Winston & Strawn 1400 L. Street, N.W.
Washington, D.C. 20005-3502 Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 James W. Chase, Manager Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023
-Omaha Public Power District NOV 2 71996 bcc to DMB (IE01) bec distrib. by RIV:
L. J. Callan DRS-PSB DRP Director MIS System Branch Chief (DRP/B)
RIV File Project Engineer (DRP/B)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Branch Chief (DRP/TSS)
Resident inspector Project Engineer (TSS)
DOCUMENT NAME: R:\\DRPDIR\\SPPR\\FCS.LTR t
To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy PE:DRP/B C:DRP/B l D:DRS AJ_ D:DRPy l, l
DNGraves:cm p WDJohnsonfp TPGwynnpV )f JEDyefAO P 11/ ) /96 11/[/ /96'
~
11/2)/96 8
11/ t /96 t
i OFFICIAL RECORD COPY l
l
l Omaha Public Power District l NOV 2 71996 g bec.to DMB (tE0H;7 bcc distrib. by RIV:
L. J. Callan DRS-PSB DRP Director MIS System Branch Chief (DRP/B)
RIV File Project Engineer (DRP/B)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Branch Cnief (DRP/TSS)
Resident inspector Project Engineer (TSS)
I DOCUMENT NAME: R:\\DRPDIR\\SPPR\\FCS.LTR To receive copy of document. Indicate in box: "c" = Copy without enclosures "E" = Copy with enclosures "N" = No copy i
PE:DRP/B C:DRP/B D:DRS
_d_ D:DRP y f
DNGraves:cm p WDJohnsony'p TPGwynnpV 7 JEDye(W f j
11/ qt /96 11/6 /96 11/[/ /96'
~
11/3 /96 V
OFFICIAL RECORD COPY 030039
ENCLOSURE FORT CALHOUN STATION INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION TITLE /
NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS IP 71001 Licensed Operator 3
11/18-22/96 Core Inspection Requalification Program Evaluation IP 71715 Sustained Control Room and 3 (same as 11/18-22/96 Area of Emphasis - SALP board recommendation Plant Observation 71001) due to perception of lack of operations ownership IP 37001 10 CFR 50.59 Safety 1
2/10-14/97 Area of Emphasis - Due to concerns regarding Evaluation Program licensing basis, design basis, and USAR accuracy IP 37550 Engineering 3
2/10-14/97 Core inspection 2/24-28/97 IP 64704 Fire Protection Program 1
2/24-28/97 Core inspection Tl 2515/132 Malevolent Use of Vehicles at 2
3/24-28/97 Temporary Instruction Nuclear Power Plants IP 40500 Effectiveness of Licensee 3
4/14-18/97 Core inspection Controls in identifying, 4/28-5/2/97 Resolving, and Preventing Problems
..