Text
i
- ~.. _.
_m
__..m._.
..m
_.... ~. _ _
" M %s UNITED STATES f.
,\\
NUCLEAR REGULATORY COMMISSION B
d.
.; i Q
M g
REGloN IV 8
611 RYAN PLAZA oRIVE, SulTE 400 e
O.
U
%...*.. /
AR LINGToN, TEXAS 76011-8064 NOV. 2 71996 G. R. Horn, Senior Vice President of Energy Supply Nebraska Public Power District 141415th Street i
l Columbus, Nebraska 68601 l
6i
SUBJECT:
SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR) - COOPER NUCLEAR STATION I
On November 3,1996, the NRC staff completed the Semiannual Plant Performance
~ Review (SPPR) of Cooper Nuclear Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The SPPR for Cooper Nuclear Station involved the
[
. participation of all technical divisions in evaluating inspection results and safety j
performance information for the period May through October. SPPRs provide NRC
]
i management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management 4
Meeting (SMM) reviews.
L
~ This letter advises you of our planned inspection effort resulting from the Cooper Nuclear Station SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months.
j The rationale or basis for each inspection outside the core inspection program is provided
]
so that you are aware of the reason for emphasis in these program areas. The regional initiative inspection scheduled is consistent with SALP assessments. A reactive inspection 4
. to review fire protection issues is also scheduled. Resident inspections are not listed due i
to their ongoing and continuous nature.
i i
We willinform you of any changes to the inspection plan if you have'any questions, please contact E. Collins of my staff at (817) 860 8291.
Sincerely, L
j I
h h J. E.
yer, Director i
Division of Reactor Projects
Enclosure:
i inspection Plan j
9612030165 961127 PDR ADOCK 05000298 i
G PDR
g Nebraska Public Power' District.
t I
h Docket No.: 50-298 i
License No.: DPR-46 A
cc w/ enclosure:
John R. McPhail, General Counsel j
Nebraska Public Power District P.O. Box 499 l
Columbus, Nebraska 68602-0499 i
f P..D. Graham, Vice President of Nuclear Energy l
Nebraska Public Power District
. P.O. Box 98 Brownville, Nebraska 68321 i
R
. Houston, Nuclear Licensing i
and Safety Manager Nebraska Public Power District P.O. Box 98 Brownville, Nebraska 68321 i
R. J. Singer, Manager-Nuclear Midwest Power 907 Walnut Street P.O. Box 657 Des Moines, Iowa 50303 Mr. Ron Stoddard -
Lincoln Electric System
)
11th and O Streets Lincoln, Nebraska 68508 1
Randolph Wood, Director Nebraska Department of Environmental Quality P.O. Box 98922 Lincoln, Nebraska 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, Nebraska 68305
I l
Nebraska Public Power District Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007
)
i Dr. Mark B. Horton, M.S.P.H.
Director j
Nebraska Department of Health P.O. Box 950070 Lincoln, Nebraska 68509-5007 j
R. A. Kucera, Department Director of Intergovernmental Cooperation Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Kansas Radiation Control Program Director l
~
i t
Nebraska Public Power District NOV 2 71996 4
g bec to' DMB (IE01),. ;
~
- g. a.,
bec distrib. by RIV:
i L. J. Callan Resident inspector j
DRP Director DRS-PSB l
Branch Chief (DRP/C)
MIS System Branch Chief (DRP/TSS)
RIV File Project Engineer (DRP/C)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10) l l
R. V. Azua, DRP 4
i i
2 i
1 b
3 s.
DOCUMENT NAME: G:\\DRPDIR\\SPPR\\CNS.LTR 1
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DRP/h C:DRP/Cf7 AD:DRS V
,D:DRP g g TReis;dfWw EECpilinfW KEBrockmaM JEDyerCUL 11/496 111.)/96 11$96 f
11/6796
(
V OFFICIAL RECORD COPY
\\
i 03nn,1A
Nebraska Public Power District NOV 2 71996 bec to DMB (IE01) i bec distrib. by RIV:
i L. J. Callan Resident inspector DRP Director DRS-PSB Branch Chief (DRP/C)
MIS System Branch Chief (DRP/TSS)
RIV File Project Engineer (DRP/C)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
R. V. Azua, DRP i
l l
1 i
i i
DOCUMENT NAME: G:\\DRPDIR\\SPPR\\CNS.LTR To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DRP/h l C:DRP/Cg AD:DRS d
,D : D R P g }
TReis;dfWM EECpilinfM KEBrockmaW JEDyerCUL 11/496 11l)/96 11$96 f
11/L796 V
OFFICIAL R2 CORD COPY I
s-
4 4
ENCLOSURE COOPER NUCLEAR STATION INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION TITLE /
NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS IP 40500 Effectiveness of Licensee 11/18-22/96 Core inspection Controls in Identifying and 3
12/9-13/96 Resolving Problems IP 64704 Fire Protection 11/18-22/96 Reactive Inspection - Safe Shutdown Circuitry 2
11/18-21/96 Full-Scale Exercise IP 71001 Operator Requalification 2
12/2-6/96 Core inspection Inspection IP 81700 Physical Security 1
12/9-13/96 Core Inspection IP 83728 ALARA 1
12/9-13/96 Regional Initiative IP 73753 Inservice Inspection 1
4/7-12/97 Regional Initiative Tl132 Malevolent Use of Vehicles 1
4/7-12/97 Safety Initiative i