Advises of NRC Planned Insp Effort Resulting from 961030 River Bend Station Sppr Review
ML20135A239
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/27/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
References
NUDOCS 9612030130
Download: ML20135A239 (6)


Text

. .

t UNITED STA?ES

[g k" "%,[*g

,, NUCLEAR REGULATORY COMMISSION h-e_

e

- g

$ HEGloN Iv 3 e 4 611 RYAN PLAZA DRIVE. SUITE 400

~#

i n AR LINGToN. TE XAS 76011 8064 NOV 2 7 B96 John R. McGaha, Vice President - Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francieville, Louisiana 70775

SUBJECT:

SEMIANNUAL PLANT PERFORMANCE REVIEW - RIVER BEND STATION On October 30,1996, the NRC staff completed the Semiannual Plant Performance Review (SPPR) for the River Bend Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The SPPR for River Bend Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March to October 1996. SPPRs provide NRC management with a current summary of licensee performance and serve as inputs into the NRC Systematic Assessment of Licensee Performance and Senior Management Meeting reviews.

This letter advises you of our planned inspection effort resulting from the River Bend Station SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of j inspector arrival onsite. The enclosure details our inspection plan for the next 8 months.

Our review identified that personnel performance errors have increased in all functional areas. This was evidenced by system configuration control problems, inservice testing program implementation problems, missed surveillance tests, implementation errors in design activities, and inattention to details by personnel during implementation of radiation >

protection activities.

Since your current SALP period ends on February 1,1997, you will be informed of any changes to your inspection schedule following the SALP Board meeting and development of the new Master inspection Plan. Resident inspections are not listed because of their ongoing and continuous nature.

If you have any questions, please contact Phil Harrell at 817/860-8250.

l Sincerely, j i

y J. E. yer, Director k Division of Reactor Projects Docket No: 50-458 License Nos.: NPF-47 9612030130 961127 PDR ADOCK 05000458 G PDR . j

i < = _

l l

- Entergy Operations, Inc.  !

i l

l-  !

l

Enclosure:

i inspection Plan cc w/ enclosure:  ;

Executive Vice President and i l

Chief Operating Officer. l l . Entergy Operations, Inc. !I i

P.O. Box 31995 - '

Jackson, Mississippi 39286-1995 j l

Vice President l Operations Support i Entergy Operations, Inc. l P.O. Box 31995 l Jackson, Mississippi 39286 1995  ;

i General Manager l

j. Plant Operations River Bend Station '

j Entergy Operations, Inc.

I P.O. Box 220 l St. Francisville, Louisiana 70775 I Director - Nuclear Safety l_

River Bend Station l Entergy Operations, Inc.

P.O. Box 220 l St. Francisville, Louisiana 70775

. Wise, Carter, Child &' Caraway l P.O. Box 651 l Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.

Winston & Strawn l 1401 L Street, N.W.

( .. Washington, D.C. 20005-3502 l

l Manager - Licensing River Bend Station Entergy Operations, Inc.

l P.O. Box 220 j - St. Francisville, Louisiana 70775 i

i l

i

- v .1,. ,, - -.. - - . - - ,

Entergy Operations, Inc. i i

The Honorable Richard P. leyoub  !

Attorney General P.O. Box 94095 i Baton Rouge, Louisiana 70804-9095 H. Anne Plettinger

'3456 Villa Rose Drive .

Baton Rouge, Louisiana 70806 i President of West Feliciana  ;

Police Jury P.O. Box 1921 i St. Francisville, Louisiana 70775 i Larry G. Johnson, Director l Systems Engineering l Cajun Electric Power Coop. Inc.  ;

- 10719 Airline Highway P.O. Box 15540 Baton Rouge, Louisiana 70895 William H. Spell, Administrator  !

Louisiana Radiation Protection Division P.O. Box 82135 1 Baton Rouge, Louisiana 70884-2135  !

6

?

.f

-l*

i I:

r-f 1 ,

l -

l i

r - _,

.. _ . . . _ . _ - ~ . . . - __ - . _ . . . ~ _ . _ - . _ . . _ _ _ . _ ..... . . . _ . . . _

Entergy Operations, Inc. NOV 271996 bec to DMB (IE01) bec distrib. by RIV:  :

L. J. Callan Senior Resident inspector (Grand Gulf)

DRP Director DRS-PSB l

Branch Chief (DRP/D) MIS System Project Engineer (DRP/D) RI V File Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident inspector R. V. Azua (DRP/TSS)

DOCUMENT NAME: G:\DRPDIR\SPPR\RB.LTR To receive copy of document, Indicate in box: "c" = Copy without enclosures "E" = Copy with enclosures "N" = No copy PE:DR,P/Ds C:DRP/p n D:DRS p D:DRP(Jpf) i GAPilik'@ @ PHHK W C TPGwynn[jY V JEDye M y l 11/K /96 11/X/96 ' 11/ f}/96' ,

11/g]/96 "

OFFICIAL RECORD COPY

1 1

I Entergy Operations, Inc.' 1 NOV 2T 1996 1 1

1 liscit6DMS flE01)J7 bec distrib. by RIV:

. L. J. Callan Senior Resident Inspector (Grand Gulf)

DRP Director DRS-PSB Branch Chief (DRP/D) MIS Systern Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident inspector R. V. Azua (DRP/TSS) l 4

DOCUMENT NAME: G:\DRPDIR\SPPR\RB.LTR-To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy j PE:DRP/D 3 C:DRP/p n D:DRS p D:DRPjpf)

/ ,

G A Pif f g k PHH)bgjlAfy TPGwynn()Y T/ JEDye M (T '

11/95/96 11/d(/96 ' ~ 11/ 7]/96 11/g]/96 "

OFFICIAL RECORD COPY 030038 u . -

ENCLOSURE .

RIVER BEND STATION INSPECTION PLAN IP - Inspection Procedure Tl - Temporary instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE / NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS SAFTEY 3 01/6-10 &

IP 40500 ASSESSMENT / QUALITY 01/20-24/97 CORE INSPECTION VERIFICATION Ti 2515/132 MALEVOLENT USE OF 1 01/06-10/97 SAFETYISSUE VEHICLES AT NUCLEAR POWER PLANTS Tl 2515/130 IMPLEMENTATION OF 3 01/27-31/96 SAFETYISSUE IMPROVED TECHNICAL SPECIFICATIONS IP 92902 FUEL INTEGRITY AND 1 03/31- REGIONAL INITIATIVE REACTOR SUBCRITICALITY 04/04/97 FOLLOWUP IP 62706 MAINTENANCE RULE AUDIT 6 04/07-11/97 REGIONAL INITI ATIVE

.