Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134M587 + (ML20134M587)
- 05000341/LER-1996-015, :on 961015,ESF Actuation of Division 2 EECW Occurred During Fill & Vent Evolution of Portion of Sys Located in Drywell Due to Personnel Error.Licensed & non-licensed Operators Were Trained + (ML20134M588)
- ML20134M589 + (ML20134M589)
- ML20134M590 + (ML20134M590)
- ML20134M591 + (ML20134M591)
- ML20134M592 + (ML20134M592)
- ML20134M594 + (ML20134M594)
- ML20134M595 + (ML20134M595)
- ML20134M596 + (ML20134M596)
- 05000309/LER-1996-032, :on 961016,NNS Load Connected to 1E Power Source Without an Isolation Device Identified.Cause Unknown. TV-4001 Part of Circuit Isolated by Opening Slide Links in Mcb & Controlling Slide Links W/Tag Order + (ML20134M597)
- ML20134M598 + (ML20134M598)
- PY-CEI-NRR-2114, Submits Actions That Will Be Implemented by 970317 in Response to GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs + (ML20134M599)
- ST-HL-AE-1345, Provides Schedule for Response to Generic Ltr 85-12, Implementation of TMI Action Item II.K.3.5, `Automatic Trip of Reactor Coolant Pumps. Info in Parts B & C of Safety Evaluation Will Be Submitted by 851101 + (ML20134M600)
- 3F0297-06, Requests Changes to Svc List & Informs NRC from Whom to Expect to Receive Docketed Items + (ML20134M601)
- NG-96-2344, Forwards NRC Form 474, Simulator Facility Certification, Due to Changes in Performance Testing Plan,Per 10CFR55.45. Description of Performance Tests Completed from Apr 1995 to Apr 1996 & Performance Test Schedule for 1996-1999,encl + (ML20134M602)
- BECO-85-158, Provides Clarification to Design Info Submitted on 850530 for TMI Items II.B.3 Re post-accident Sampling Sys & II.F.1(6) Re H2/O2 Monitoring Sys.Corrected Table of Analysis Methods & Detection Limits for H2 & O2 Provided + (ML20134M603)
- 05000309/LER-1996-033, :on 961018,entry Into TS 3.0.A for Both Pressurizer Proportional Heater Banks Inoperable Occurred. Caused by Fuse Failure.Fuse & SCR Were Replaced + (ML20134M605)
- ML20134M606 + (ML20134M606)
- NG-96-2452, Forwards Duane Arnold Energy Ctr Cycle 15 COLR, Rev 0 + (ML20134M608)
- ML20134M610 + (ML20134M610)
- ML20134M611 + (ML20134M611)
- ML20134M613 + (ML20134M613)
- ML20134M614 + (ML20134M614)
- IR 05000369/1985026 + (ML20134M615)
- ML20134M616 + (ML20134M616)
- ML20134M617 + (ML20134M617)
- 05000425/LER-1996-007-02, :on 961015,inadequately Performed Surveillance Resulted in Inoperable RHR Pump.Caused by Failure to Clean Up Areas in Containment as Work Was Completed.All Uncontrolled Matls Were Removed + (ML20134M618)
- ML20134M619 + (ML20134M619)
- B11660, Provides Informational Update of Analysis of Plant Auxiliary Feedwater Sys.Increased Primary Sys Pressure Predicted for Loss of Main Feedwater Event Has No Unacceptable Safety Impact + (ML20134M620)
- ML20134M621 + (ML20134M621)
- ML20134M623 + (ML20134M623)
- ML20134M624 + (ML20134M624)
- ML20134M627 + (ML20134M627)
- ML20134M628 + (ML20134M628)
- ML20134M629 + (ML20134M629)
- ML20134M631 + (ML20134M631)
- ML20134M632 + (ML20134M632)
- ML20134M633 + (ML20134M633)
- ML20134M634 + (ML20134M634)
- ML20134M635 + (ML20134M635)
- ML20134M636 + (ML20134M636)
- ML20134M637 + (ML20134M637)
- ML20134M638 + (ML20134M638)
- ML20134M640 + (ML20134M640)
- ML20134M642 + (ML20134M642)
- ML20134M643 + (ML20134M643)
- ML20134M644 + (ML20134M644)
- B16220, Revises 820401 Commitment for NUREG-0737,TMI Action Item I.C.6 + (ML20134M645)
- ML20134M646 + (ML20134M646)
- ML20134M647 + (ML20134M647)
- 05000302/LER-1996-022, :on 961122,operation Outside of 10CFR50 App R Design Basis Occurred.Caused by Design Error.Will Perform Top to Bottom Exam of post-fire Shutdown Analysis & Implement Appropriate Modifications + (ML20134M648)