Informs That on 961030,NRC Completed Semiannual PPR for All Operating NPPs to Develop Integrated Understanding of Safety Performance.Details of Insp Plan for Next 8 Months Encl
ML20135A234
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/27/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 9612030127
Download: ML20135A234 (6)


Text

1

. p ""'Go UNITED STATES

,-  % NUCLEAR REGULATORY COMMISSION R EGloN iv

"" 611 RYAN PLAZA DRIVE. SUITE 400 9.....# AR LING ton. T E XAS 76011 8064 NOV 2 71996 Mr. C. L. Terry TU Electric Group Vice President, Nuclear  !

ATTN: Regulatory Affairs Department P.O. Box 1002 l Glen Rose, Texas 76043  !

SUBJECT:

SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR) - 1

- COMANCHE PEAK STEAM ELECTRIC STATION l

Dear Mr. Terry:

On October 30,1996, the NRC staff completed the Semiannual Plant Performance Review (SPPR) of Comanche Peak Steam Electric Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The SPPR for Comanche Peak Steam Electric Station  !

involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period of March through September 1996. SPPRs provide NRC management with a current summary of licensee performance and serve as '

inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Comanche Peak Steam Electric Station SPPR review, it is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.

Resident inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan. If you have any questions, please contact Joseph I. Tapia of my staff at 817/860-8243. i Sincerely, d .

' h J. E. yer, Director Division of Reactor Projects Docket Nos.: 50-445

50-446 License Nos.
NPF-87 NPF-89 d

9612030127 96112745 DR ADOCK 05 j

1 TU Electric

Enclosure:

Inspection Plan cc w/ enclosure:

Mr. Roger D. Walker TU Electric Regulatory Affairs Manager P.O. Box 1002 Glen Rose, Texas 76043 Juanita Ellis President - CASE i 1426 South Polk Street )

Dallas, Texas 75224

)

TU Electric Bethesda Licensing 3 Metro Center, Suite 610 Bethesda, Maryland 20814 i

George L. Edgar, Esq.

Morgan, Lewis & Bockius 1800 M. Street, NW Washington, D.C. 20036 G. R. Bynog, Program Manager /

Chief Inspector ,

Texas Department of Licensing & Regulation '

Boiler Division P.O. Box 12157, Capitol Station Austin, Texas 78711 Honorable Dale McPherson County Judge P.O. Box 851 Glen Rose, Texas 76043 i Texas Radiation Control Program Director

1100 West 49th Street Austin, Texas 78756 l

l 4

TU Electric Susan Rieff, Director Environmental Policy Office of the Governor P.O. Box 12428 Austin, Texas 78711 i

I i

I I

i l

l

)

' TU Electric NOV 2 71996 EEc"tED51BT(IE01)Mg;

- bec distrib. by RIV:

L. J. Callan Resident inspector (2)

DRP Director DRS-PSB Branch Chief (DRP/A) MIS System Project Engineer (DRP/A) RIV File Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

R. V. Azua (DRP/TSS) i l

l i

l l

'i DOCUMENT NAME: G:\DRPDIR\SPPR\CP.LTR  !

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy l RIV:DRP/A C:DRP/A , ,

AD:DRS d _D:DRPg , !j RAKopriva;df /Ag JITapia WM KEBrockma(f / JEDye7 t

" i 11//496 114.{/96 \) % 11/.p96 11g)/96 OFFICIAL RECORD COPY l

030043

4 TU Electric NOV 2 71996 4

bec to DMB (IE01) bec distrib. by RIV:

L. J. Callan Resident inspector (2)  !

DRP Director DRS-PSB  !

Branch Chief (DRP/A) MIS System

' Project Engineer (DRP/A)

RI V File 3 Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

R. V. Azua (DRP/TSS) i A

b f

d i

l' DOCUMENT NAME: G:\DRPDIR\SPPR\CP.LTR To receive copy of document, indicate in box: "C"

  • Copy wRhout enclosures "E" = Copy with enclosures "N" = No copy 4

i RIV:DRP/A C:DRP/A , AD:DRS d D:DRPng ,

RAKopriva;df Adf JITapia %$ KEBrockmaf f [JEDye7 1 11//W96 114{/96\) i 11/J'96 11g)/96 l l OFFICIAL RECORD COPY i

5 r._

ENCLOSURE ,'

COMANCHE PEAK STEAM ELECTRIC STATION INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE / NUMBER OF DATES TYPE OF PROGRAM AREA INSPECTORS INSPECTION / COMMENTS iP 83750 Occupational Radiation Exposure 2 11/18-22/97 Core inspection TI-132 IP 81700 Physical Security Program for Power Reactors 2 01/06-10/97 Core inspection IP 40501 Engineeering - Licensee Self-Assessment 2 01/27-31/97 Regional Initiative in lieu of Core Inspection - 2nd week to be determined IP 82701 EP OS Status 2 02/10/97 Core Inspection IP 84750 Radioactive Waste Treatment, and Effluent and 1 02/10-14/97 Core inspection Environmental Monitoring IP 92903 Followup - Engineering 2 02/24-28/97 Regiona; initiative - Steam Generator Tube Integrity Review IP 83750 Occupational Radiation Exposure 1 02/24-28/97 Core inspection t IP 81700 Physical Security Program for Power Reactors 2 03/17-21/97 Core Inspection IP 86750 Solid Radioactive Waste Management and 2 03/31-04/04/97 Core Inspection TI-133 Transportation of Radioactive Materials IP 71001 Licensed Operator Requalification Program 2 04/07-11/97 Core inspection Evaluation IP 40500 Effectiveness of Licensee Controls in 3 04/14-18/97 Core inspection Identifying, Resolving, and Preventing 04/28-05/01/97 Problems

-- - - - __ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ -